Project Birla Alokya had a non-conformance report issued on December 8, 2023 regarding water leakages below three flats due to issues with plumbing pipes and fittings. The contractor SPTL was issued the NCR and given until December 12, 2023 to address the water leakages below Flats 1, 27-01, and 40-32 caused by a cracked FWS pipe, damaged elbow, and damaged FTA respectively.
Project Birla Alokya had a non-conformance report issued on December 8, 2023 regarding water leakages below three flats due to issues with plumbing pipes and fittings. The contractor SPTL was issued the NCR and given until December 12, 2023 to address the water leakages below Flats 1, 27-01, and 40-32 caused by a cracked FWS pipe, damaged elbow, and damaged FTA respectively.
Project Birla Alokya had a non-conformance report issued on December 8, 2023 regarding water leakages below three flats due to issues with plumbing pipes and fittings. The contractor SPTL was issued the NCR and given until December 12, 2023 to address the water leakages below Flats 1, 27-01, and 40-32 caused by a cracked FWS pipe, damaged elbow, and damaged FTA respectively.
Issued by Designation manager Issued Date 8/12/2023 Sign Name Raju Target Completion Issued to Designation Project Manager 12/12/2023 Sign Date
It has been noticed that water leakages below Flats 1.due to
FWS pipe crack B40-22 (CT) 2. water leakages Details of Non conformance B27-01 (MBT) due to Elbow damaged 3.water leakages in B40-32 (MBT) due to FTA damaged
Evidence
Accepted
NCR closure verification
Clousre Report comments
Rejected
Name Verified by Designation Verfication Date Sign