Quantum Audit list-2023
Omega- Architectural and Statutory Issues
DS Feedback:
Approved
The push bars for fire doors are Missing fire door will be
to be provided in all the three installed.
buildings. (Already available Each of the fire door has
Rs.
ground and office floors of Block Most door closure. 30 November,
2 B Block Denali 12,50,00
B & C). Critical Cost captured is 2023
0
In Block C - Basement 3, 1no. inappropriate - fire door
FRD for staircase is missing on should not cost more
site. than a lakh rupees.
Quantum Audit list-2023
Omega- Structural
Planned
Dampness/Leakage from slab
Rs. 6,00,00,000 improvement -
due to cracks and Most
3 A&B Block Denali (Part of will be 31 January, 2024
accumulation of water on floor Critical
seepages) completed in 6
above.
months time.
DS Feedback: Approved Status: Procurement in progress, approval from DS procurement pending
Quantum Audit list-2023
Omega- Structural
Planned
improvement -
Dampness from Retaining Most Part of
4 B&C Block Denali will be 31 January, 2024
wall in Basement Critical seepages
completed in 6
months time.
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
NBC 2016 not
Openable vents: maximum are locked Most QC- Rs.
6 A block Client Scope applicable for N/A
with screws, periphery sealants. Critical 9,90,000
this building.
Sn Tentative
Location Description Issue Responsibility Cost DS remarks
o. Closure
NBC 2016 not
Openable vents: maximum are locked Most QC-Rs.
7 B block Client Scope applicable for N/A
with screws, periphery sealants. Critical 6,00,000
this building.
DS Feedback: To communicate with Client for action
Quantum Audit list-2023
Omega- Facade
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
Openable vents: maximum are NBC 2016 not
Most QC- Rs.
8 C block locked with screws, periphery Client Scope applicable for N/A
Critical 6,00,000
sealants. this building.
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
Observed openable vents are
Most QC- Rs. Will inform
9 A Block covered with fixed Client Scope N/A
Critical 5,00,000 clients.
working/computer tables.
DS Feedback: Need to obtain quote for façade audit Status: DS has sent Saint Gobain for assessment of the facade
Quantum Audit list-2023
Omega- Facade
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
ACP in all critical spaces is
To replace ACP fixed on civil masonry 31
Most
11 B Block cladding with new FR AEI Rs. 1,00,00,000 wall, as such fire rated ACP December,
Critical
Grade ACP. is not required. Drawings 2023
have been shared.
Quantum Audit list-2023
Omega- Facade
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
ACP in all critical spaces is
To replace ACP fixed on civil masonry wall, as
Most Rs. 31 December,
11 C Block cladding with new AEI such fire rated ACP is not
Critical 1,00,00,000 2023
FR Grade ACP. required. Drawings have been
shared.
Quantum Audit list-2023
Omega- Environment
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
Regular annual
submissions are being
Compliance to EC
Most done as required by the
12 Campus & Consent To Denali Rs. 50,000 Closed
Critical authorities. Request you to
Operate (CTO).
share the format/report
Quantum Audit list-2023
Omega- Environment
Sn
Location Description Issue Responsibility Cost DS remarks Tentative Closure
o.
Waste generated us
being disposed
Log/record for daily generation,
Most through the Logs provided,
13 Campus storage and disposal of hazardous Denali Rs. 10,000
Critical Authorized vendor. Closed
waste shall be maintained.
Disposal report
attached.
Quantum Audit list-2023
Omega- MEPF
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
The same cannot be done as it
requires lift up the chiller platform
Chiller installation 31
Rs. by minimum of 600mm. Hence its
14 B Block To reinstall valve and Critical Denali December,
15,00,000 not feasible and also there are no
chiller as per standard. 2023
issues raised from O&M
perspective.
DS Feedback: Not Possible
Quantum Audit list-2023
Omega- MEPF
Sn
Location Description Issue Responsibility Cost DS remarks Denali Remarks
o.
Refuge Area MEP Work
The foot over
work such as first aid box, fire
NBC 2016 not bridge between
extinguishers, public address speaker,
16 B &C Block Critical Denali Rs. 5,00,000 applicable for B& C block is
fire man talk back, and adequate
this building. considered as
emergency lighting, sprinkler as well as
refuge area
drinking water facility are balance.
Sno
Location Description Issue Responsibility Cost DS remarks Tentative Closure
.
Not part of any
(QC- Rs.
30,00,000) lease
BMS - Tank Water Level and
DS remarks- commitment with No action to be
17 All Blocks control/operation of water Critical Denali
Not tenant in the taken as of now
transfer Pump
Applicable entire portfolio
of DivyaSree
DS Feedback: Not Approved
Quantum Audit list-2023
Omega- Structural
Sn
Location Description Issue Responsibility Cost DS remarks Tentative Closure
o.
Planned
Honeycombing & Spalling of
improvement -
Concrete with Reinforcement Part of 31 January,
18 A, B& C Blocks Critical Denali will be
exposed & corroded in RCC seepages 2024
completed in 6
members
months time.
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
We have informed
Cleaning System
the vendor to use
Cleaning is happening with
Gandola for the
spider-man and they are tying the Rs. 31 December,
21 A Block Critical Denali cleaning activity so
ropes to columns, Proper 10,00,000 2023
as to avoid
cleaning system to be used to
damages to the
avoid breakage in ACP coping
ACP sheets
DS Feedback: Eye bolt provision to be considered Status: Pending approval from DS management
Quantum Audit list-2023
Omega- Facade
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
We have
Rs.
Observed non cleaning of increased the
6,50,000
22 A Block façade particularly at corner Critical Denali frequency of Closed
(Annual
glazing. cleaning to Bi -
cost)
Monthly
Quantum Audit list-2023
Omega- Facade
Sn Tentative
Location Description Risk Category Responsibility Cost DS remarks
o. closure
We have informed
Cleaning System
the vendor to use
Cleaning is happening with spider-
Gandola for the
man and they are tying the ropes to Rs. 31 December,
26 C Block Medium Denali cleaning activity
columns, Proper cleaning system 10,00,000 2023
so as to avoid
to be used to avoid breakage in
damages to the
ACP coping
ACP sheets
DS Feedback: Eye bolt provision to be considered Status: Pending approval from DS management
Quantum Audit list-2023
Omega- Environment
Tentative
Sno. Location Description Issue Responsibility Cost DS remarks
Closure
Have common STP
for A & B. C block
Sewage waste water is directly
Rs. the STP is separate. 31 January,
29 Campus sent to public sewers. No STP is Critical Denali
1,00,00,000 Please refer the 2024
provided
drawings shared
earlier.
Status: Approval pending from DS management
Quantum Audit list-2023
Omega- Environment