You are on page 1of 4

Avenue 1,2 &3 - Shop Drawing - Swimming Pool - Coordination - Architectural with MEP

Project Name: Avenue Project Code: AVN

Client: Ms AZIZI DEVELOPMENTS Submittal Number: AVN-GBC-WF161661

M/s 360 Architectural Design Consultancy


Consultant: Date: 31/07/2023
LLc

Contractor: Gardinia Building Contracting LLC Sub-discipline: SWIMMING POOL

Discipline: Landscape Specification ref: N/A

BOQ: Old Reference MS-GC-LS-AV-0040, REV.01

Sub-contractor

Baniyas Pool

DOCUMENT NUMBER REVISION TITLE TYPE STATUS


Swimming Pool - MEP
AVN-GBC-AV3-1FR-LAE-MAR-
01 Package - Baniyas Pool Material Submittal Approved As Noted
0002
(Avenue-3)

Final Review and Comments

Submittal Status: Completed Date: 05/08/2023

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Avenue 1,2 &3 - Shop Drawing - Swimming Pool - Coordination - Architectural with MEP

Gardinia Review STATUS: Completed

APPROVER: Prashanth Rao (GBC) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Checked and
01 31/07/2023
LAE-MAR-0002 Baniyas Pool Submittal Verified
(Avenue-3)
Comments:

Gardinia Review STATUS: Completed

APPROVER: mohana mallegowda (GBC) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Checked and
01 31/07/2023
LAE-MAR-0002 Baniyas Pool Submittal Verified
(Avenue-3)
Comments:

GBC - Technical Manager STATUS: Skipped

APPROVER: Hussam Elghazaly (GBC) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material
01 Pending 01/08/2023
LAE-MAR-0002 Baniyas Pool Submittal
(Avenue-3)
This task has been skiped by Hussam Elghazaly (Gardinia Building Contracting LLC) due to refer to
Comments:
Landscape team comments

360 Review and Approval STATUS: Completed

APPROVER: Muhammad Rafique (360) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Checked and
01 01/08/2023
LAE-MAR-0002 Baniyas Pool Submittal Verified
(Avenue-3)
Comments:

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Avenue 1,2 &3 - Shop Drawing - Swimming Pool - Coordination - Architectural with MEP

360 Review and Approval STATUS: Completed

APPROVER: ahmad hamdan (360) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Approved As
01 01/08/2023
LAE-MAR-0002 Baniyas Pool Submittal Noted
(Avenue-3)
1. Include catalog and technical details of water level switches and solenoid valve in the submittal.
2. Submit make up water REQUIRMENTS calculation.
3. Pump efficiency shall be IE3.
4. Submit sequence of operation…etc.
5. Provide authorization certificate from manufacturer that the proposed supplier is authorized for
supply, installation and T&C for proposed material.
6. Provide sample warranty certificates for proposed material.
7. Provide tests certificates for proposed materials as per project specs and applicable regulations.
8. All slab and wall opening for the swimming pool shall be coordinated with MEP Builders Works
Draw
9. All MEP material to be as per project approved vendor list.
10. Submit MEP shop drawing (mechanical and electrical).
11. Submit all required method statements for installation and T&C.
12. All installation shall be executed by specialist authorized and trained personnel only.
13. Scope of work shall include all required works until handing over to client including approval from
Comments: authorities (as applicable).
14. All test/ installation certificates to be submitted after approval of Engineer and T&C.
15. Warranty, maintenance, spare parts, consumables…etc. shall be as per project specs.
16. Provide all required pressure breaking manholes, drain for chemicals and back filtration as per
project specs and applicable regulations.
17. The specialist contractor is responsible to maintain water quality as per the requirement of project
specs and applicable regulations.
18. Provide chemicals for One-year operation as per specification
19. Main contractor shall coordinate with MEP subcontractor and specialist to provide shop drawings
including all requirements (pump room coordination, pressure breaking manholes, tanks, floor drains,
water supply, power supply…etc.) and shall provide as built drawings
20. MI should be submitted within 24 hours from material delivery on site.
21. Provide COO, BOL, PL and FAT upon delivery

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Avenue 1,2 &3 - Shop Drawing - Swimming Pool - Coordination - Architectural with MEP

360 Review and Approval STATUS: Completed

APPROVER: Rommel Miranda (360) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Approved As
01 01/08/2023
LAE-MAR-0002 Baniyas Pool Submittal Noted
(Avenue-3)
1. SEPARATE SUBMISSION FOR THE SHOP DRAWINGS MUST BE DONE.
2. SAMPLE FOR POOL LIGHTS MUST BE DONE SUBJECT TO ARCHITECT'S SELECTION AND
Comments: APPROVAL.
3. ALL NECESSARY POWER AND CONTROL MUST BE COORDINATED WITH ELECTRICAL
CONTRACTOR ACCORDING TO DEWA APPROVED LOAD SCHEDULE.

360 Review and Approval STATUS: Completed

APPROVER: Salman Chougle (360) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Approved As
01 01/08/2023
LAE-MAR-0002 Baniyas Pool Submittal Noted
(Avenue-3)
1. Refer to the previous Revision comments.
2. MAR & Physical Sample for the Underwater Lights to be submitted for approval.
3. Load Schedule, Voltage Drop & SLD to be submitted for approval from the Electrical Engineer.
4. Compliance of all the Mechanical, Electrical & Plumbing works to be as per the IFC & Technical
Specifications provided by the MEP Engineers for approval.
5. Shop Drawings to be submitted separately for approval.
6. All the Safety Equipment should be as per the approved Dubai Municipality Standards; loop the
Comments:
Safety Engineer for the approval.
7. Draft Warranty to be submitted as per the Project Specifications or as per the mutual agreement
with the Contractor.
8. All the finishes to be rust proof.
9. Full compliance with the Project Specifications & Authority Approvals is required.
10. Size confirmation should be coordinated as per the site openings as per the Tiling Layout for the
Swimming Pool.

360 - Project Manager STATUS: Completed

APPROVER: Tariq Qandah (360) ESCALATION:

Document No. Title Type Revision Status Received Date FILE REPLACED

Swimming Pool -
AVN-GBC-AV3-1FR- MEP Package - Material Approved As
01 04/08/2023
LAE-MAR-0002 Baniyas Pool Submittal Noted
(Avenue-3)
Comments: - Refer to Mech/ Elec/Arch Eng comments

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.