The document outlines the costs for hydrotesting four tanks over seven days total. It estimates $71,967 for the total costs of equipment rental, materials, supervision, and labor. With the total funds available of $40,000 in the budget, it would need to recover $31,967 in additional costs to cover the hydrotesting.
The document outlines the costs for hydrotesting four tanks over seven days total. It estimates $71,967 for the total costs of equipment rental, materials, supervision, and labor. With the total funds available of $40,000 in the budget, it would need to recover $31,967 in additional costs to cover the hydrotesting.
The document outlines the costs for hydrotesting four tanks over seven days total. It estimates $71,967 for the total costs of equipment rental, materials, supervision, and labor. With the total funds available of $40,000 in the budget, it would need to recover $31,967 in additional costs to cover the hydrotesting.
Total Funds Available for Hydrotest in Budget $ 40,000
Tank Fill Time 3 days
Hold 1 day Transfer 3 days Total Hire 7 days
1x Pump $ 300 per day
2x 6" Isolation valves $ 75 per day 1x 6" NRV $ 50 per day 2x Pressure Gauges $ 50 per day 2x 2" Isolation Valves for Level Gauge $ 50 per day HDPE Hose 200 m Length $ 200 per day Sub Total $ 725 per day Total for all 4x Tanks $ 20,300 Full HT Duration
Supervision and Labour Costs
1x TA + 1x Supervisor + 1x Fitter 3312 Per Shift Number of shifts 12 Number of shifts 12 Total Supervision Cost $ 51,667 Total Costs for 4x Tanks HT $ 71,967 Total Cost to be Recovered $ 31,967