#8 @ 150 C/C MESH NOTES :-

1. All dimensions are in mm and this drawing shall


LIGHTENING ARRESTOR
900
75 not be scaled .Written dimensions are to be
followed.
VENTILATOR WALL ROD #8 @ 150 C/C BOTHWAY 75
(SEE DETAILS) TO BE CASTED 600 75
VENTILATOR OPENING
ROUGH PREPARED JOINT SURFACE
SURFACE
2. Grade of concrete :RCC M-25,PCC M-10.
3 Nos. WITH WIRE MESH
TYPE 300
150 CONTINUATION OF STEEL
ALREADY CAST
150
#8 @ 175 C/C STIRRUPS
75
300 600
R.C.C Dome (M 25) 3. Grade of steel :Fe-500 tor steel (HYSD bars)
EXTRA RING 8# @ as per relavant code.
100
3750
MS LADDER 200 C/C WITH IN 600
CONSTRUCTION JOINT(TYP) R.C.C Dome (M 25)
600
150 4. Lap length /bond anchorage : 50 dia of bar.
DOME ROD DETAILS RB-A

DETAILS OF RING BEAM -A


150
5. Clear cover for foundation and footings as below
G.L F.G.L 8# @ 150 C/C RINGS
Foundation 50mm
#8 @ 200 C/C EXTRA Wall 30mm
ELEVATION RADIAL UPTO 600 FROM 8 TOR @ 200 C/C
RB-B AND #8 @ 200 C/C BOTHWAY MESH
Beam 35mm
RINGS OVER THIS RADIAL
600 Roof 25mm

900
Base slab 30mm
600
VENTILLATOR
6. Following items shall be provided and executed
75
600
2-#12 AT TOP AND BOTTOM
2 #8 10 EACH FACE
with scope,specifications and conditions as per
8 tor @
RB.A 150 x 150 600 75
300 FreeBoard
300 c/c stirrups
75
100 RCC Dome(M 25) specifications and provisions in agreement for
250
150 RB-B 200 x 250 Beam

200 x 250
MH
(300X300) 3NOS 200 #8 @ 160 C/C RINGS respective items.
900
AT EACH FACE FROM BASE TO TOP OF
MOSQUITO PROOF 600
R=4130 WIRE NETTING IN VENT
THE WALL
300
RB-B(M-25) 200X250 A. M.S ladder from G.L to roof and roof to floor .
FREE BOARD 300 150 UPTO 600 DIA
WALL (M25)
#8 @ 180C/C VERTICAL THROUGH OUT AT
100 Wall (M25) INNER FACE (BAR TO BE STAGGEREDMANNER B. Mosquitoes proof wire netting in vent.
150 TO OUTER FACE VERT.REINF.)

INLET PIPE
M.S LADDER
OVERFLOW PIPE G.L
EXTRA ROD AT OPENING C. M.H.C cover 2 Nos each 600 mm Dia C.I/R.C.C
hinged and lockable.
G.L
2400 #8 @ 180 C/C VERTICAL
4600 THROUGH OUT AT OUTER
FACE (BAR TO BE STAGGERED
600
1250 SLUDGE PIT
PCJ
MANNER TO INNER FACE VERT D. Water level indicator(Consisting of Nylon chord
450X450X300 REINF.
200
600 PCJ 150 50 x 600 Haunch float,pully,calibration ghauge etc.)complete set.
100 D.S.
100 FOOTING EXTRA REINFORCEMENT AROUND M.H & PIPE OPENING
E. Lightening arrestor(one set complete.)
2450
250
700 TO BE PROVIDED AT EACH FACE
PCC(M-10) 100 PCC(M-10) 100 #8 RADIAL @ 150 C/C AT TOP
BELOW SLAB BELOW FOOTING FACE IN R = 3100 TO R= 2400
TOE AND HEEL SLAB(SPACING
F. Piping and valve arrangement with dia ,
450
SECTION X-X MEASURED AT THE OUTER
#8 @ 200 C/C EXTRA RADIAL HOLDING 150 specification,limit of contract etc.based on
FACE OF THE WALL.) INCLINED BARS IN HUNCH
300
100 agreement provision taking on field condition
#8 @ 200 C/C EXTRA RINGS HOLDING
into account to be executed.
50 x 600 haunch INCLINED BARS IN HUNCH
G. 20mm thick cement plaster C.M (1:3) to inside
200MM THICK #8RINGS @ 180 C/C AT TOP FACE surface (wall,floor) with water proofing
FLOOR SLAB IN R=3050 TO R=2400
300 compound and neat cement punning .
200 THICK SLAB M25
H. Two coats of water proof cement paint to outer
P.C.J

2300 JOINT SEALING 450X450


INLET PIPE 400 COMPOUND
150

250 100
REINFORCEMENT OF SLUDGE PIT surface .
2400 2450
PCC M-10 100 300
BELOW TO BE PLACED SUITABLY
3100
X X
7. Other items if any left out not shown in drawing
FOOTING 50
100 200 250
shall be executed as per agreement and
150 300X300 PCC M-10 100 BELOW BASE SLAB
150
direction of Eng-In-Charge.
ALTERNATE BARS
5400 MM CONTAINER DIA TO BE EXTENDED
#8 RINGS @ UPTO 400mm #8 @ 200 C/C BOTHWAY
SLUDGE PIT
150 C/C AT
8. Work to be executed as per IS-456,IS-3370.
MESH THROUGHOUT
BOTTOM FACE
450X450X300 DEPTH INR= 3100 TO
AT BOTTOM AND TOP FACE
TO BE PLACED SEPARATELY #8 RADIAL@ 150 C/C AT BOTTOM R= 2400
OVERFLOW PIPE
450
FACE IN R=3100 TO R= 2400 TOE
& HEEL SLAB(SPACING TO BE
DETAILS OF SECTIONAL REINFORCEMENT 9. Strength of concrete,compaction and curing to
OUTLET PIPE
700
MEASURED AT THE OUTER FACE OF
THE WALL
3050 be ensured.
450

#8 RINGS @ 150 C/C


10. P.C.J and base slab as per IS -3370.
#8 RINGS @ 150 C/C
AT BOTTOM FACE
AT TOP FACE
IN R= 3100 TO R = 2400
IN R= 3100 TO R = 2400

FOUNDATION SLAB OF OUTER RADIUS =3100


WASHOUT TANK WALL OUTER RADIUS =2550
PLAN AT F.S.L TANK WALL INNER RADIUS =2300 FOR OFFICE USE
#8 RADIAL @ 150 C/C
N.B :- PIPING AND VALVE ARRANGEMENT TANK WALL FOOTING INNER RADIUS =2400
AT TOP FACE IN
SHOWN ARE INDICATIVE ONLY.THE R= 3100 TO R= 2400 SIGN OF AGENCY:
SAME ARE TO BE EXECUTED BASING TOE & HEEL SLAB
ON AGREEMENT FIELD CONDITION (SPACING MEASURED
AND DIRECTION OF ENGINEER IN #8 @ 200 C/C BOTHWAY
AT THE OUTER FACE OF PROJECT: W/S SYSTEM TO ISOLATED AREAS OF MILLPADA,JHANKERPALI,
CHARGE OF WORK. MESH AT BOTTOM FACE
THE WALL
UPTO R= 2750 TANGERPALI AND TIPUPADA AREA UNDER WATCO SECTION BARAIPALI
200 50
150 600 150
20 # BOLT AT EACH FACE 150 CLIENT: GENERAL MANAGER WATCO ,SAMBALPUR
2-# 12 AT TOP

Title : GA & STRUCTURAL DETAILS


250 #8 @ 160 C/C STIRRUP 100 20 # BOLT AT EACH FACE
LADDER 225X75X8 M.S FLAT AT EACH FACE #8 @ RADIAL BARS
225X75X8 M.S FLAT #8 @ 200 C/C BOTHWAY
50 2-# 12 AT BOTTOM
150 C/C AT BOTTOM FACE MESH THROUGHOUT
NAME : DESIGN ,CONSTRUCTION,TESTING & COMMISSIONING OF
MS LADDER WITH HAND RAIL
150 IN R= 3100 TO R=2400
TANK WALL (SPACING MEASURED AT
P.C.J 30KL CAPACITY RCC GSR AT TANGERPALI
WALL ROD EXTENDED TO INSIDE G.L G.L
BEAM OUTER FACE OF WALL
DRAWN
ROOF TO FLOOR NAME OF AGENCY: SUBIR SETH
TO BE AS PER AGREEMENT
& FIELD REQUIREMENT
1/2 BOTTOM PLAN OF FOOTING 1/2 TOP PLAN OF FOOTING
Drg no. Revision No :
AND BASE SLAB AND BASE SLAB
LOCATION SHEET NO:
DETAILS OF RING BEAM-B LADDER FIXING DETAIL OF G.L TO ROOF
01 01
TO BE AS PER AGREEMENT & FIELD REQUIREMENT 3050

DATE SCALE
LADDER FIXING DETAIL FOOTING AND BASE SLAB DETAILS
N.T.S