You are on page 1of 1

0729597774

Nairobi, Kenya CLIENT DETAILS

NAME:
ADDRESS:
CONTACT:-

16th OCT. 2022


RE. CIVIL WORKS BQ AND LABOR QUOTATION

BRIEF JOB DESCRIPTION


Supply and fixing ofpavemet Slabs 166 square feet

PART A: MATERIALS

ITEM QUANTITY UNIT COST TOTAL


(KES)
600 X 600 X 50mm paving 40pcs 400 16,000
slabs
Quarry dust 2 tonnes 1500 3,000
River sand 1/2 tonnes 2500 1,250
Cement 3 bags 700 2,100
Transport 3,000
Materials Total 25,350

PART B: LABOR
ITEM DESCRIPTION UNIT COST QUANTITY TOTAL
Slabs fixing Fix and joint keying 80 per 166 ft2 13,280
and finishing square feet
TOTAL 13,280

Prepared and compiled by:


Maurice Juma: 072959774

You might also like