RQP Road and Drainage R-6
RQP Road and Drainage R-6
ROW 5,3
Sand bed
ROW 6
C 100 mm Thick gravel class A with CBR 90% 618 m2 62,500 38,625,000
Sand bed
ROW 6.5
C 100 mm Thick gravel class A with CBR 90% 589 m2 62,500 36,812,500
Sand bed
ROW 7
C 100 mm Thick gravel class A with CBR 90% 14,338 m2 62,500 896,125,000
Sand bed
ROW 16
C 100 mm Thick gravel class A with CBR 90% 2,785 m2 62,500 174,037,500
Sand bed
SIDEWALK AT ROW 16
Sand bed
Collection
SUB BILL NO. 4.5.1 : ROADWORKS To Summary Sub Bill 4.5 Rp. 5,556,856,710
Street Inlet
Earthworks
B Excavate commencing of grading level to trench for pipe 1,055 m3 133,800 141,159,000
E Backfill with selected excavated material, for pipe 379 m3 55,600 21,072,400
Send bed
Pipe fittings
Formwork
Street Inlet
Sand bed
Pipe fittings
Formwork
Collection
SUB BILL NO. 4.5.2 : ROAD DRAINAGE To Summary Sub Bill 4.5 Rp. 4,271,163,650
SUB BILL NO. 4.5 : ROAD AND DRAINAGE To Summary Bill No 4 Rp. 9,828,020,360