17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha


Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses Arcadis Indonesia pt.

6.00 BILLS OF QUANTITIES

SUB BILL NO. 4.5 : ROAD AND DRAINAGE


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

ROW 5,3

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


A 72 m2 42,500 3,060,000
specified to receive road sub base

Road sub base as specified

B 350 mm Thick gravel class B with CBR 85 % 72 m2 44,850 3,229,200

C 100 mm Thick gravel class A with CBR 90% 72 m2 62,500 4,500,000

Road surfacing as specified

D 50mm Thick wearing course 69 m2 77,650 5,357,850

Sand bed

E Sand bed 50mm thick, under kerb 2 m2 38,500 92,400

Precast concrete kerb

Precast concrete kerb overall size 250 mm wide x 120 mm


F high complete with mortar bedding and jointing (Cansteen 24 m 188,500 4,524,000
Type 1 Drawing No. 40)

To Collection Rp. 20,763,450

6.Bill No. 4.5.1 /1


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

ROW 6

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


A 618 m2 42,500 26,265,000
specified to receive road sub base

Road sub base as specified

B 350 mm Thick gravel class B with CBR 85 % 618 m2 44,850 27,717,300

C 100 mm Thick gravel class A with CBR 90% 618 m2 62,500 38,625,000

Road surfacing as specified

D 50mm Thick wearing course 601 m2 77,650 46,667,650

Sand bed

E Sand bed 50mm thick, under kerb 21 m2 38,500 796,950

Precast concrete kerb

Precast concrete kerb overall size 250 mm wide x 120 mm


F high complete with mortar bedding and jointing (Cansteen 207 m 188,500 39,019,500
Type 1 Drawing No. 40)

To Collection Rp. 179,091,400

6.Bill No. 4.5.1 /2


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

ROW 6.5

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


A 589 m2 42,500 25,032,500
specified to receive road sub base

Road sub base as specified

B 350 mm Thick gravel class B with CBR 85 % 589 m2 44,850 26,416,650

C 100 mm Thick gravel class A with CBR 90% 589 m2 62,500 36,812,500

Road surfacing as specified

D 50mm Thick wearing course 583 m2 77,650 45,269,950

Sand bed

E Sand bed 50mm thick, under kerb 17 m2 38,500 666,050

Precast concrete kerb

Precast concrete kerb overall size 250 mm wide x 120 mm


F high complete with mortar bedding and jointing (Cansteen 173 m 188,500 32,610,500
Type 1 Drawing No. 40)

To Collection Rp. 166,808,150

6.Bill No. 4.5.1 /3


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

ROW 7

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


A 14,338 m2 42,500 609,365,000
specified to receive road sub base

Road sub base as specified

B 350 mm Thick gravel class B with CBR 85 % 14,338 m2 44,850 643,059,300

C 100 mm Thick gravel class A with CBR 90% 14,338 m2 62,500 896,125,000

Road surfacing as specified

D 50mm Thick wearing course 13,932 m2 77,650 1,081,819,800

Sand bed

E Sand bed 50mm thick, under kerb 418 m2 38,500 16,081,450

Precast concrete kerb

Precast concrete kerb overall size 250 mm wide x 120 mm


F high complete with mortar bedding and jointing (Cansteen 4,177 m 188,500 787,364,500
Type 1 Drawing No. 40)

To Collection Rp. 4,033,815,050

6.Bill No. 4.5.1 /4


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

ROW 16

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


A 2,785 m2 42,500 118,345,500
specified to receive road sub base

Road sub base as specified

B 350 mm Thick gravel class B with CBR 85 % 2,785 m2 44,850 124,889,310

C 100 mm Thick gravel class A with CBR 90% 2,785 m2 62,500 174,037,500

Road surfacing as specified

D 50mm Thick wearing course 2,675 m2 77,650 207,713,750

Sand bed

E Sand bed 50mm thick, under kerb 110 m2 38,500 4,219,600

Precast concrete kerb

Precast concrete kerb overall size 250 mm wide x 320 mm


F high complete with mortar bedding and jointing as detail 2 1,096 m 188,500 206,596,000
drawing No.41

SIDEWALK AT ROW 16

Trim and compact fill to receive road sub base

Trim surface of fill and compact to CBR > / = 6% as


G 542 m2 42,500 23,018,000
specified to receive road sub base

Road surfacing as specified

H Paving 80mm thick 438 m2 195,000 85,410,000

Sand bed

I Sand bed 100mm thick 438 m2 38,500 16,863,000

Precast concrete kerb

Precast concrete kerb overall size 100 mm wide x 250 mm


J 1,036 m 188,500 195,286,000
high complete with mortar bedding and jointing

To Collection Rp. 1,156,378,660

6.Bill No. 4.5.1 /5


Q.17/871: SWANCITY Landed House, Cikupa - Lavon Project 53Ha Arcadis Indonesia pt.
Package 03.1: Phase 1 Main Contract Works Cluster R3 to R7 and Shophouses

BILL NO. 4.5 : CLUSTER R6


SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.1 : ROADWORKS

Code Description Quantity Unit Rate Rupiahs

Collection

Page No. 6.Bill No. 4.5.1/1 Rp. 20,763,450

Page No. 6.Bill No. 4.5.1/2 Rp. 179,091,400

Page No. 6.Bill No. 4.5.1/3 Rp. 166,808,150

Page No. 6.Bill No. 4.5.1/4 Rp. 4,033,815,050

Page No. 6.Bill No. 4.5.1/5 Rp. 1,156,378,660

SUB BILL NO. 4.5.1 : ROADWORKS To Summary Sub Bill 4.5 Rp. 5,556,856,710

6.Bill No. 4.5.1 /6


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.2 : ROAD DRAINAGE

Code Description Quantity Unit Rate Rupiahs

4.5.2.1 ROAD DRAINAGE AT AREA R6

Street Inlet

Precast concrete street inlet overall size 400 mm long x 200


mm wide x 250 mm deep complete with making hole 7"
A diameter and all necessary excavation, concrete reinforcing 696 no 448,300 312,016,800
steel, formwork and grill cover size 400 x 200 x 80mm as
shown on drawing No. 39

Earthworks

B Excavate commencing of grading level to trench for pipe 1,055 m3 133,800 141,159,000

C Ditto , for manhole 162 m3 133,800 21,675,600

D Ditto , for box culvert 521 m3 133,800 69,709,800

E Backfill with selected excavated material, for pipe 379 m3 55,600 21,072,400

F Ditto , for box culvert 32 m3 55,600 1,779,200

G Remove surplus excavated material to spoil heap 1,327 m3 55,600 73,781,200

Send bed

H 50 mm thick under pipe 2,114 m2 38,500 81,389,000

I 100mm thick under manhole 167 m2 38,500 6,429,500

Lean mix concrete bed

J 50 mm thick under manhole 167 m2 98,500 16,449,500

The following PVC drainage pipe between street inlet and


pipe drain

PVC pipe as specified

K 6" diameter PVC pipe type AW as specified 167 m 125,000 20,875,000

Pipe fittings

L 90 degree Elbow, 6" diameter 696 no 325,500 226,548,000

To Collection Rp. 992,885,000

6.Bill No. 4.5.2 /1


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.2 : ROAD DRAINAGE

Code Description Quantity Unit Rate Rupiahs

Reinforced concrete pipe (RCP) complete with making hole


to receive PVC pipe and jointing as specified

A RCP pipe, 400mm diameter 4,094 m 185,850 760,869,900

B Ditto, 500mm diameter 76 m 325,000 24,700,000

C Ditto, 800mm diameter 73 m 1,325,000 96,725,000

D Ditto, 900mm diameter 20 m 1,985,000 39,700,000

Precast concrete box culvert complete with neccessary sand


bedding and jointing as specified

E Precast box culvert, 400x400mm 15 m 412,650 6,189,750

F Ditto, 500x500mm 26 m 552,300 14,359,800

G Ditto, 600x600mm 25 m 658,350 16,458,750

H Ditto, 800x800mm 53 m 1,065,750 56,484,750

I Ditto, 900x900mm 29 m 1,391,250 40,346,250

J Ditto, 1000x1000mm 48 m 1,606,500 77,112,000

Vibrated reinforced concrete grade K350

K to manhole 269 m3 1,665,000 447,885,000

Bar reinforcement; deformed high tensile steel BJTD-40

L General reinforcing bars in manhole, 16 mm diameter 270 kg 15,800 4,266,000

M Ditto; 10mm diameter 40,841 kg 15,800 645,287,800

Formwork

N Sides of manhole 1,533 m2 156,500 239,914,500

To Collection Rp. 2,470,299,500

6.Bill No. 4.5.2 /2


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.2 : ROAD DRAINAGE

Code Description Quantity Unit Rate Rupiahs

4.5.2.2 Road Drainage Main Road at R6

Street Inlet

Precast concrete street inlet overall size 400 mm long x 200


mm wide x 250 mm deep complete with making hole 7"
A diameter and all necessary excavation, concrete reinforcing 85 no 448,300 38,105,500
steel, formwork and grill cover size 400 x 200 x 80mm as
shown on drawing No. 39

Earthworks commencing of grading level

B Excavate to trench for pipe 475 m3 133,800 63,555,000

C Ditto , for manhole 4 m3 133,800 535,200

D Backfill trench with selected excavated material 75 m3 55,600 4,170,000

E Remove surplus excavated material to spoil heap 404 m3 55,600 22,462,400

Sand bed

F 50 mm thick under pipe 486 m2 38,500 18,711,000

G 100mm thick under manhole 3 m2 38,500 115,500

Lean mix concrete bed

H 50 mm thick under manhole 3 m2 98,500 295,500

The following PVC drainage pipe between street inlet and


pipe drain

PVC pipe as specified

I 6" diameter PVC pipe type AW as specified 21 m 125,000 2,625,000

Pipe fittings

J 90 degree Elbow, 6" diameter 85 no 325,500 27,667,500

To Collection Rp. 178,242,600

6.Bill No. 4.5.2 /3


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.2 : ROAD DRAINAGE

Code Description Quantity Unit Rate Rupiahs

Vibrated reinforced concrete, grade K350

A to manhole 5 m3 1,665,000 8,325,000

Bar reinforcement; deformed high tensile steel BJTD-40

B General reinforcing bars in manhole, 16 mm diameter 3 kg 15,800 47,400

C Ditto; 10mm diameter 672 kg 15,800 10,617,600

Formwork

D Sides of manhole 27 m2 156,500 4,225,500

Reinforced concrete pipe (RCP) complete with making hole


to receive PVC pipe and jointing as specified

E RCP pipe, 600mm diameter 83 m 658,350 54,643,050

F Ditto, 800mm diameter 133 m 1,065,750 141,744,750

G Ditto, 900mm diameter 157 m 1,391,250 218,426,250

H Ditto, 1000mm diameter 78 m 1,606,500 125,307,000

I Ditto, 1100mm diameter 40 m 1,660,000 66,400,000

To Collection Rp. 629,736,550

6.Bill No. 4.5.2 /4


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUB BILL NO. 4.5.2 : ROAD DRAINAGE

Code Description Quantity Unit Rate Rupiahs

Collection

Page No.6.Bill No. 4.5.2 /1 Rp. 992,885,000

Page No.6.Bill No. 4.5.2 /2 Rp. 2,470,299,500

Page No.6.Bill No. 4.5.2 /3 Rp. 178,242,600

Page No.6.Bill No. 4.5.2 /4 Rp. 629,736,550

SUB BILL NO. 4.5.2 : ROAD DRAINAGE To Summary Sub Bill 4.5 Rp. 4,271,163,650

6.Bill No. 4.5.2 /5


BILL NO. 4.5 : CLUSTER R6
SUB BILL NO. 4.5 : ROAD AND DRAINAGE
SUMMARY

Code Description Unit Rupiahs

SUMMARY OF SUB BILL 4.5

SUB BILL NO. 4.5.1 : ROADWORKS Rp. 5,556,856,710

SUB BILL NO. 4.5.2 : ROAD DRAINAGE Rp. 4,271,163,650

SUB BILL NO. 4.5 : ROAD AND DRAINAGE To Summary Bill No 4 Rp. 9,828,020,360

6.Bill No. 4.5 Summary /1

You might also like