HUMP TAKE OFF

TAKE OFF LIST


1. PRELIMINARY WORKS
2. DEMOLUTION
3. FORMWOKS
4. REINFORCEMENT
5. CONCRETE WORKS
6. SURFACE DRESSING
7.PAINTING & MARKING

1. Preliminary works

Allow all Preliminary works including geotechnical works,


mobilization of plants and equipment and
people as workers. Demolution and rehabilitation
1.00 1 and all necessary hump activities.

5.43 2. Demolution
6.00
0.05 1.63
Remove 50mm thc asphalt and deposit them to the approved
area

5.43
6.00
0.25 8.15
Removaland disposal 250mm thc stone base materials

5.43
6.00
0.20 6.52

Removal and disposal of 200mm thc sub-base coarse materials

3. FORMWORKS

2 5.43 10.86 300mm high sawn timber formworks to edges of hump

[1/2
Project Name:XXX Drawing nbr:XXX date:19/10/2021

4. REINFORCEMENT

12 mm diameter high tensile yield steel 200mmspacing cutting


222.00 222.00 and bonding with tie wires

5.CONCRETE
in situ Reinforced concrete ,grade c25 in hump mechanicallly
9.43 vibrated
6.00
0.10 5.658

6.SURFACE DRESSING
5.43
6.00 32.58

14mm thc hot mix asphalt concrete caurse surface dressing

7.PAINTING AND MARKING


0.34 0.34
0.31 0.31
2 0.33 0.33
0.36 0.36
0.30 0.30
0.44 0.44
0.32 0.32
2.4000
Thelmoplastic white paint painted for marking a HUMP AHEAD
sign marking
&

Ditto for a white paint,painted on the top lines of the hump


0.09 0.09
0.35 0.35
0.60 0.60
0.53 0.53
0.27 0.27
0.01 0.01
1.85