1. Preliminary works
5.43 2. Demolution
6.00
0.05 1.63
Remove 50mm thc asphalt and deposit them to the approved
area
5.43
6.00
0.25 8.15
Removaland disposal 250mm thc stone base materials
5.43
6.00
0.20 6.52
3. FORMWORKS
[1/2
Project Name:XXX Drawing nbr:XXX date:19/10/2021
4. REINFORCEMENT
5.CONCRETE
in situ Reinforced concrete ,grade c25 in hump mechanicallly
9.43 vibrated
6.00
0.10 5.658
6.SURFACE DRESSING
5.43
6.00 32.58
[2/2