Professional Documents
Culture Documents
Basic
Operation of
Process
sequence list
1
6.1 Setup Display Items
[List Operation]-[Display Condition] 6
AP100G CAM Operation Guide I NCT
Set the items to display or set columns to be shown when scrolling the Basic
list. Operation of
Process
1. Click [List Operation] and [Display Condition]. sequence list
Operation
2. Set items in the [Condition to Display a List] dialog box then
click [OK].
2
6.2 Book Mark
6
[List Operation]
AP100G CAM Operation Guide I NCT
Basic
Set Bookmark to the sequence lint. This allows you to jump to specific line without Operation of
scrolling screen. Process
sequence list
6.2.1Setting bookmark
[List Operation]-[Bookmark Set/Release]
Set a bookmark to lines in the processing order list.
1. Select lines to set bookmark.
Operation
3
6.2.2 Cancel bookmark
[List Operation]-[Bookmark Set/Release]
6
Cancel bookmark.
AP100G CAM Operation Guide I NCT
4
6.3 Jump to Another line
[List Operation]
6
AP100G CAM Operation Guide I NCT
# To nest Reposition
# To next process group
# To OT
5
6.3.3To next Reposition
[List Operation]-[Jump]-[To Next Reposition]
Jump to the first hit of the next reposition in the sequence list, when there 6
AP100G CAM Operation Guide I NCT
6.3.5To OT
[List Operation]-[Jump]-[To OT Error]
Jump to next hit that is over travel. “OT” button in [Status] field is
activated when there is OT error. (OT: Tool path are assigned to the
outside of the process range).
When OT’s do not exist, this cannot be used.
Operation 1. Click [List Operation], [Jump], and [To OT Error].
6
6.3.6To Dead zone error
[List Operation]-[Jump]-[To Dead Zone Error]
6
Jump to next hit that is in dead zone area. “DZ” button in [Status] field is
AP100G CAM Operation Guide I NCT
activated when there is Dead zone error. (Dead Zone: Tool path are Basic
assigned in dead zone area around clamps). Operation of
Process
When DZ does not exist, this cannot be used. sequence list
Operation 1. Click [List Operation], [Jump], and [To Dead Zone Error].
7
6.3.9To punch smaller than thickness
[List Operation]-[Jump]-[Punch of Unreached Thickness]
6
AP100G CAM Operation Guide I NCT
Jump to next tool hit that is smaller than material thickness. “MP” button
Basic
in [Status] field is activated when there is tool hit that is smaller than Operation of
material thickness. Process
When a punch less than sheet thickness is not found, jump cannot be sequence list
executed.
1. Click [List Operation], [Jump], and [Punch of Unreached
Operation
Thickness].