Professional Documents
Culture Documents
Sequencing
3
3-1
AP100G CAM Operation Guide I NCT
3.1 Change Tool Group
[Process Order]-[Process Order Group Instruction] 3
AP100G CAM Operation Guide I NCT
Change tool group to setup sequencing. The following three groups are
Change
processing order groups. The Group that has a smaller number is
Sequencing
processed first. Usually, standard tools are applied to Group 2 and
downward forming tools to Group3. (Group 1 is for user.)
! Group 1 (Group-instructing color: Red)
! Group 2 (Group-instructing color: Blue)
3-2
3. Select tooling to change group. (For [Individual], you can select
multiple tooling by holing left mouse button, dragging around or
click one by one.)
● When [Confirm Continous Addition] on system tab of Condition Setup 3
condition is selected, any number of tooling can be selected by clicking each
AP100G CAM Operation Guide I NCT
Tips
path continuously. If [Confirm Continous Addition] is not selected, any Change
number of process paths can be selected by clicking each path continuously Sequencing
while holding the Shift key.
● While using this function, Bookmark can not be used.
● If [Select Method] is changed after selecting tooling, all selection will be
canceled.
● When the process order of a selected tool path is fixed, the fixed tool path is
changed at the same time.
Tips
3-3
3.2 Change Tool Order
[Process Order]-[Tooling Switch Instruction] 3
AP100G CAM Operation Guide I NCT
3-4
3. Change the order or processing method of tools if necessary. You
can use following buttons.
Manual change:
[Move]: 3
AP100G CAM Operation Guide I NCT
Move tool.
Select tool to change then click the other tool that you want to Change
hit before selected tool. Sequencing
[Replace]:
Switch tool order between selected tools.
Click two tools and the tool order are switched.
Auto-change:
[Auto Replace]:
Sort tools based on the current condition. To change the
condition, click [Tooling Replace] to display the [Auto Tool
Switch Condition] dialog box.
⇒ Refer [5.2 Setup Tool Sort Condition]-[Setting in the Tooling Replace
(⇒
dialog box] for detail)
Change direction to process:
[Processing Method]:
Changes a processing method.
Select a processing method (Punch from Top to Bottom or from
Bottom to Top) from the list and click tools to apply.
3-5
3.3 Change Sequencing
[Process Order]-[Process Order Manual Change]
! Package change
Operation
1. Click [Process Order], [Process Order Manual Change], and
[Continuous Instruction].
2. Click the first tooling to be changed on the screen.
● Selecting tapping and pre-punch may be difficult because they are on same
position. That case, use “Filter Tooling” to make selection easier.
Tips
● To change “Filter Tooling” setting while changing sequencing, click
[Replace].
Change
Sequencing
3-7
3.3.2 Package Change
[Process Order]-[Process Order Manual Change]-[Package change]
Move lines in the processing order list to change the processing order.
1. Click [Process Order], [Process Order Manual Change], and
3
Operation
AP100G CAM Operation Guide I NCT
[Package Change].
⇒ Refer [Changing Condition of Process Order])
(⇒
3-8
5. A confirmation message appears. Click [OK].
3
AP100G CAM Operation Guide I NCT
Change
Sequencing
6. To change other order, repeat steps 3 to 5.
7. Click [Close] to exit.
3-9
% Same range:
Move all lines of same tool guide size at a time.
% Same pattern:
Move all lines of same pattern (single hit, shear proof type
pattern) at a time. 3
AP100G CAM Operation Guide I NCT
3-10
3.3.3 Break Multiple Part Array Macro
[Process Order]-[Process Order Manual Change]-[Multiple Arrangement Macro Separation]
$ This function cannot be used when the setting of [NC Data Creation Change
Caution Method] is set to [Not Replace Tooling] for the NC creation condition Sequencing
(punching).
$ Only processing with “U1 - V1” displayed in the processing order list
can be separated. Since “U1V1” is a macro that has only one
processing, it cannot be separated.
$ The separation is invalidated when [NC Data Creation Method] in NC
creation condition is changed after separation.
1. Click [Process Order], [Process Order Manual Change], and
Operation
[Multiple Arrangement Macro Separation].
2. Select the tooling in the macro to be separated on the screen or
in the processing order list.
3-11
3. Select a tooling to be separated on the screen or in the processing
order list. (You can select multiple tooling.)
● When [Confirm Continous Addition] on system tab of Condition Setup
condition is selected, any number of tooling can be selected by clicking each
Tips
path continuously. If [Confirm Continous Addition] is not selected, any 3
AP100G CAM Operation Guide I NCT
3-12
3.3.4 Change Direction/Quadrant of Multiple Arrays
[Process Order]-[Process Order Manual Change]-
[Change of Multiple Arrangement Starting Pos., Direction] 3
AP100G CAM Operation Guide I NCT
Caution $ The changes are invalidated with operation after the change: changing
NC creation condition or changing process order group number.
3. Click the button of the starting position you want in the [Change
of Starting Position/Direction] dialog box. Select the direction
and quadrant.
● When the number of X part is one, [Starting Point] cannot be set to [Upper
right] and [Lower right]. When the number of Y part is one, [Upper left] and
Tips
[Upper right] cannot be set.
● When the number of X part is one or horizontal tooling is used for common
line cut,, the setting of [Direction Priority] cannot be set to [Y Direction].
When the number of Y part is one or Vertical tooling is used for common line
cut,, the setting of [Direction Priority] cannot be set to [X Direction]
3-13
3
AP100G CAM Operation Guide I NCT
Cancel all the changes done by using [Process Order] and [Process Order
Manual Change].
1. Click [Process Order], [Process Order Manual Change], and
[Release].
Operation
2. A confirmation message is displayed. Click [OK].
3-14