1.0 PURPOSE
The objective of this procedure is to ensure that processes during Construction and
Pre-commissioning work shall be controlled and carried out in accordance with the
Project requirements.
2.0 SCOPE
2.1 This procedure describes the system by which processes shall be controlled with
reference to project requirements.
2.2 Processes shall be controlled through the issuance of Procedures, Work Instructions
and Method Statements.
3.0 REFERENCES
3.1 The following documents are referenced:
3.1.1 ALM-IMS-PRC-01 Control of Documented Information
4.0 DEFINITIONS
4.1 This procedure uses definitions in the Quality Plan and ISO 9000:2000 Quality
Management Systems – Fundamentals and Vocabulary
5.0 PROCEDURE
5.1 The Project Management Team prepares and reviews all procedures to ensure that
these comply with the project requirements.
5.2 The Quality Management ensures that such procedures will result in the respective
work being in compliance to the project requirements.
5.3 The Environment, Health and Safety Supervisor ensure that implementation of the
procedures to be in compliance to the project safety requirements.
5.4 Relevant discipline managers / lead engineers are responsible for identifying, planning
and servicing of processes directly affecting the quality, and ensuring that these
processes are carried out under controlled conditions, which include the following
requirements:
5.4.1 Documented procedures / work instructions specifying the method of
fabrication and installation, in particular at those points in the process where
inadequate control could affect quality.
5.4.2 Correct workplace, equipment, processes and production or installation
procedures.
5.4.3 Relevant procedures, data sheets, checklists, test and acceptance forms,
safety instructions, etc, are produced to the project requirements and national,
ALMEER SAUDI TECHNICAL SERVICES CO.
they will be reviewed by the Project Management and the Quality Assurance
Department, and records of status maintained.
5.5.9 The vendor will be continuously monitored for adherence to the approved
procedure.
5.5.10 Records referencing the approval of such special processes will be maintained in
the Quality Assurance files, in accordance with the parameters laid down
procedures.
5.5.11 Inspection of all works will be carried out in accordance with respective
approved procedures. These inspections will be recorded by means of relevant
inspection records.
6.0 DOCUMENTATION
6.1 None.