You are on page 1of 2

PLA

NN
OR
TH

TR
UE

AS-BUILT

PT. KARTANEGARA ENERGI PERKASA


N.T.S TELUK PAMEDAS, EAST KALIMANTAN, 1
(IN- A1) INDONESIA
SENIPAH COMBINED CYCLE EXPANSION PROJECT T3135-CST-PIP-ISO-0001 (1 of 4) 1 of 4
30.10.18

30.10.18 ISOMETRIC FIRE FIGHTING SYSTEM


RCR Energy
Indonesia PT RCR ENERGY INDONESIA (NEW FIRE WATER MAIN RING)
30.10.18
PT TRUBA JAYA ENGINEERING
COMMENT & RESPONSE SHEET
Consortium Transmittal T3135-TJE-KEP-T-0039 Submitted date 15/Apr/2019
Owner Transmittal SCCX-BVI-EPC-T-1107 Received Date 06/May/2019

DOCUMENT TITLE REV. CONSORTIUM DOCUMENT NUMBER CONTRACTOR DOCUMENT NUMBER CATEGORY STATUS
Isometric Fire Fighting System (New Fire Water Main Ring) 0 - T3135-CST-PIP-ISO-0001 (1 of 4) IFR EN
IFI NE RR
IFR EN HO
IFC RC VO
RD SS
No OWNER'S COMMENT EPC CONTRACTOR'S RESPONSE

1 Hydrant have not been installed yet. Hydrant already installed

CRS Page 1 of 1 SCCX Senipah