Total Volume Concreate

= 1,06 m3

Concreate,

Mutu Beton K 300

m
,50
17

Tulangan Beugel,
Besi Diameter 6 mm - 200 mm,
Jumlah Material Besi Diamater 8 mm = 7 Batang

0,08 m 0,08 m
0,25 m
0,30 m

0,25 m

Tulangan Utama,
0,41 m
0,05 m

Besi Dimater 12 mm - 150 mm


Jumlah Material Besi Diamater 10 mm = 12 Batang
Perbaikan Drainage Beton,
WTP Pond Exsiting

Project:

NOTE TEAM APPROVAL REVISION Design building Architecture &Construction Owner : PT. KARTANEGARA ENERGI PERKASA
LEGENDA:
Tittle :
DEPARTEMENT SIGN DATE DATE BY WHAT REVISED

DESIGN BY:
Perbaikan RULLY
COTTAGE Konstruksi Engineering & Construction
COTTAGE
Perbaikan RULLY
Konstruksi Drainage DIVISI
Drainage, pada WTP Pond Beton, pada WTP Pond Exsiting
Existing ARSITEK ENGINEER SKALA:

DATA FILE CIVIL ENGINEER:

TANGGAL: 27
21 Desember
NOVEMBER 2023
2020
ORIGINAL DRAWING SIZE : A3