The document provides details on civil work for an outer unit foundation and IT server room hub office first floor (FF). It lists 6 line items for the server room work including lifting AC units, dismantling a window, installing false ceiling, removing vinyl, applying epoxy flooring, and debris removal. However, line item 5 regarding epoxy flooring for the HUB office area is noted to be excluded from consideration.
The document provides details on civil work for an outer unit foundation and IT server room hub office first floor (FF). It lists 6 line items for the server room work including lifting AC units, dismantling a window, installing false ceiling, removing vinyl, applying epoxy flooring, and debris removal. However, line item 5 regarding epoxy flooring for the HUB office area is noted to be excluded from consideration.
The document provides details on civil work for an outer unit foundation and IT server room hub office first floor (FF). It lists 6 line items for the server room work including lifting AC units, dismantling a window, installing false ceiling, removing vinyl, applying epoxy flooring, and debris removal. However, line item 5 regarding epoxy flooring for the HUB office area is noted to be excluded from consideration.
Note: Please don’t consider line item 5 in HUB office area work.
CIVIL WORK FOR OUTER UNIT FOUNDATION
Sr. No Description Qty Unit Rate Amount 1 Digging of grassy area as per required size 1 Job Construction CC land scape block masonry foundation for A/C outer 2 Unit L 5'x W 8" H 18" 75 Cft
3 Plaster with Mesh as per above size 160 Sqft
CIVIL WORK FOR IT Server Room HUB office FF
Sr. No Description Qty Unit Rate Amount Lifting and shifting of 2 Nos A/C Indoor and outdoor unit from hub 1 office first floor to write off cage ragging and crane work 1 Job