Note: Please don’t consider line item 5 in HUB office area work.

CIVIL WORK FOR OUTER UNIT FOUNDATION


Sr.
No Description Qty Unit Rate Amount
1 Digging of grassy area as per required size
1 Job
Construction CC land scape block masonry foundation for A/C outer
2 Unit L 5'x W 8" H 18" 75 Cft

3 Plaster with Mesh as per above size 160 Sqft

CIVIL WORK FOR IT Server Room HUB office FF


Sr.
No Description Qty Unit Rate Amount
Lifting and shifting of 2 Nos A/C Indoor and outdoor unit from hub
1
office first floor to write off cage ragging and crane work 1 Job

2 Dismantling & Reinstallation of Aluminum fix window size 4'x6' 1 Job

3 Supply & Installation of Dempa False Ceiling as per sample 2'x2' 10 Nos

4 Removing of existing vinyl 400 Sqft

5 Supply & applying of 3mm self-level epoxy floor 400 Sqft

6 Shifting of all debris at scrape yard 1 Job