PROBLEM STATEMENT
3
Company Use
CBR = 5%
FSI = 75
PI = 36
6
Company Use
7
Company Use
Embankment SUBGRADE
8
Company Use
CLOSE TO OUR CUSTOMERS
SOIL STABILIZATION
IN-SITU SOLUTION
9
Company Use
In-Situ Soil
Stabilization / Injection of water
Improvement (to maintain OMC)
Pre-spread
Binder
Stabilized
Subgrade Mix
Existing / Locally
10
Available Soil
Company Use
In-Situ Soil Stabilization – Delhi Mumbai Expressway
(Modification with 2% Lime as binder)
Locally Automated
Available Soil Binder
CBR = 5 % Spreading
FSI = 75 (2% Lime)
PI = 36
Unfit for
Construction
In-situ
Pulverization
Modified Soil
using
CBR ~ 12 % Automated
FSI = 30 Soil Stabilizer
PI = 20.2
Fit for
Construction 11
Company Use
In-Situ Soil Stabilization – Bundelkhand Expressway
(Modification with 2% Lime as binder)
500mm depth
Locally
in single pass
available Soil
Homogenous
stabilized mix 12
Company Use
15
Company Use
+ =
Existing/Borrow CBR=12%(Effective)
Area Soil Cement CBR =39%
CBR=5% (1.5-%)
FSI=30
+ = PI=20.2
30 Stabilisation In Situ
18
Company Use
19
Company Use
- PKG 11
- PKG 12
- PKG 13
- PKG 14
21
Company Use
CLOSE TO OUR CUSTOMERS
DELHI-MUMBAI EXPRESSWAY
PKG-12
IN-SITU SOIL STABILIZATION
22
Company Use
Soil Stabilization -
Cost-effective upgrading the ground by soil stabilization
BEFORE
AFTER
23
Company Use
Site Execution
CBR 5%
CBR 5%
24
Company Use
Even Spreading Of Lime by using mechanized truck
mounted automatic controlled Spreader
25
Company Use
Lime Spreading
26
Company Use
Stabilization in-situ 250mm in single pass with
modern self-propelled stabilizer
27
Company Use
Stabilization in-situ 250mm in single pass with
modern self-propelled stabilizer
28
Company Use
Stabilization in-situ 250mm in single pass with
modern self-propelled stabilizer
29
Company Use
Soil Stabilization
31
Company Use
32
Company Use
Stabilized Soil With Lime as a binder with CBR -
12% and PI- 20.2
MODIFIED SOIL=High
Quality Mix 33
Company Use
Initial Compaction
34
Company Use
Grading
35
Company Use
Final Compaction
36
Company Use
37
Company Use
38
Company Use
CLOSE TO OUR CUSTOMERS
DELHI-MUMBAI EXPRESSWAY
PKG-13
IN-SITU SOIL STABILIZATION
39
Company Use
Soil Stabilization
40
Company Use
Site Execution
41
Company Use
Even Spreading Of Lime by using mechanized
truck mounted automatic controlled Spreader
42
Company Use
Lime Spreading
@9.5 kg/sqm
43
Company Use
44
Company Use
45
Company Use
46
Company Use
MODIFIED SOIL=High
Quality Mix 47
Company Use
Initial Compaction
48
Company Use
Grading
49
Company Use
Final Compaction
50
Company Use
51
Company Use
Compaction Pit
52
Company Use
CLOSE TO OUR CUSTOMERS
DELHI-MUMBAI EXPRESSWAY
PKG-11
IN-SITU SOIL STABILIZATION
53
Company Use
Even Spreading Of Cement by using mechanized
truck mounted automatic controlled Spreader
54
Company Use
55
Company Use
56
Company Use
57
Company Use
58
Company Use
59
Company Use
CLOSE TO OUR CUSTOMERS
BENEFITS
IN-SITU SOIL STABILIZATION
60
Company Use
Stabilization Benefits
Design & Construct Cost Efficiency: Increase the strength of the lower
pavement layers and save on the thickness of the more expensive upper
pavement layers (HMA).
Reduce Earthworks: Stabilizing the subgrade, means that layer does not have
to be excavated for placement of costly quarry products.
62