A mock fire drill was conducted on September 20, 2023 at 11:25 AM at PROP:P.RAMAMURTHISF NO.90/A2,KITTAMPALAYAMANNUR ROADSH165,COIMBATORE to provide fire extinguisher training to staff. All emergency response teams including fire, medical, security and E&M responded within expected times. A headcount found that all 8 persons present participated in the drill successfully. The mock drill concluded at 12:02 PM after 30 minutes with the observation that all staff received fire extinguisher training.
A mock fire drill was conducted on September 20, 2023 at 11:25 AM at PROP:P.RAMAMURTHISF NO.90/A2,KITTAMPALAYAMANNUR ROADSH165,COIMBATORE to provide fire extinguisher training to staff. All emergency response teams including fire, medical, security and E&M responded within expected times. A headcount found that all 8 persons present participated in the drill successfully. The mock drill concluded at 12:02 PM after 30 minutes with the observation that all staff received fire extinguisher training.
A mock fire drill was conducted on September 20, 2023 at 11:25 AM at PROP:P.RAMAMURTHISF NO.90/A2,KITTAMPALAYAMANNUR ROADSH165,COIMBATORE to provide fire extinguisher training to staff. All emergency response teams including fire, medical, security and E&M responded within expected times. A headcount found that all 8 persons present participated in the drill successfully. The mock drill concluded at 12:02 PM after 30 minutes with the observation that all staff received fire extinguisher training.
2 Location PROP:P.RAMAMURTHISF NO.90/A2,KITTAMPALAYAMANNUR ROADSH165,COIMBATORE 3 Details of Emergency Scenario null(FIRE EXSTINGUISHER TRAINNING) 4 Details of initiation / activation of FIRE EXSTINGUISHER TRAINNING emergency 5 Description of the mock drill (the FIRE EXSTINGUISHER TRAINNING CA AND OTHER STAFF narrative of the situation, all actions) inclduing response of emergency team and mitigation actions 6 Communication and Response of Emergency teams Events Expected Response Actual Response Time Remarks if any Time 6(a) Siren activation after initiation 05 05 6(b) Reporting of CIC 06 06 6(c) Reporting of SIC 07 07 6(d) Fire Team 05 05 6(e) Medical Team 07 07 6(f) Security Team 07 07 6(g) Mutual Aid 07 07 6(h) E&M 07 07 6(i) Others 07 07 7 Head Count 7(a) Total persons present in the installation 8 before the drill 7(b) Total persons available at Asembly 8 point(s) 7(c) Difference of Head Count after Drill 0 7(d) Action taken to search the shortfall of headcounts, if any 8 Time of "All Clear" 20/09/2023 12:02 9 Duration of Mock Drill (in minutes) 30 10 Observations (including highlight the poistives of the drill) ALL CA HAS BEEN TRAINED 11 Recommendations NA 12 Emergency Exercise Observers Name of the Observer Area of Observation