Professional Documents
Culture Documents
DTD 18.05.2022
Team:
1. Dhananjay Kumar (Manager, O&M)
2. Anil Sharma (Manager, O&M)
3. Vishal Kumar Mishra (SE, O&M)
Mechanical Seal:
Bearing:
PROBLEM STATEMENT:
Overhauling of old back pull assembly was carried out in Mechanical Workshop
on 18.05.2022.
ACTIVITIES, OBSERVATIONS AND ACTION TAKEN:
1. First, impeller lock nut was loosened, lock nut gasket compressed found.
Teflon gasket was replaced with new one.
2. Seal gland plate was locked with the help of sliding washer.
3. After that, shaft sleeve grub screw was loosened with the help of Allen
key.
4. Impeller back plate bolts were loosened, and back plate was removed.
5. Further, mechanical seal was disassembled. After disassembly of
mechanical seal, secondary seal was observed to be covered with foreign
particles and dirt.
11.Now bearing housing assembly was completed and float reading was
taken.
Axial float- 0.01 mm
Radial float- 0.09 mm
13. All soft packings of mechanical seal were replaced with new one and
both faces of primary seal were replaced with lapped one.
SPARES CONSUMED:
S.
No Mat Code Description Qty
30 5210701173 RING, MATING, P/N:300.02, D00028AA 1B 1
40 5210722143 RING, SEAL ASSY, P/N:100.02, D00028AA1B 1
50 5130473103 BRG, CYLINDRICAL, ROLLER, SKF-NU 310 ECP 1
60 5132753103 BRG, CYLINDRICAL, ROLLER, SKF-NU 310 ECJ C3 1
70 5118353103 BRG, BALL, SINGLE ROW, SKF-7310 BECBP 2
80 5210571863 O-RING, P/N:111.22,111.32,111.00 1