RAS COLUMN
For Large Diameter, Homogenous Column Improvement

Large Diameter and Homogenous Improvement with RAS Column


RAS Column is an advanced deep soil mixing the "turning together" problem, often
method based on mechanical soil mixing encountered by conventional mechanical soil
technology to produce soil-cement column of mixing methods, that cohesive soil co-rotates
1.4 to 2.5 m diameter. with the mixing head, causing insufficient mixing
and unexpected deficiency of columns.
The mixing head is equipped with the counter
rotation mechanism where the bottom auger RAS Column efficiently improves foundation soil
and mixing blades rotate clockwise while the of building and civil engineering structure to
upper mixing blades rotate counter-clockwise. increase bearing capacity and prevent
This unique mechanism efficiently breaks and liquefaction.
mixes in-situ soil with cement-based reagents,
producing more homogenous and higher quality
soil-cement columns. It completely eliminates

Advantages Application
1 Applicable to a wide range of soils, providing  
excellent quality improvement. 

2 Large diameter column improvement of dia.


1.4m to 2.5m
3 Uniform mixing and homogenous product
   
quality due to counter-rotation mechanism
Improvement of Foundation Soil
4 Computer-based control and monitoring system ◊ for buildings
ensures quality improvement ◊ for tanks
◊ for retaining walls
5 Improvement efficiency in product strength and ◊ for culverts
production speed saves on cost. 

6 Flexibly adaptable to site-specific improvement
100 100
requirements
90 90

80 80 7 Low noise and low vibration system


70 70

60 60

50 50

40 40 Improved Column  
30 30

20 20

10 10
   
100 100

90 90    

80 80
◊ To prevent Liquefaction
70 70
◊ To prevent Settlement
60 60 ◊ To prevent Slip failure of embankment
50 50 ◊ To prevent Uplifting
40 40 ◊ To construct subsurface strut
30 30

20 20

10 10
RAITO KOGYO CO., LTD.
RAS COLUMN
Construction Process

n
il
s
g

oil
o
nt

Rig positioning Penetration Churning Completion


Position the rig at a After passing dry excavation zone, Move the head up and down to mix throughly Withdraw the head and
marked point start injecting slurry. Drill down and mix so that each part of the soil receives the pre- complete a soil cement
with in-situ soil to a specified depth. defined number of cuts by mixing blades. column.

Control System
Slurry plant
Display unit

Control unit

RAS
Column
RAS column machine Construction Data
Processing
Data
Collection
◊ Depth and Speed
◊ Rotation for inner rod
◊ Rotation for outer rod
◊ Electric Current

RAITO KOGYO CO., LTD.


          