Professional Documents
Culture Documents
North Elevation
1. All works to be carried out in accordance with Local
Authority regulations.
2. All figured dimensions to be taken in preference
to scaled dimensions.
3. All walls below 200mm to be reinforced with hoop
iron at every alternative course.
4. Provide damp proof course (D.P.C) under all walls.
5. P.V indicates permanent ventilations.
6. All drainage passing under building and drive
14 area to be of pvc pipe and encased in 150mm
1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 thick concrete surround.
S-01
7. All inspection chambers in drive area to have
heavy duty covers.
8. Check all dimensions on site.
9. All sanitary work to be in accordance with MOH rules
and regulations and NCC requirements.
A A
WAITING 10. 500g polythene sheeting and anti-termite treatment
AREA to be provided under ground floor concrete slab.
SOCIAL RECREATION
office ROOM 11. All reinforced concrete works to Structural Eng. detail.
DOWN
SNACK BAR
18. SS Denotes stainless steel
12
13
14
15
16
17
18
19
11
10
1
S-02 19R x 0.158
UP
18G x 0.284
PATIO
D D
West Elevation
East Elevation
E E
F F
5 6 7 8 9 10 11 12 13 14 15
G G
H H 16 17
I I
J J
NAME:
K K
S-01
1 2 3 4
REGISTRATION
UNIT
PROJECT TITTLE
DRAWING TITTLE
South Elevation WORKING
DRAWINGS
SCALE
DATES
FRI,9TH DEC.2022
GSPublisherVersion 0.18.100.100