1. All dimensions to be counter checked on site.
2. Foundation depth to be determined on site with
Engineer's approval.
3. Pv denotes permanent ventilation.
brick work 4. Roof pitch angle to be 30 degrees.
finish on 5. Provide hoop iron to walls less than 200 mm at
pv pv pv pv pv parapet wall alternate courses.
pv pv
6. All dimensions are in mm unless otherwise stated.
7. Drainage pipes to be 150 mm diameter pvc pipes.
8. Dpc to be 3ply bituminous felt laid under all walls.
9. All windows are standard metal casement.
10. All pipes and services to be minimum 450 mm
below
pv pv pv pv pv pv ground level.
11. Water meter to be 300 mm above ground level
12. All construction works to comply with latest std
code
of practice
13. Provide one row of 600 x 600x 50 precast concrete
pv pv pv pv pv pv pv paving slabs around the building unless otherwise
stated.
ledgend
pv pv pv pv pv pv sh denotes shower
pv
wc denotes water closet
pv denotes permanent ventilation
whb denotes wash habd basin
gt denotes gulley trap
pv ft denotes floor trap
pv pv pv pv
pv wrb denotes wardrobe
Fire notes
1.10,000 water tank to be erected for fire fighting
pv 2. install 9 kg dry powder fire extinguisher for
pv pv pv pv pv pv each house
s- casement 3.provide exit door from the back door
window 4. provide exits from the balcony if its a storey
building
pv pv pv pv pv pv pv
pv pv pv pv
window schedule
Width height
GL GL W1 =1500 X 1200
GL GL
W2 = 900 X 1200
pv
lift core door schedule
width height
pv pv pv
pv pv Drawn by : SIMIYU
pv
checked by :OBED
pv pv
pv PROJECT : Proposed residential
development on LR.NO.36/111/1027
18TH SREET ,EASLEIGH SEC 3
NAIROBI COUNTY
pv pv pv
TITLE : ELEVATIONS
GL GL
scale : 1:100
GL GL Date :MAY 2023
ELEVATION 02 ELEVATION 01