You are on page 1of 15

R & Y ENGINEERING AND CONSTRUCTION SDN BHD (291027 - V)

NO. 14, JALAN BALAKONG JAYA 4, TAMAN INDUSTRI BALAKONG JAYA, 43300 BALAKONG,
SELANGOR, M'SIA.
TEL : +6016 - 211 4762 FAX : +6016 - 329 0508

WORK METHOD STATEMENT

ABOVEGROUND PIPE INSTALLATION

CONTRACTOR APPROVAL
REV. NO. PREPARED DATE CHECKED DATE APPROVED STATUS DATE

M&E ENGINEER APPROVAL


REV. NO. REVIEWED DATE APPROVED DATE STATUS DATE

DOCUMENT NO. :
R&Y/BJM/LPG/2023/006
R&Y ENGINEERING AND CONSTRUCTION SDN. BHD.
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

TABLE OF CONTENTS

ITEM TITLE PAGE


NO.

- Table Of Contents 2
Method Statement Amendment
- 3
Record
1.0 Introduction 4

2.0 Scope Of Work 4

3.0 References 4

4.0 Purpose 4

5.0 Responsibility 5

6.0 Resources 5-6

7.0 Handling And Storage 6

8.0 Work Methodology 6~9

9.0 Inspection And Testing 10

10.0 Safety And Environment 11

11.0 QA/QC Aspects 11

12.0 List Of Attachment 12-15

2
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

METHOD STATEMENT AMENDMENT RECORD

PAGES REV. REVISION DETAILS REV. DATE

Any attachment? No ( ) Yes ( √ ) Attachment as stated

3
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

1.0 INTRODUCTION

1.1 To outline work method for the complete installation of Carbon Steel Sch
40 pipes and accessories.

1.2 Demonstrate the total quality commitment in implementing, managing and


executing of the works.

1.2 To define preparation and installation work instruction procedure for


Carbon Steel Sch 40 pipes and accessories installation to be follows by
site trade men and workers.

2.0 SCOPE OF WORK

2.1 The work shall be applied to complete the installation of the Carbon Steel
Sch 40 pipes and accessories installation with reference to the Energy
Commission requirement and regulation.

2.2 Demonstrate the total quality commitment in implementing, managing and


executing of the works.

2.3 Ensure that the welding works of the pipe are executed in according with
the contractual requirement, applicable engineering codes and standard,
statutory laws, regulation and the approved shop drawings.

3.0 REFERENCES
i. QA/QC preliminary submission of sample / material

ii. Inspection Request (IR)

4.0 PURPOSE

To ensure that the Carbon Steel Sch 40 pipes and fittings installation is comply to
project specifications and standard.

4
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

5.0 RESPONSIBILITY

All the responsibilities are under R&Y Engineering & Construction Sdn. Bhd.
(Contractor) person in charge
i) Project Manager
Responsible to lead the planning of Piping installation work and
value engineering the best possible Pipe routine.
ii) Project Engineer
Responsible to lead the operation at site and controlling the site
progress.
iii) QA /QC Engineer
To document up the form and procedure
iv) Site Supervisor
To carry out the work and monitor the worker on site

6.0 RESOURCES

6.1 Material for Carbon Steel Sch 40 Pipe Installation

ITEM DESCRIPTION MANUFACTURER Remarks


6.1.1 Carbon Steel Sch 40 pipes hebei Subject to
approval
6.1.2 Carbon Steel Sch 40 fittings Pantech Subject to
approval
6.1.3 Ball Valves Effebi Subject to
approval

6.2 Equipments and Tools

ITEM DESCRIPTION EQUIPMENTS & TOOLS


6.2.1 Welding Welding Machine , Genset for
welding works power supply
6.2.2 Cutting Cut-Off Machine
6.2.3 Threading Threading Machine
6.2.4 Grinding Grinder
6.2.5 Drilling Hand Drill
6.2.6 Measurement Measurement Tape
6.2.7 Painting Brush & Roller

5
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

6.3 Safety Tools

ITEM DESCRIPTION
6.3.1 Safety Shoes
6.3.2 Safety Vest
6.3.3 Safety Harness
6.3.4 Safety Helmet / Welding Mask
6.3.5 Glove
6.3.6 Fire Extinguisher
6.3.7 Basic First Aid Kit

7.0 HANDLING AND STORAGE

7.1 When materials arrived to site. It will be stored in a clean and dry area for
daily usage. Please view the location of storage at the list of attachment.
The temporarily store will be erected at the location given. Propose location
for storage material at level P5.

7.2 Alternatively, the bulk of materials shall stored at a designated place nearby
to the project site. This is to ascertain that the materials to be easily
available for delivery to site.

8.0 WORK METHODOLOGY

8.1 Pipeworks

8.1.1 Mark the pipeline location in the building according to the approved
shop drawings.

8.1.2 Survey the pipeline level where possible to avoid or minimize


obstructing other M&E services.

8.1.3 When pipeline passes through the building wall, a PVC pipe sleeve
shall be provided. The pipe sleeve provided shall always 1 " NPS
bigger than the pipeline size and shall be of minimum equal length
to the wall thickness. Example for 4” gas pipe to use 6” size for
pipe sleeve. Gap between sleeve and pipe must be filled with fire
proof material.

6
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

8.1.4 For concealed piping inside wall or slab, the pipe shall be wrapped
tape with 50 % overlapping.

8.1.5 For exposed piping, the pipe shall be painted. Only approved paint
shall be used. Pipe inside riser shaft also to be painted.

8.1.6 All pipes shall be cut to length requirement and shall prepare for
welding.

8.1.7 In a situation where pipeline route is obstructed by other M & E


services, the client’s representative shall be informed to resolve the
issue.

8.1.8 Pipe hanger shall be installed at the right position, location,


orientation, and level. Spacing of the pipe hanger shall be as per
specifications.

8.2 Pipe Painting Procedure

8.2.1 Purpose
8.2.1.1The painting procedure underlines the method statement for
painting of steel pipes that is conducted either at the workshop or
dedicated work area at the site.

8.2.2 Preparation works before painting

8.2.2.1 Arrange pipes to be stored in a covered area.

8.2.2.2 Material required for painting shall be properly stacked on


wooden or steel support and should not be laid directly on the
ground.

8.2.2.3 Surface to be painted must be clean & dry. Clean the pipe
surface by using pressurized water or wipe with wet cotton rag.
Grease, oil rust, scale and dirt must be removed and the pipe
must be dry be paint coatings are applied.

7
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

8.2.3 Application of paint

8.2.3.1 Paint shall be stirred thoroughly before use.


8.2.3.2 Apply one coat of red-lead oxide primer by using a paint brush
on the pipe external surface as soon as possible and allowed to
dry.

8.2.3.3 Apply one coat of high gloss paint as finishing coat, yellow in
color, by using a paint brush and allowed to dry.

8.2.3.4 Painted pipe shall be allowed to use only after the paint has
been thoroughly dried.

8.2.3.5 The painted pipes are to be stored on a covered area. If


necessary these pipes are to be covered with canvas.

8.2.4 Labeling

8.2.4.1 After painting has been completed, identify pipeworks with clear
labels as per Client’s Specifications. Labeling should be spray
painted and not sticker.

8.2.4.2 Carry out labeling work with arrows to indicate flow directions.

8.3 Pressure testing

8.3.1 Prior to pressure test, completed pipeline shall be cleaned all


kind of dirt or weld slag.

8.3.2 For partial testing, compressed air will be used for pressure test.
Once all pipe connected, Nitrogen will be used for pressure test.

8.3.3 All outlets shall be plugged off except the pressure inlet point of
pipeline.

8.3.3.1 Attach one pressure gauge to the pipeline. Pressure


gauge use shall be calibrated.

8
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

8.3.3.2 Pressurized each completed pipeline using compress air


at 50 psig for 1 hours.

8.3.3.3 Hold the test pressure for 1 hour. If pressure remains, the
line is deemed as gas tight.

8.3.3.4 If pressure drops, check testing apparatus connections


and shut-off valves for leaks. If this is still evident, apply
soapy solution to detect any leaks. All leaks must be
rectified and the test repeated.

8.3.3.5 On successful completion of the leak test, purge the


compress air out of the pipe system.

8.3.3.6 Purging point shall be carefully selected in order that


residual air and gas is completely clear from the pipeline.

8.3.3.7 Purging point shall be whenever possible located


outdoor. All kind of ignition sources, flammable items
shall be kept away from surrounding area.

8.3.3.8 The pressure test shall be approved by Resident


Engineer at site.

8.4 Cleaning

8.4.1 Clean up the working area completely after works done.

9
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

9.0 INSPECTION AND TESTING

9.1 All services shall be tested/inspected for:-

I. Submission Checklist
II. Carbon Steel Sch 40 pipe installation checklist

9.2 During work progress and final work done shall carried out inspection and
testing to ensure conformance of installation work.

9.3 The project work shall follow the work methodology. The site
representative will carried out the procedures, Inspection Request (IR) will
be forwarded before an inspection to be carried out by consultant’s
representative. The inspection request (IR) shall be enclosed with the
checklist, drawing and submission checklist.

10
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

10.0 SAFETY AND ENVIRONMENT

10.1 All work shall be carried out in accordance to the safety standard required
by the relevant authorities.

10.2 P.P.E shall be worn at all time to avoid any unwanted incidence.

10.3 Proper attire, safety shoes and helmet shall be provided.

10.4 Any work above ground 1.5m, worker must wear safety harness. Working
platform will be used. Scaffolding will be erected for such purposes.

10.5 Scaffolding shall be tagged and inspected by competent person.

10.6 All workers shall adhere to safety manual at all the time.

10.7 When work is completed, housekeeping will be required to keep the work
area clean and tidy. Thus to ensure the place is safe.

11.0 QA/QC ASPECTS

11.1 General

The purpose of the quality control is to provide a proper guideline for the
Carbon Steel Sch 40 pipe installation such that the following targets will be
attained:-

• To achieve consistently high quality standards of workmanship in


all aspects of the work.

• To provide a safe working environment.

• To follow work methodology to ensure the quality of construction.

11
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

12.0 LIST OF ATTACHMENT

ATTACHMENT DESCRIPTION REMARKS


1 List of Materials, Equipments & Tools for
Carbon Steel Sch 40 Pipe Installation
Works
2 Work Sequence of Carbon Steel Sch 40
Pipe Installation

ATTACHMENT 1

LIST OF MATERIALS, EQUIPMENTS & TOOLS FOR CARBON STEEL


SCH 40 PIPE INSTALLATION WORKS
A MATERIALS
1 Carbon Steel Sch 40 Pipe
2 Carbon Steel Sch 40 Fittings
3 Ball Valves
B EQUIPMENT AND TOOLS
1 Welding machine
2 Cut-Off Machine
3 Threading Machine
4 Grinder
5 Hand Drill
6 Measurement Tape
7 Brush and Roller
C SAFETY TOOLS
1 Safety Shoes
2 Safety Vest
3 Safety Harness
4 Safety Helmet / Welding Mask
5 Glove
6 Fire Extinguisher
7 Basic First Aid Kit

12
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

ATTACHMENT 2

WORK SEQUENCE OF CARBON STEEL SCH 40 PIPE INSTALLATION

Undercoat Painting

Install hangers and brackets

Pipes Fabricating Work

Hang and Install the pipes

Welding for pipes joint

Pressure Testing

Finish Coat Painting


&
Labeling

13
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.

Appendix A

Inspection Form

14
WORK METHOD STATEMENT
PROJECT: EXTENSION OF LPG PIPING SYSTEM AT MEETSUN , PAVILION BUKIT
JALIL MALL
Work Method Statement For Aboveground Carbon Steel Pipe For Liquefied Petroleum
Gas Reticulation System.