PETROL & PETROCHEMICAL COMPANY

FOR INDUSTRIAL SUPPORT SERVICES


Laboratory: Jubail, KSA 35615
Ho:Po Box: 38910, Al-Rakah Al Janubiyah, Al-Khobar 31942, KSA.
E-Mail: civil@petrochem-ksa.com petrochem@petrochem-ksa.com

COMPRESSIVE STRENGTH OF GROUT TEST REPORT

Client Name: Ibrahim M. Al Aboud Project Name: Al Othaim Mega Mall


Development Co.
Project Location: Jubail Industrial City
Client Address: Sulamaniya Riyad
Job Number:
Sample No. : CN-2160-1
Lab Report No.: JC2-00016
Sampling Method: -
PO Number:
Sampled By: SCHEDULER
Date of Sampling : 09-January-2024
Received By: P496
Date of Received: 09-January-2024
Client RFI: 1219
Date of Test Start: 09-January-2024

Date of Test Finish: 09-January-2024

Date of Report: 09-January-2024

Air Content (%): Type-B 0.0

Equipment Details

Request Test Area (mm2) Mass in Air (kg) Density (kg/m3) Max Load (kN) Compressive Type of Others
Sample ID Age (Days) Strength (MPa) Fracture

CN-2160-1-LAB_CURE 7 2500.0 0.340 1550 101.2 40.5 S 50

CN-2160-2-LAB_CURE 7 0.350 1526 182.7 10.3 300

CN-2160-3-LAB_CURE 7 0.350 1526 113.5 45.4 50

CN-2160-4-LAB_CURE 28 0.350 1526 143.2 57.3 50

Remarks : -

Statement of Conformity : Pass


Fracture Types:

Sadav Akhtar (CTTA#1631) Mian Zahid Maqbool

Tested By Reviewer

Terms & Conditions: 5- The Sample will be dispose by us for 90 days from testing date.
1- Information Provided by Customer 6- The request of retest or Extra test shall be intimated within 15 days from test date
2- Any correction in the report without authorization invalidates the report 7- Whenever test result provided by External Provider shall be indentified
3- The report shall not be reproduced except in full without prior written permission of PETROCHEM LAB. 8- Any Divation from test method shall be informed to the customer
4- The detailed documents in sample discription are asprovide by party in their PO/Invoice/Test request or Letter

Page 1 of 1