2 General Information
1
3 Design Parameters
Pipeline length [m]: 12286m
Outer diameter [inch & mm]:
Inner diameter [mm]:
Wall thickness [mm]: 5.6mm
Smallest ID known [mm]: Cause:
Minimum bend radius [xD]: 3D Angle [°]:
Min. ID in minimum bend [mm]:
S-bends: yes no Min. distance between bends [mm]:
Mitre bends yes no
Start End Outer Inner Wall Weld Steel Internal Design Design
Section distance distance diameter diameter thickness type* grade coating MAOP** pressure factor***
[m] [m [Inch] [mm] [mm] [mm] [bar] [bar]
Casings? yes no
Cathodic Protection? yes no
Type of external coating: 3LPE
2
4 Operating Parameters for Normal Operation for Inspection Survey
Product: Methane Methane
Hydrostatic pressure [bar]:
Pump pressure [bar]: - -
Maximum pressure [bar]: 62 62
Pressure drop in line [bar]: 1 1
3
Pump flow [m /h]:
Flow rate [m/s]:
Flow rate controllable: No yes no
Temperature range [°C]: at launch site: 25 at launch site: 25
at receive site: 25 at receive site: 25
3
5 Launcher/Receiver Description Launcher Receiver
(please refer to sketch below)
A B
G F
C
D
H I
6 Installations
Distance Distance Main Distance
to to Circ. line Offtake valve –
Installation launcher* receiver* pos. OD ID ID** t*** main line**
[m] [m] [°] [mm] [mm] [mm] [mm] [m]
* either distance is sufficient ** information required for batch runs only *** t = wall thickness
4
7 Pipeline History
Year of construction: 1997
Previous inspections: Geometry Inspection: year(s):
MFL inspection: year(s): 2014
TFI crack detection inspection: year(s):
Ultrasound CD inspection: year(s):
Ultrasound WM inspection: year(s):
Others(pls. specify): year(s):
8 Contacts
Name
GES Sales Manager
GES Project Manager
Client's Representative LEE JIA LIANG 017-5652609
Agent's Representative