1 Health, Safety, Environment

Hazardous and toxic substances radioactivity


in the run medium: Hg, quantity: ppm
H2S, quantity: ppm
others: Methane
Last measurement: Date: Quantity: ppm
Measures: protective clothing
respiratory equipment - Need Face Mask with cartridge
decontamination
Comment: -

2 General Information

Client's project: IN LINE INSPECTION FOR NPS 8 KLIA LATERAL


Contractor: EUREKA EFFECTIF SDN BHD Client: PETRONAS
GAS BERHAD
Country: MALAYSIA
Client's pipeline system N/A
name:
Client's pipeline KLIA LATERAL
name:
GES pipeline name: onshore offshore, water depth [m]:
Pipeline accessibility: Good poor (4WD)
High voltage lines in vicinity: No yes, distance to pipeline [m]:
Pipeline cover: type: soil depth: 1.5 m
Requested services:
Cleaning MFL inspection
Geometry inspection TFI inspection
Geometry inspection with Ultrasonic WM inspection
pipeline position determination

Combined magnetic TFI MFL inspection Combined ultrasonic CD WM inspection

Combined CD WM MFL inspection

Prepared by: ___________________________________ Date: __________________


Pipeline: _____________________________________ Project No.:_____________

1
3 Design Parameters
Pipeline length [m]: 12286m
Outer diameter [inch & mm]:
Inner diameter [mm]:
Wall thickness [mm]: 5.6mm
Smallest ID known [mm]: Cause:
Minimum bend radius [xD]: 3D Angle [°]:
Min. ID in minimum bend [mm]:
S-bends: yes no Min. distance between bends [mm]:
Mitre bends yes no
Start End Outer Inner Wall Weld Steel Internal Design Design
Section distance distance diameter diameter thickness type* grade coating MAOP** pressure factor***
[m] [m [Inch] [mm] [mm] [mm] [bar] [bar]

0 12286 5.6 seamle X52 N/A 68.95 68.95 0.4


ss

* Weld type: long seam, SAW, ERW, seamless, spiral


** Max. allowable operating pressure (MAOP): ≤ design pressure, usually determined by the pipeline operator.
*** Unless specified, 0.72 is taken as default.
Tees with diameter 1:1 no
yes: barred unbarred (pls. specify):
location: 0 km, orientation: 90 Deg
location: 12.286 km, orientation: 90 Deg
location: km, orientation: Deg

Tee protrudes into pipeline: no yes: mm


All valves full bore? yes no (pls. specify):
location: 0 km, actual bore: Mm
location: 6.251 km, actual bore:
m
location: 12.286 km, actual bore: Mm
Check valves? no yes, type: (pls. enclose drawing!)

Casings? yes no
Cathodic Protection? yes no
Type of external coating: 3LPE

2
4 Operating Parameters for Normal Operation for Inspection Survey
Product: Methane Methane
Hydrostatic pressure [bar]:
Pump pressure [bar]: - -
Maximum pressure [bar]: 62 62
Pressure drop in line [bar]: 1 1
3
Pump flow [m /h]:
Flow rate [m/s]:
Flow rate controllable: No yes no
Temperature range [°C]: at launch site: 25 at launch site: 25
at receive site: 25 at receive site: 25

5 Launcher/Receiver Description Launcher Receiver


(please refer to sketch below)
Location
Orientation (horizontal, vertical, inclined) h v i h v i
Length of oversize [mm]
Length of nominal: + Reducer [mm]
Length of reducer: + Nominal [mm]
Reducer type (c = concentric, e = eccentric) c e c e
Outer diameter of oversize: C [inch]
Inner diameter of oversize [mm]
External diameter of nominal: D [inch]
Internal diameter of nominal [mm]
Wall thickness of oversize [mm]
Wall thickness of nominal [mm]
Size of kicker/bypass line [inch]
Location of kicker/bypass line from end closure: F [mm]
Orientation of kicker/bypass line [degree]
Balance line, distance to valve: I [mm]
Type and bore [mm] of block valve
Does the trap valve close tightly? Yes No yes no
No. of venting nozzles 1 1
No. of pig signals 0 1
Height of trap bottom above ground: H [mm] 0.7 0.7
Inclination of trap (°)
Free working space behind end closure: G (LxW) [mm] 3.5 10
Temporary trap yes no yes no
Is trap demountable? Yes yes no

3
5 Launcher/Receiver Description Launcher Receiver
(please refer to sketch below)

A B

G F
C
D

H I

Please enclose drawing(s)!

6 Installations
Distance Distance Main Distance
to to Circ. line Offtake valve –
Installation launcher* receiver* pos. OD ID ID** t*** main line**
[m] [m] [°] [mm] [mm] [mm] [mm] [m]

* either distance is sufficient ** information required for batch runs only *** t = wall thickness

4
7 Pipeline History
Year of construction: 1997
Previous inspections: Geometry Inspection: year(s):
MFL inspection: year(s): 2014
TFI crack detection inspection: year(s):
Ultrasound CD inspection: year(s):
Ultrasound WM inspection: year(s):
Others(pls. specify): year(s):

Frequency of cleaning: x per week, month, year


other: perform prior to MFL
Type of cleaning scraper: foam, cup, disk, brush,
metal pins, magnet, others:
Type/amount of debris: Dust
Damage to tools or pipeline No
failures:

8 Contacts
Name
GES Sales Manager
GES Project Manager
Client's Representative LEE JIA LIANG 017-5652609
Agent's Representative

9 Other Relevant Information or Remarks


1)
2)
3)
4)