VDA2 AIAG

PPA (as per VDA2) PPAP (as per Aiag)


ref ref
Cover sheet of PPA report 17-18 Part Submission Warrant (PSW)
1.1 Results of checks for product approval (eg geometries, 9- 10-13 Dimensional results (documents) -
1.2 functionality dimensional reports, material certificates, heat Material, heat treatments Certificates,
1.3 treatment certificates, test, weight etc) tests – Appearance approval report
2 Certified samples (quantity) 14 Certified samples
Technical specifications (eg customer drawing, CAD data, 1-2-3 Drawing / table with reference to
3
specifications, technical changes not yet on the drawing) characteristics
4 DFMEA (for co-design suppliers) 4 Product FMEA
1 Drawing / table with reference to
5 Approval to drawing / development, by supplier
characteristics
6 Data on Materials in IMDS system - Material data
7 Software test report (if applicable) - -
8 PFMEA 6 Process FMEA
9 Process flow chart (production and controls) 5 Process flow chart
10 Control Plan 7 Control Plan
11 Confirmation of process capability (preliminary) 11 Preliminary process capability
Customer specific requirements
12 Evidence of conformity for Special characteristics
(PQ08.02)
12-16 List of measurement devices and labs
13 List of gauges/measurement systems (if specific)
docs
14 Measurement system analysis (MSA) 8 Measurement system analysis (MSA)
15 Tooling list (if specific) - -
Confirmation of agreed productive capacity (feasibility -
16 -
analysis)
17 Self-assessment through product & process matrix - -
2 Documents of technical changes not yet
18 Part history (list of product and process changes)
on the drawing (if any)
19 Confirmation of packaging and storage suitability - -
20 Status of supply-chain PPAP/PPA - -
21 Coating systems approval (if applicable) - -
15 Reference master