PWA VENDOR LIST (PVL) 1
SCHEDULE OF MATERIAL 2
SPECIFICATION REFERENCE 3
TECHNICAL DATA SHEET
− PROJECT DATA SHEET 4
− TECHNICAL DATA SHEET FOR STOPLOG
COMPANY PROFILE
− SUPPLIER COMPANY PROFILE 5
− MANUFACTURER COMPANY PROFILE
ORGANIZATION CHART
− SUPPLIER COMPANY PROFILE 6
− MANUFACTURER COMPANY PROFILE
COMPLIANCE SHEET 7
LICENSE FOR LOCAL AGENT 8
PRODUCT CATALOGUES 9
SAMPLE CERTIFICATE FOR COUNTRY OF ORIGIN 10
SAMPLE TEST CERTIFICATES 11
SAMPLE NAME PLATE 12
SPARE PARTS LIST 13
SAMPLE WARRANTY CERTIFICATE 14
ISO CERTIFICATES
− ISO CERTIFICATES FOR SUPPLIER 15
− ISO & QUALITY CERTIFICATES FOR MANUFACTURER
REFERENCE LIST 16
PREVIOUS APPROVAL IN QATAR 17
AUTHORIZATION LETTER 18
STORAGE AND HANDLING INSTRUCTIONS 19
GA DRAWING 20
INSPECTION TEST PLANS (QCP/ITP)-SAMPLE 21
INSTALLATION/OPERATION AND MAINTENANCE INSTRUCTIONS-SAMPLE 22
Date: 31/10/2022
General
Scope
This document specifies the list of Manufacturers, Mechanical & Electrical Sub-Contractors and Miscellaneous Service Providers who are
approved by the Prequalification and classification committee (PCC) to provide materials and services.
Related Works
Qatar Construction Standard (QCS), Section 1 - General
Applicability
1. Contractors may employ any Manufacturer, Mechanical and Electrical Contractor, and/or any other Service Provider listed in the
Approved Vendors List at the date of submission of the tender. Any approved party added subsequent to the submission of the
tender may also be considered.
2. Where there is no category for the Manufacturer; the contractor shall submit details of the materials in accordance with Qatar
Construction Standard (QCS), Section 1 Part 7 and the approval shall be granted by the supervising consultant of the project on
project-by-project basis.
3. Where the materials and the services are listed in this document, they shall only be obtained from one of the parties on this
approved list, unless otherwise agreed by the Engineer.
4. If a Supplier/Manufacturer proposes to change the manufacturing location from the location stated in this list, or add new
manufacturing facilities, the Prequalification and classification (PCC) Committee of Public Works Authority (PWA) shall be informed
in writing by the manufacturer. The newly proposed manufacturing facility must obtain the Approval from the Prequalification and
classification (PCC) Committee prior to submission of any material submittals from this new location.
5. Products, materials and/or equipment referred to in this list that are proposed for use in PWA projects must be formally submitted,
reviewed and approved by the Supervision Consultant under the regular materials review and approval procedure, regardless of any
“Approval in principle” letter previously issued by PWA.
6. Vendors shall be enlisted for two years from the date of the official letter subject to them maintaining the same quality, terms and
conditions of the original application, and annual fulfillment of the performance report.
7. Any products and/or manufactures referred to in this list must fully comply with the requirements of the latest version of Qatar
Construction Standard.
8. Where there are less than Three (3) Manufacturers in the Category, the contractor is not obligated to follow the category. The
contractor shall obtain an alternative manufacturer and submit the details of the materials in accordance with Qatar Construction
Standard (QCS) and the approval shall be granted by the supervising consultant of the project on project-by-project basis.
Category: Penstocks
Manufacturers Agents
KWT International
VAG GmbH
SUPPLY, DELIVERY & SUPERVISION OF TESTING AND COM M ISSIONING OF SS M OTORIZED PENSTOCK &
A
SS STOPLOG AS PER QCS 2014, PROJECT SPEC AND M ATERIAL SUBM ITTAL APPROVAL.
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
1 PEDESTAL, RISING STEM, IC = 32500MM, SPINDLE LENGTH 33000 MM. - TAG NO. SG-0010, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32 & OFF SEATING 32
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
2 PEDESTAL, RISING STEM, IC = 32500MM, SPINDLE LENGTH 33000 MM. - TAG NO. SG-0011, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32 & OFF SEATING 32
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
3 PEDESTAL, RISING STEM, IC = 32575MM, SPINDLE LENGTH 33075 MM. - TAG NO. SG-0111, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
4 PEDESTAL, RISING STEM, IC = 32575MM, SPINDLE LENGTH 33075 MM. - TAG NO. SG-0211, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
5 PEDESTAL, RISING STEM, IC = 32825MM, SPINDLE LENGTH 33325 MM. - TAG NO. SG-0112, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
6 PEDESTAL, RISING STEM, IC = 32825MM, SPINDLE LENGTH 33325 MM. - TAG NO. SG-0212, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
7 PEDESTAL, RISING STEM, IC = 32843MM, SPINDLE LENGTH 33343 MM. - TAG NO. SG-0030, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
8 PEDESTAL, RISING STEM, IC = 32843MM, SPINDLE LENGTH 33343 MM. - TAG NO. SG-0031, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
9 PEDESTAL, RISING STEM, IC = 32875MM, SPINDLE LENGTH 33375 MM. - TAG NO. SG-0113, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.4 & OFF SEATING 32.4
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
10 PEDESTAL, RISING STEM, IC = 32875MM, SPINDLE LENGTH 33375 MM. - TAG NO. SG-0213, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.4 & OFF SEATING 32.4
500 X 500 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
11 PEDESTAL, RISING STEM, IC = 34600MM, SPINDLE LENGTH 35100 MM. - TAG NO. SG-0035, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 34.1 & OFF SEATING 34.1
500 X 500 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
12 PEDESTAL, RISING STEM, IC = 34600MM, SPINDLE LENGTH 35100 MM. - TAG NO. SG-0036, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 34.1 & OFF SEATING 34.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32575MM, ZONE 1
13 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32575MM, ZONE 1
14 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32825MM, ZONE 1
15 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32825MM, ZONE 1
16 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
17 STORAGE RACK FOR SS STOPLOG Nos. 4
18 LIFTING BEAM FOR SS STOPLOG Nos. 4
19 SPARE PARTS FOR ALL MOTORIZED SS PENSTOCK & SS STOPLOG For 2 YEARS OPERATIONS LOT 1
Page 1 of 1
3-BOQ reference/Specification
section/Specific reference drawing
SPECIFICATION
REFERENCE
QCS 2014 Section 08: Drainage Works Page 15
Part 05: Valves, Penstocks and Appurtenances
5 All plastic materials shall be non-toxic ultraviolet stabilised and shall have fire resistance as
specified in BS 475 and be to Class P and Class I of Part 5 and 7 thereof respectively.
6 All other requirements shall be as specified in Clause 5.1.3 Clause 5.11.2 herein.
7 Plastic penstocks shall only be used when indicated in the Contract Documents and
approved by the Engineer.
5.11.5 Stoplogs
.
1 Stoplogs shall be fabricated from reinforced composite plastic material which is non-toxic and
l
.l.
stabilised against ultraviolet light. Asbestos shall not be used in the manufacture of the stop-
logs.
rw
2 Plastic logs of 300 mm and 400 mm depths shall be furnished to provide closure of stoplog
openings. Full depth gates shall not be acceptable.
3 ta
Each log shall be provided with a stainless steel eye bolt at each end which fits into a recess
qa
in the under surface of the next log. Two lifting poles fitted with hooked ends for engaging
the eye bolts shall be furnished for each facility and shall be mounted locally on a handrail
supported pole rack. Poles and racks shall be constructed of aluminium and bolts of
as
stainless steel.
se
4 Stoplogs shall provide a high degree of sealing with a leakage rate of less than 0.04 l/sqm of
seating perimeter. Stoplog frame shall be for insertion in a wall and invert recess.
er
6 Frames shall be manufactured from stainless steel BS 970 or BS 1449 Grade 316. All frames
shall be suitably reinforced and include corner gussets where necessary. All fasteners shall
be stainless steel.
it o
7 Frames shall be fitted with seals which are molecularly incompatible with the closure
et
material. Where necessary, the seals shall be fixed with corrosion resistant retaining strips
and stainless steel fasteners.
m
5.12.1 Lifts
1 Lifts shall be designed to operate the gate of the specified head with a maximum of 25 kg
force applied to the device. The lift shall be a liftnut for tee key operation or gear/handwheel
lift as designated.
PROJECT DRAWINGS
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
X Public Works Authority
P.O.Box 22188
1:1 Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
** PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
F F
Design Consultant :
SHEEHANIYA TERMINAL PS
INSTRUMENTATION
LEGEND AND SYMBOLS
P&ID
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-IC-0021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
LEGEND
E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
F F
Design Consultant :
SHEEHANIYA TERMINAL PS
INSTRUMENTATION
PUMPING STATION
P&ID
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-IC-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
Inst / Equip / LCP Signal Tag Description Drawing Ref No. Hardwired I/O RTD Communication Remarks
A A
Tag DI DO AI AO
YI-0130A_RM Dry well Main Pump 1 Remote Status C823-P03-STN-IC-6101 1
YI-0130B_RN Dry well Main Pump 1 Running Status C823-P03-STN-IC-6101 1
YA-0130A_FA Dry well Main Pump 1 Fault Alarm C823-P03-STN-IC-6101 1
YA-0130B_E-Stop Dry well Main Pump 1 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0130 Dry well Main Pump 1 Trip Alarm
YA-0130C_TRIP C823-P03-STN-IC-6101 1
VFD Panel
HS-0130_S/S Dry well Main Pump 1 Start / Stop Command C823-P03-STN-IC-6101 1
SI-0130 Dry well Main Pump 1 Speed Signal C823-P03-STN-IC-6101 1
SK-0130 Dry well Main Pump 1 Speed Control Command C823-P03-STN-IC-6101 1
P-0130_VFD Dry well Main Pump 1 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0130D Dry well Main Pump 1 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
B MA-0130 Dry well Main Pump 1 Moisture Ingress Alarm C823-P03-STN-IC-6101 1 B
P-0130 TAH-0130A Dry well Main Pump 1 Winding Temperature High C823-P03-STN-IC-6101 1
(Protection monitor) TAH-0130B Dry well Main Pump 1 Bearing Temperature High C823-P03-STN-IC-6101 1
VAH-0130 Dry well Main Pump 1 Vibration High C823-P03-STN-IC-6101 1
P-0130_PM Dry well Main Pump 1 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
PI-0130 Dry well Main Pump 1 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0130
PAH-0130 Dry well Main Pump 1 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0130 Signal Converter
ZSO-0130 ZSO-0130 Dry well Main Pump 1 Discharge No Flow Alarm C823-P03-STN-IC-6101 1
YI-0140A_RM Dry well Main Pump 2 Remote Status C823-P03-STN-IC-6101 1
YI-0140B_RN Dry well Main Pump 2 Running Status C823-P03-STN-IC-6101 1
YA-0140A_FA Dry well Main Pump 2 Fault Alarm C823-P03-STN-IC-6101 1
YA-0140B_E-Stop Dry well Main Pump 2 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0140
YA-0140C_TRIP Dry well Main Pump 2 Trip Alarm C823-P03-STN-IC-6101 1
C VFD Panel C
HS-0140_S/S Dry well Main Pump 2 Start / Stop Command C823-P03-STN-IC-6101 1
SI-0140 Dry well Main Pump 2 Speed Signal C823-P03-STN-IC-6101 1
SK-0140 Dry well Main Pump 2 Speed Control Command C823-P03-STN-IC-6101 1
P-0140_VFD Dry well Main Pump 2 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0140D Dry well Main Pump 2 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
MA-0140 Dry well Main Pump 2 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
P-0140 TAH-0140A Dry well Main Pump 2 Winding Temperature High C823-P03-STN-IC-6101 1
(Protection monitor) TAH-0140B Dry well Main Pump 2 Bearing Temperature High C823-P03-STN-IC-6101 1
VAH-0140 Dry well Main Pump 2 Vibration High C823-P03-STN-IC-6101 1
P-0140_PM Dry well Main Pump 2 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
PI-0140 Dry well Main Pump 2 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0140
PAH-0140 Dry well Main Pump 2 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0140 Signal Converter
D ZSO-0140 ZSO-0140 Dry well Main Pump 2 Discharge No Flow Alarm C823-P03-STN-IC-6101 1 D
YI-0150A_RM Dry well Main Pump 3 Remote Status C823-P03-STN-IC-6101 1
YI-0150B_RN Dry well Main Pump 3 Running Status C823-P03-STN-IC-6101 1
YA-0150A_FA Dry well Main Pump 3 Fault Alarm C823-P03-STN-IC-6101 1
YA-0150B_E-Stop Dry well Main Pump 3 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0150
YA-0150C_TRIP Dry well Main Pump 3 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel (Future)
HS-0150_S/S
SI-0150
Dry well Main Pump 3 Start / Stop Command
Dry well Main Pump 3 Speed Signal
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
1
1
ISSUED FOR CONSTRUCTION
SK-0150 Dry well Main Pump 3 Speed Control Command C823-P03-STN-IC-6101 1
P-0150_VFD Dry well Main Pump 3 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0150D Dry well Main Pump 3 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
Rev. Date Revision Details Drawn Chkd. Appd.
MA-0150 Dry well Main Pump 3 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
P-0150 Dry well Main Pump 3 Winding Temperature High
E TAH-0150A C823-P03-STN-IC-6101 1 E
(Protection monitor)
(Future) TAH-0150B Dry well Main Pump 3 Bearing Temperature High C823-P03-STN-IC-6101 1 Public Works Authority
VAH-0150 Dry well Main Pump 3 Vibration High C823-P03-STN-IC-6101 1
P.O.Box 22188
P-0150_PM Dry well Main Pump 3 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
Tel. : (0974) 44950000
PI-0150 Dry well Main Pump 3 Discharge Pressure C823-P03-STN-IC-6101 1 Fax. : (0974) 44950999
PIT-0150 www.ashghal.gov.qa Qatar Deserves The Best
PAH-0150 Dry well Main Pump 3 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0150 Signal Converter
ZSO-0150 ZSO-0150 Dry well Main Pump 3 Discharge No Flow Alarm C823-P03-STN-IC-6101 1
YI-0230A_RM
YI-0230B_RN
YA-0230A_FA
Dry well Main Pump 4 Remote Status
Dry well Main Pump 4 Running Status
Dry well Main Pump 4 Fault Alarm
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
1
1
1
PA
PROJECTS AFFAIRS
YA-0230B_E-Stop Dry well Main Pump 4 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0230
YA-0230A_TRIP Dry well Main Pump 4 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel DESIGNS DEPARTMENT
HS-0230_S/S Dry well Main Pump 4 Start / Stop Command C823-P03-STN-IC-6101 1
F F
SI-0230 Dry well Main Pump 4 Speed Signal C823-P03-STN-IC-6101 1 Design Consultant :
SK-0230 Dry well Main Pump 4 Speed Control Command C823-P03-STN-IC-6101 1
P-0230_VFD Dry well Main Pump 4 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0230D Dry well Main Pump 4 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
MA-0230 Dry well Main Pump 4 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
Stantec UK Limited, Box : 207312, 9th Floor,
P-0230 TAH-0230A Dry well Main Pump 4 Winding Temperature High C823-P03-STN-IC-6101 1 Al Mana Tower, C Ring Road, Doha-Qatar,
(Protection monitor) TAH-0230B Dry well Main Pump 4 Bearing Temperature High C823-P03-STN-IC-6101 1 Tel : (+974) 44804622 Fax : (+974) 44368694
VAH-0230 Dry well Main Pump 4 Vibration High C823-P03-STN-IC-6101 1 Project Name:
P-0230_PM Dry well Main Pump 4 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type CONSTRUCTION OF TERMINAL
PI-0230 Dry well Main Pump 4 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0230
PAH-0230 Dry well Main Pump 4 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0230 Signal Converter
SEWAGE PUMPING STATION AT
ZSO-0230 ZSO-0230 Dry well Main Pump 4 Discharge No Flow Alarm C823-P03-STN-IC-6101 1 DOHA NORTH STW PACKAGE 3
G YI-0240A_RM Dry well Main Pump 5 Remote Status C823-P03-STN-IC-6101 1 G
YI-0240B_RN Dry well Main Pump 5 Running Status C823-P03-STN-IC-6101 1
C823/3
YA-0240A_FA Dry well Main Pump 5 Fault Alarm Project Code:
C823-P03-STN-IC-6101 1 PA 2020 C 009 G
YA-0240B_E-Stop Dry well Main Pump 5 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0240 Drawing Title:
YA-0240A_TRIP Dry well Main Pump 5 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel
HS-0240_S/S Dry well Main Pump 5 Start / Stop Command C823-P03-STN-IC-6101 1 SHEEHANIYA TERMINAL PS
SI-0240 Dry well Main Pump 5 Speed Signal C823-P03-STN-IC-6101 1 INSTRUMENTATION
SK-0240 Dry well Main Pump 5 Speed Control Command C823-P03-STN-IC-6101 1
P-0240_VFD Dry well Main Pump 5 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type IO SCHEDULE
YA-0240D Dry well Main Pump 5 Mechanical Seal Leakage C823-P03-STN-IC-6101 1 SHEET 1 OF 10
MA-0240 Dry well Main Pump 5 Moisture Ingress Alarm C823-P03-STN-IC-6101 1 Drawn: Checked:
Dry well Main Pump 5 Winding Temperature High K. SHETTY I. KHAN
P-0240 TAH-0240A C823-P03-STN-IC-6101 1
(Protection monitor) Designed: Approved:
H TAH-0240B Dry well Main Pump 5 Bearing Temperature High C823-P03-STN-IC-6101 1 K. SHETTY K. PEZHGORSKI H
VAH-0240 Dry well Main Pump 5 Vibration High C823-P03-STN-IC-6101 1 Date: Scale:
JUNE 2019 NTS
P-0240_PM Dry well Main Pump 5 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-IC-6201 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
F F
Design Consultant :
SHEEHANIYA TERMINAL PS
MECHANICAL
GENERAL NOTES
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
MARCH 2019 NO SCALE
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-ME-0021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
DN 600
DN 600
DN 600
DN 400
D D
DN 600
DN 600
DN 600
Rev. Date Revision Details Drawn Chkd. Appd.
E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
F F
Design Consultant :
SHEEHANIYA TERMINAL PS
MECHANICAL
PROCESS FLOW DIAGRAM
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
MARCH 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-ME-1021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
0 2.5 5 7.5 10 12.5m
E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best
PA
PROJECTS AFFAIRS
DESIGNS DEPARTMENT
F F
Design Consultant :
SHEEHANIYA TERMINAL PS
MECHANICAL
PROPOSED SITE LAYOUT
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1:250 ON A1
Status:
CONTRACT
Drawing Number: Revision:
C823-P03-STN-ME-1101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
KEY PLAN
NOTES
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
24600 METERS UNLESS SHOWN OTHERWISE.
ELECTRICAL CABLE TRAY, 2. REFER DRAWINGS C823-P03-STN-ME-0026 FOR MECHANICAL
REFER ELECTRICAL DRAWINGS GENERAL NOTES.
FOR DETAILS 3. REFER TO RESPECTIVE DISCIPLINE DRAWINGS FOR DETAILS OF
INSTRUMENTATION, ELECTRICAL, HVAC, FIRE DETECTION AND
PROTECTION AND CCTV.
4. REFER CIVIL DRAWINGS FOR DIMENSION AND OTHER DETAILS OF
VARIOUS CHAMBERS AND DRY WELL.
5. DETAILS OF STRUCTURAL COMPONENTS ARE SHOWN
REPRESENTATIVE, REFER STRUCTURAL DRAWINGS FOR DETAILS.
6. ELEVATION LEVELS SHOWN ON WET WELL SIDE ARE TOP OF
PASSENGER SLAB LEVELS, FOR BENCHING LEVELS REFER TO CIVIL DRAWINGS
LIFT REST ROOM
C B C823-P03-STN-CV-2126 AND 2127. C
3885
ME-2112 7. REFER TO CIVIL DRAWINGS C823-P03-STN-CV-2112 AND 2113 FOR
4100
SIZES OF ACCESS OPENINGS.
DRY WELL -3.650
-3.560
-3.560
-3.560 FIRE -3.560
-3.560
STAIRCASE
UP
P-0230
UP
930 DRY WELL MAIN
PUMP (TYP)
REFER CIVIL DRAWING
5300
C823-P03-STN-CV-2111
FOR WALL THICKNESS -2.530
SCR-0210
6767
7100 SL-0212 2200 WET WELL NO 2 -1.235
P-0240
MECHANICAL
D GRAB SCREEN 2 D
SG-0011 SL-0211 SG-0212
FOR DETAILS OF (STANDBY)
CHAMBER NO 2
SG-0211 PENSTOCK STAIRCASE
5000
(FUTURE)
P-0220
SG-0036
24000
1000
SCREEN CHAMBER NO 2
SG-0031
P-0040
ISSUED FOR CONSTRUCTION
6000 3600
-4.506
5300
SG-0113 1200
2 NOS DN1000 RCC SG-0010 SL-0111 SG-0111 SCR-0110 SG-0112
PIPE WITH GRP LINING MECHANICAL
1000x1000 MOTORISED 1000x1000 P-0130
INCOMING GRAVITY GRAB SCREEN 1
PENSTOCK (TYP) STOPLOG (TYP) SL-0112 WET WELL NO 1
SEWER (DUTY)
F
DESIGNS DEPARTMENT F
Design Consultant :
-1.235
6000 -2.530
1200
UP UP
CONSTRUCTION OF TERMINAL
MECHANICAL
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
C823-P03-STN-ME-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
KEY PLAN
NOTES
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
24600 METERS UNLESS SHOWN OTHERWISE.
ELECTRICAL CABLE TRAY, 2. REFER DRAWINGS C823-P03-STN-ME-0026 FOR MECHANICAL
REFER ELECTRICAL DRAWINGS GENERAL NOTES.
FOR DETAILS 3. REFER TO RESPECTIVE DISCIPLINE DRAWINGS FOR DETAILS OF
INSTRUMENTATION, ELECTRICAL, HVAC, FIRE DETECTION AND
PROTECTION AND CCTV.
4. REFER CIVIL DRAWINGS FOR DIMENSION AND OTHER DETAILS OF
VARIOUS CHAMBERS AND DRY WELL.
5. DETAILS OF STRUCTURAL COMPONENTS ARE SHOWN
REPRESENTATIVE, REFER STRUCTURAL DRAWINGS FOR DETAILS.
6. ELEVATION LEVELS SHOWN ON WET WELL SIDE ARE TOP OF
PASSENGER SLAB LEVELS, FOR BENCHING LEVELS REFER TO CIVIL DRAWINGS
LIFT REST ROOM
C B C823-P03-STN-CV-2126 AND 2127. C
3885
ME-2112 7. REFER TO CIVIL DRAWINGS C823-P03-STN-CV-2112 AND 2113 FOR
4100
SIZES OF ACCESS OPENINGS.
DRY WELL -3.650
-3.560
-3.560
-3.560 FIRE -3.560
-3.560
STAIRCASE
UP
P-0230
UP
930 DRY WELL MAIN
PUMP (TYP)
REFER CIVIL DRAWING
5300
C823-P03-STN-CV-2111
FOR WALL THICKNESS -2.530
SCR-0210
6767
7100 SL-0212 2200 WET WELL NO 2 -1.235
P-0240
MECHANICAL
D GRAB SCREEN 2 D
SG-0011 SL-0211 SG-0212
FOR DETAILS OF (STANDBY)
CHAMBER NO 2
SG-0211 PENSTOCK STAIRCASE
5000
(FUTURE)
P-0220
SG-0036
24000
1000
SCREEN CHAMBER NO 2
SG-0031
P-0040
ISSUED FOR CONSTRUCTION
6000 3600
-4.506
5300
SG-0113 1200
2 NOS DN1000 RCC SG-0010 SL-0111 SG-0111 SCR-0110 SG-0112
PIPE WITH GRP LINING MECHANICAL
1000x1000 MOTORISED 1000x1000 P-0130
INCOMING GRAVITY GRAB SCREEN 1
PENSTOCK (TYP) STOPLOG (TYP) SL-0112 WET WELL NO 1
SEWER (DUTY)
F
DESIGNS DEPARTMENT F
Design Consultant :
-1.235
6000 -2.530
1200
UP UP
CONSTRUCTION OF TERMINAL
MECHANICAL
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
C823-P03-STN-ME-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
B
SG-0213
ME-2112
WET WELL
DISTRIBUTION CHAMBER 2
A A
SG-0031
1000x1000 STOPLOG
1000x1000 MOTORISED
SL-0211 PENSTOCK
1000
SCREEN CHANNEL NO. 2 -4.250
5000
KEY PLAN
3500
-4.175
1000
SG-0211 SCR-0210 SG-0212 NOTES
B B
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
TO BE FILLED WITH SL-0212 1000x1000 MOTORISED OTHERWISE.
1900
MASS CONCRETE PENSTOCK 2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
-4.175 SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
SL-0112
SG-0030 BY CONTRACTOR.
3. SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
A THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
SG-0111 SCR-0110 SG-0112
ME-2112 RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
SPECIFICATION.
5000
-4.250 4. CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
SCREEN CHANNEL NO. 1
COMMENCEMENT OF WORK AT SITE.
5. VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
C MECHANICAL GRAB CONTRACTOR PRIOR TO CONSTRUCTION. C
SL-0111
SCREEN (TYP. OF 2) SG-0113 6. TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
2200 MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
9600 FINALISED
7. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
NECESSARY APPROVALS AND PERMITS FROM PWA AND
WET WELL OTHER COMPETENT AUTHORITIES.
DISTRIBUTION CHAMBER 1 8. PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
WITH REQUIRED SUPPORTING ARRANGEMENT.
9 INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
D SCREEN DISTRIBUTION CHAMBER PLAN AT CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER
REQUIREMENTS.
D
EL -5.000 10. THE OPENING SHOWN FOR SCREENS ARE INDICATIVE AND MAY
CHANGE AS PER SUPPLIER REQUIREMENTS.
11. REFER DRAWING C823-P03-STN-ME-2301 AND 2302 FOR TAG
NUMBERS OF EQUIPMENT.
WASHER AND COMPACTOR 1 12. TOP OF SCREEN BARS TO BE MINIMUM 1m ABOVE TOP OF
(DUTY) WATER LEVEL
B
ME-2112
MECHANICAL
GRAB SCREEN 2
(STANDBY)
F A FFL +29.000
DESIGNS DEPARTMENT F
ME-2112 FFL +29.000 Design Consultant :
MECHANICAL
GRAB SCREEN 1
(DUTY)
Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
SCREEN CHANNEL Project Name:
(UPSTREAM) ACCESS SCREW CONVEYOR 1 CONSTRUCTION OF TERMINAL
MECHANICAL
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
PUMP STATION
GRAB SCREEN PLAN
Drawn: Checked:
GROUNG FLOOR PLAN Designed:
A. MANE
Approved:
N. NAMBIARUVEETTIL
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-
C823-P03-STN-ME-2111 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
B
SG-0213
ME-2112
WET WELL
DISTRIBUTION CHAMBER 2
A A
SG-0031
1000x1000 STOPLOG
1000x1000 MOTORISED
SL-0211 PENSTOCK
1000
SCREEN CHANNEL NO. 2 -4.250
5000
KEY PLAN
3500
-4.175
1000
SG-0211 SCR-0210 SG-0212 NOTES
B B
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
TO BE FILLED WITH SL-0212 1000x1000 MOTORISED OTHERWISE.
1900
MASS CONCRETE PENSTOCK 2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
-4.175 SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
SL-0112
SG-0030 BY CONTRACTOR.
3. SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
A THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
SG-0111 SCR-0110 SG-0112
ME-2112 RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
SPECIFICATION.
5000
-4.250 4. CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
SCREEN CHANNEL NO. 1
COMMENCEMENT OF WORK AT SITE.
5. VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
C MECHANICAL GRAB CONTRACTOR PRIOR TO CONSTRUCTION. C
SL-0111
SCREEN (TYP. OF 2) SG-0113 6. TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
2200 MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
9600 FINALISED
7. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
NECESSARY APPROVALS AND PERMITS FROM PWA AND
WET WELL OTHER COMPETENT AUTHORITIES.
DISTRIBUTION CHAMBER 1 8. PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
WITH REQUIRED SUPPORTING ARRANGEMENT.
9 INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
D SCREEN DISTRIBUTION CHAMBER PLAN AT CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER
REQUIREMENTS.
D
EL -5.000 10. THE OPENING SHOWN FOR SCREENS ARE INDICATIVE AND MAY
CHANGE AS PER SUPPLIER REQUIREMENTS.
11. REFER DRAWING C823-P03-STN-ME-2301 AND 2302 FOR TAG
NUMBERS OF EQUIPMENT.
WASHER AND COMPACTOR 1 12. TOP OF SCREEN BARS TO BE MINIMUM 1m ABOVE TOP OF
(DUTY) WATER LEVEL
B
ME-2112
MECHANICAL
GRAB SCREEN 2
(STANDBY)
F A FFL +29.000
DESIGNS DEPARTMENT F
ME-2112 FFL +29.000 Design Consultant :
MECHANICAL
GRAB SCREEN 1
(DUTY)
Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
SCREEN CHANNEL Project Name:
(UPSTREAM) ACCESS SCREW CONVEYOR 1 CONSTRUCTION OF TERMINAL
MECHANICAL
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
PUMP STATION
GRAB SCREEN PLAN
Drawn: Checked:
GROUNG FLOOR PLAN Designed:
A. MANE
Approved:
N. NAMBIARUVEETTIL
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-
C823-P03-STN-ME-2111 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
OTHERWISE.
2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
A BY CONTRACTOR. A
SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
3. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
4. SPECIFICATION.
CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
5. COMMENCEMENT OF WORK AT SITE.
VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
6. CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
CONTRACTOR PRIOR TO CONSTRUCTION.
TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
+40.450 7. MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
FINALISED
8. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
B NECESSARY APPROVALS AND PERMITS FROM PWA AND B
OTHER COMPETENT AUTHORITIES.
9 PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
OVERHEAD CRANE SWL - 2.5 TON AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
10. WITH REQUIRED SUPPORTING ARRANGEMENT.
INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
+35.200 +35.200
11. SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
+35.200 CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER
6565
6565
COM-0108 MAN BASKET ENTRY SG-0030 13. CONTRACTOR SHALL PROVIDE SUFFICIENT SPACE FOR
REMOVABLE FOR ACCESS INSTALLATION OF PENSTOCKS DURING CONSTRUCTION AND
SG-0011 SL-0111 SKIP BENCHING AND GRP LINING SHALL BE SUITABLY CORRECTED
SAFETY CHAIN
(TYP) SG-0113 AS PER FINAL DESIGN AFTER PENSTOCK INSTALLATIONS.
CON-0209 COM-0108
SG-0035
SG-0111 WASHER COMPACTOR
D CON-0209 D
SCREW CONVEYOR OCU CHAMBER
SG-0112
STOPLOG GUIDE MAN ACCESS BASKET
TRACK (600x600)MIN
E 300mm THICK E
PENSTOCK SPINDLE
CONCRETE WALL
SUPPORT (TYP)
INTERMEDIATE SLAB
FFL +5.320
CLEAR OPENING
7100 6000 3600 2200 6000 1000
F FFL +5.320 INTERMEDIATE SLAB DESIGNS DEPARTMENT F
1000x1000 MOTORISED 1000x1000 1000x1000 TWL +5.000
500x500 Design Consultant :
PENSTOCK STOPLOG STOPLOG
MOTORISED 1900
PENSTOCK
H
FLUSHING PIPEWORK DISTRIBUTION CHAMBER SLAB
SECTION B Designed:
S. DESHMUKH
Approved:
K. PEZHGORSKI H
(SCALE 1 : 100) ME-2101
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SECTION A SCALE 1 : 100 CONTRACT
ME-2101 m1 0 10 m Drawing Number: Revision:
(SCALE 1 : 100)
File Name-
C823-P03-STN-ME-2112 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES
1. THIS IS GRAPHICAL REPRESENTATION FOR ILLUSTRATION
PURPOSE ONLY. REFER TO OTHER RELEVANT DRAWINGS FOR
DIMENSIONS AND OTHER DETAILS.
A A
+40.450
B B
INTERMEDIATE SLAB
+5.270
COM-0108
C C
+29.000
SG-0211
D D
SCR-0210
E E
F
DESIGNS DEPARTMENT F
Design Consultant :
CONSTRUCTION OF TERMINAL
MECHANICAL
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
PUMP STATION
GRAB SCREEN 3D VIEWS
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 NO SCALE
Status:
CONTRACT
Drawing Number: Revision:
File Name-
C823-P03-STN-ME-2113 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES
<PIPE AND FITTING SCHEDULE (NEW)> <PIPE AND FITTING SCHEDULE (NEW)> 1. DRAWING TO BE READ IN CONCLUSION WITH MECHANICAL
VALVE SCHEDULE (PHASE 3)
DRAWINGS C823-P03-STN-ME-2122 THRU 2153.
BOM... DESCRIPTION DIA MATERIAL QTY. BOM... DESCRIPTION DIA MATERIAL QTY. VALVE SCHEDULE... DESCRIPTION DIA QTY REMARK
2. CONTRACTOR TO SELECT THE PUMPS TO ACHIEVE THE
A 1 FLANGED BELL MOUTH 600 DI 6 63 2256mm LONG DOUBLE FLANGE PIPE 600 DI 2 ULTIMATE PUMPING CAPACITY OF 1200 LPS WITH BOTH WET A
SPINDLE SHALL BE RISING
2 90 FLANGED BEND 600 DI 8 64 NOT USED MOV-0151; MOV-0251 MOTORISED GATE VALVE 600 2 WELLS AND 4 PUMPS IN OPERATION AND 600 LPS WITH SINGLE
TYPE
WET WELL AND 2 PUMPSIN OPERATION.
3 4485mm LONG DOUBLE FLANGE PIPE WITH IPF 600 DI 6 65 90 FLANGED BEND 80 DI 4
4 DISMANTLING JOINT 600 DI 11 66 750mm LONG DOUBLE FLANGE PIPE 80 DI 2 WITH PROXOMIN SWITCH
NRV-0150; NRV-0250 NON RETURN VALVE 600 2
67 90 FLANGED DUCKFOOT BEND 600 DI 2 AND BALANCING WEIGHT
1000mm LONG DOUBLE FLANGE PIPE WITH 1 Nos OF 15 NB BOSS FOR
5 600 DI 4
PRESSURE INSTRUMENT 68 310mm LONG FLANGE PLAIN END PIPE 80 DI 2
SPINDLE SHALL BE RISING
6 ECCENTRIC REDUCER 600x400 DI 4 69 1130mm LONG FLANGE PLAIN END PIPE 80 DI 2 MOV-0152; MOV-0252 MOTORISED GATE VALVE 450 2
TYPE
7 CONCENTRIC REDUCER 350x450 DI 4 70 2148mm LONG DOUBLE FLANGE PIPE WITH IPF 600 DI 2
24 5500mm LONG DOUBLE FLANGE PIPE 300 DI 2 NRV-0230; NRV-0240; WITH PROXIMIN SWITCH AND BALANCING
NON RETURN VALVE 450 4
D 25 2940mm LONG DOUBLE FLANGE PIPE 300 DI 1 NRV-0140; NRV-0130 WEIGHT D
F
42 975mm LONG DOUBLE FLANGE PIPE 150 DI 12 VRV-0171, 0271 VACUUME RELIEF VALVE 100 2 DESIGNS DEPARTMENT F
46 195mm LONG DOUBLE FLANGE PIPE 80 DI 1 Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
47 355mm LONG DOUBLE FLANGE PIPE 80 DI 2
Project Name:
48 90 FLANGED BEND 80 DI 6
CONSTRUCTION OF TERMINAL
MECHANICAL
EQUIPMENT SCHEDULE
49 250mm LONG DOUBLE FLANGE PIPE 80 DI 2
EQUIPMENT TAG NO DESCRIPTION QTY
SEWAGE PUMPING STATION AT
50 3060mm LONG DOUBLE FLANGE PIPE 80 DI 2
DOHA NORTH STW PACKAGE 3
G G
51 2235mm LONG DOUBLE FLANGE PIPE WITH IPF 80 DI 2 P-0140; P-0130;
P-0230; P-0240,
DRY WELL MAIN PUMPS
300 LPS @44.40m HEAD
4 C823/3
52 CONCENTRIC REDUCER 200x100 DI 2 Project Code:
53 3750mm LONG DOUBLE FLANGE PIPE 200 DI 1 PA 2020 C 009 G
DRY WELL MAIN PUMPS Drawing Title:
54 3500mm LONG DOUBLE FLANGE PIPE 200 DI 1 P-0150, P-0250 2 (PHASE 3)
55 90 FLANGED BEND 200 DI 3
300 LPS @44.40m HEAD SHEEHANIYA TERMINAL PS
56 1745mm LONG DOUBLE FLANGE PIPE WITH IPF 200 DI 1
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt
C823-P03-STN-ME-2121 CA
1 2 3 4 5 6 7 8 9 10 11 12
4-Technical Data sheet
PROJECT DATA
SHEET
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS
1 Width 1000 mm
2 Height 1000 mm
E. Invert Line of Opening to Platform Distance
1 IL-PL Refer GA Drawings
Penstock / Sluice Gate Designed Water Head
F.
On-Seat & Off-Seat
1 On-Seat Refer GA Drawings
2 Off-Seat Refer GA Drawings
Corporate background
Operating strategy
REISCO operates in 6 main sub-streams, namely Oil & Gas, Instrumentation, Water
Services, Materials Handling, Civil and Chemicals. These operations are subject to the
overview of qualified and a dedicated service team headed by a Sales Engineer to manage
Oil & Gas production, refining, Petrochemicals, Water distillation & Transmission,
Waste Water Treatment, Power Generation & Transmission, Building Construction and
other Manufacturing Industries.
The end use of products marketed by REISCO have been responsible for execution of
major projects in Qatar with concentrations onto industries Oil, Gas and Water and
Sewage networks.
REISCO endeavours to position itself among other key players in the industry with the
aid of a comprehensive, up-to-date and thorough knowledge base of markets engaged.
Our efforts are reinforced with the aid of a management policy for aggressive pursuit of
an enhanced market share and flexibility in approach to adopt and response to dynamics
of markets and demand conditions.
MISSION:
The following is a highlight on the platter of products on offer from M/s REISCO.
The product range of REISCO caters to the construction industry, water network pipeline,
sewage treatment plants and also the natural gas industry in Qatar. Most of the products
offered by REISCO are sourced for end use in major projects of Qatar.
Supplier chain
Products from this vendor has received approval of KAHRAMAA and Drainage
Department for end use in their projects.
Technical expertise, total market coverage, package supply, timely response and back up
service are considered to be key areas and efforts differentiating the product and service
range on offer from REISCO vis-a-vis it’s competitors. We endeavour to continuously
improve our service delivery channels whilst being concerned to update the production
technology of products available for projects and related standards to uphold
maintenance.
Besides the technically qualified and experienced staff, local partners play a distinctive
role in actively promoting trade operations of REISCO in Qatar.
REISCO plans to branch out and expand it’s market base. Prospect markets in Kuwait
and Oman has attracted REISCO’s specific attention. Client is presently in the process of
entertaining negotiations to venture into the prospect markets with independent profit and
cost centers.
REISCO also contemplates to outsource the supply and installation of their specialized
product range to select subcontractors. They however opt to retain an alternate strategy to
entertain Client orders via direct supplies from main contractor or by RIESCO itself. This
option would require REISCO to initiate their own and independent maintenance unit to
upkeep with the quality of services on offer and improve related business activities with
minimal disruptions. On an overall they expect to streamline related business processes
with the supply department via established active links.
2
Microfine Screens (Static & Automated)
Fine Screens (Step & Drum type)
Coarse Screens (Multi raked & Single raked)
Travelling Band Screens
Suspended Trash rake Screens
Water Hammer Control valves like Zero Velocity & Air
Cushion valves
Knife gate valve as per MSS-SP-81, AWWA C-520
Equipments like Clariflocculators, Flash Mixers,
Degritters, Aerators, Clarifiers, Thickners, Gravity
Decanters, Trickling Filters, Digester Mixers, DAF
Units
Bulk Solids handling valves like Swing valves, Slide
gate valves, Double Flap valves
Hydropower Screw Generator
Archimedean Screw Pumps
Energy Dissipating Valves
3
19. Manpower Details Vice President 1
Sr. General Managers 2
General Managers 2
Asst. General Managers 3
Sr. Managers 9
Managers 3
Dy/Asst Managers 20
Sr. Engineers 11
Engineers 29
Asst. Engineers 22
Others 79
Permanent Worker 209
Temp. Worker & Trainee 230
21. Exporting Countries USA, Canada, Peru, UK, Denmark, Italy, France,
Germany, Turkey, Kazakhstan, Uzbekistan, Iraq, UAE,
Saudi Arabia, Bahrain, Oman, Qatar, Kuwait, Jordan,
Algeria, Sri Lanka, Bangladesh, Thailand, Malaysia,
Singapore, Hong Kong, Vietnam. Detailed reference list
can be downloaded from our website www.jashindia.com
22. Other Details Details like reference list of various equipment, ISO & CE
certificate, 25,000 cycle test certificate, equipment list
etc can be downloaded from our website
www.jashindia.com
4
23. Company photographs Registered Head Office
LD.AMIN •
• DI......mrl
1
D.K.lain (G.M.Flnance) U1/ ACT/01
--
C Ildlil
Anand Dudbe
(Asst.
Manager)
(Asst.Mgr)
U1/ACT/18
...
AnilGothane
(Asst. Manager)
UI/ACT/03
AtuJ Kanungo
(lr.Englneer)
U1/CIV/01
...... ~
1
v......
1
(Executive)
Ul/COM/04
1
Sudblr sharma Madbav
Bbalerao
(Sr.Executive)
~--------------------------------~-----------------------i---------------------1
1I1/Af'T/02
.. ..
1I1/rnM/or;
Prasant Vyas
(Officer)
Ul/ACT/04
• CIIIIIl I Rltesli Godba
(Executive)
U1/ACT/06
Hemant Vlsbwakarma(Executlve)
Excise UI/ACT/09
:
:
\
U1/COM/01 Manesb K Modi
(Asst Manager)
Ul/COM/OZ
...
(Asst.Executive)U 1/COM/ZO
.
MlJindPranjape Kbusbal Cbandra (ExecutiveCustom & VikasMehta Rajesh More Vilendra (Deputy Aadesb Aml\
(Accounts Bagh(Outsource Sbekbar Acct)U1/ACT/19 ,, (DeputyManager) (Engineer) Lasbkari Officer) Namdev Sbrlvastava
Executlve-Casb) d) UI/ACT/O? Sagare ,, U1/COM/06 Ul/COM/ll (Deputy Omcer) U1/COM/21 (Asst (Asst.Supervis
111'ArT/or;
'---,.------' , n· 'r".... ~ ~rlil' .,,;,,....
, .I. ...
l
f:$:1
Yashpal Sudama Narware Abbisbek Sbuka HariOm Gour Manls..,amde Akash ...
Dadhore (Omcer) : (Assistant (Assistant Blrla (Deputy v(Asst Dewanl
(Supervlsotor SEZ ~. Executive) Supervisor) Executive) (Supervisor)
UI/ACT/08 UI/ACT/ll U1/COM/O? Bardari U1/COM/1S U1/COM/16
..
It .
Ul/FDY/Ol
....
'JI
•
aanjay vel' ltv Officer)
Ul/FDY/24
D.W.
Shiwankar(Ass
Sanjay
Venna(Deputy
I Klsbore Somwansbl
(Sr. Engineer) Ul/FDY/13
I V1JayPtas.i:I
NPldu
t, Manager) Officer)Ul/FDY/24 (Qut50lJrQlldj
Ul/FDY/02 ~
1 -+
I La:;:atl ~::~:~.. ... I
I -r
I Melting ~
I I + 0+
Molding Fettllng
Planning
S Shift-II I Shift-I
I Anku~~;Pta
I Shift .1
1
Iishift -Ii
1
I
J. ~
.. ...
Shift -I· I Shift-II
~
Shift -I
-+
I I Shift-II •Shift -I II Shift -II I
SureshC.Bhatt
(Engineer)
,l.
I U1/FDY115 I I~~:;:ra
I -~
Ul/FJ)Y/17
beep.~K·
Malviya
(Supervisor
I$unil Vida"
IU1/FDY/l~
S:njayMulcat
(Asst.Englnee
Ul/FDY/03
I Ul/FDY/06
j
Suyash
Pandey
(Engineer) I •
~:/FDY/ I
+
Satish Sharma
(Supervisor)
Ul/FDY/ll
-+
IDET )
1111/k't"lV 11 A
Pratik Patel
Ul/DSG/Ol
l
Deepak Kothari
l
OJ.Dhurekar
~ ~
(Deputy Manager'
UlIOSG/02
..- (Engineer)
UlIOSG/03
Sashi Kumar (Manager) UI/OSG/16
I (Sr. Engineer'
Ul/OSG/21
I I I 1 .. I
ExpaIt Gates
"
.a ....
.......
Iiatet
Bulk SoIld Valves IPV .. ScrWI
'"
............
ScNw
PumpI
~
VACANT (Assistant
1 1
Panka] Pathak
1
Jltendra
~
Ravindra R.
1
Ravl Mukesh Jain
1
Ul/OSG/08 (Assistant Engineer) Anuj Motghare
Manager) Sharma(Asst Talele Bandhaiva (Engineer)
Ul/OSG/12 (Engineer,
UI/DSG/04 Engineer) .(Engineer' (G.E.T.' Ul/0SG/23
Ul/OSG/25
Ul/OSG/17 Ul/OSG/20 Ul/0SG/22
1 ~ 1
VikramS. Ashlsh
Shruti Thakur Kailash Mandlol Tomar Raghuwanshi
(Engineer) (Engineer) (Jr. Engineer) (Asst Engineer)
UI/OSG/OS Ul/OSG!09 Ul/OSG/13 Ul/OSG/18
I
Hariom Gupta
vACANT Vlkram
Shiv Shankar (Sr. Anil Kumar Patil (Engineer)
(Junior Ahirwar
Supervisor) (Engineer) Ul/OSG/i9 Ul/OSG/24
UI/OSG/06
En,I" .. r) [Sub-Engineer ~
UI/OSG/10 Ul/OSG/14
rttt:A~~
Oivyadarshl Sourabh
Vishwakarma
Chourasla. (Sr. Sharma(Asst: Eo-
(Supervisor)
Supervisor) Supervisor)
Ul/OSG/15
UI/OSG/07 UI/OSG/11
\\tI] \ ~ \.~ ,
~~@
~iVDO«~,..
----
......
j ,
'''UlIla" •. .~...~_.._,..'"....,.~I
Pratik Patel
I
v...."'u~
"
1 1 1 1 1 1 1 ~
North I central
Sales Technical
WEST t EAST SOUllt EXPORT coordinator Services Service
1 + +. ~ + + +
ShashakTlwari-GET- Prashant Tare-Sr. Executive ZH ON chattopadhyay Sr. Nltesh Kawadkar-GET Archit OubeY'(Servlce
Internal sales (West) Manager ZH-(East) Nitin Khatke- Ul/VMK/17 Engg.)
Ul/VMK/03 Ul/VMK/06 Ul/VMK/08 Executive Ul/VMK/18
Ul/VMK/16
UJ/VMKII3 Ul/VMK/15
I I
...
U1/VM~/U4
k-
Harsh"athak
-GET
Internal sales Ul/VMK/09 I UlIVMKIII I~
Ul/VMK/07
Manish Upadhyay-Oy. 1
Manager
'" As South and East zones are far off it is
ZH (North/Central)
U1/VMK/02 decided that these zones will have zonal
~ Mohamed Saleem Ulla- ~ heads based at the zones and they will be
Executive-Bangalore
responsible for business from the zones.
U1/VMK/10 Ul/VMK/12
Ul/VMK/14
~\~ ,_.':i .
• ~
~~
~ I. ~~#
JASH ENGINEERING LIMITED UNIT-I,
Yogesbbolkar
( Sr. Manager)
(Asst. Manager) Kapil Jain
Ul/MKT/06
Ul/MKT/ll (Deputy Manager)
Ul/MKT/15
Gbanshyam
Singh Panwar
(Asst.Engr)
Shashank Jain
Ul/MKT/12 Nitesh Jain
Ankur Agrawal (Asst.Engineer
(Sr.Engineer) ) (Executive)
Ul/MKT/07 Ul/MKT/09 Ul/MKT/26
(Asst.Engineer)
Neeraj Patel
Ul/MKT/08 Ankush Saini
(G.E.T.) (Executive)
Ul/MKT/10 Ul/MKT/27
Pratik Patel
~ +
Abhishek Jain Tamkeen Khan
(Sr.Executive) (Sr.Manager)
Ul/EXP/02 Ul/EXP/04 Ul/EXP/08
I I
+ 1 1
Akash Sadoriya
1"
'"
(Executive) Ul/EXP 107
Vishal Gangwal
(Engineer)
South East Asia Middle Asia & Africa
Ul!EXP!OS
Ul!EXP/03 1 I
Sudeep Zamidar
(Engineer)
UllEXP/ll
UllEXP/09
I 1
Priyesh Upadhvay
Manish Kumar (G.E.T.)
(G.E.T.) Ul/EXP/1O Ul/EXP/12
JASH ENGINEERING LIMITED UNIT-I,
~ Pratik Patel
AshokJain
(Sr. Manager) Ul/HR/Ol
.~ ~.
~ ~
Alok Takalkar R.P. Mishara Rajeev Sharma Satish Kumar Singh
(Asst. Manager) (Sr. Executive) (Assistant (Deputy Officer)
Ul/HR/02 Ul/HR/04 Executive front Ul/HR/06
office)
U1jHR/05
~
\1 Ivt::1
U2/HR/Ol
7-Compliance statement
8-Valid CR copy/ company ID
LICENSE FOR
LOCAL AGENT
><Bar Code
2022/06/04 ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ:
No 1 of 1 ﺻﻔﺤﺔ ﺭﻗﻢ:
ﺭﺧﺼﺔ ﺗﺠﺎﺭﻳﺔ
**51150
2013/06/26 ﺗﺎﺭﻳﺦ ﺍﺻﺪﺍﺭ ﺍﻟﺮﺧﺼﺔ: 51150 ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ:
2023/05/30 ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺮﺧﺼﺔ: ﺍﻟﺮﺍﺋﺪﻩ ﻟﻠﺨﺪﻣﺎﺕ ﺍﻟﻬﻨﺪﺳﻴﻪ ﻭﺍﻟﺼﻨﺎﻋﻴﻪ ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ:
33910 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ: ﺷﺮﻛﺔ ﻧﻮﻉ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ:
ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ:
**33910
5000385419 ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ: 33910 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ:
ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ: ﺍﻟﺮﺍﺋﺪﻩ ﻟﻠﺨﺪﻣﺎﺕ ﺍﻟﻬﻨﺪﺳﻴﻪ ﻭﺍﻟﺼﻨﺎﻋﻴﻪ ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ:
01/10/2023 ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ: 03/10/2006 ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ:
200000 ﺭﺍﺱ ﺍﻟﻤﺎﻝ: ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ:
ﻗﻄﺮ ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ: ﻧﺸﻂ ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ:
1 ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ:
ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ
+974877555 ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ: 24875 ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ:
ﺍﻟﺸﺮﻛﺎﺀ
Page 1 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 33910 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
><Bar Code
ﺍﻟﻔﺮﻭﻉ
ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ
Page 2 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 33910 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
27/08/2020
The General Tax Authority of Qatar certifies that the ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﻀﺮاﺋﺐ ﻓﻲ دوﻟﺔ ﻗﻄﺮ أن
entity is registered as per the following details: :اﻟﺠﻬﺔ أدﻧﺎه ﻣﺴﺠﻠﺔ ﺣﺴﺐ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ
INTRODUCTION:
This manual describes recommended methods of handling and storage and safety of JASH equipment at site
before installation.
During manufacture and assembly, great care is taken to ensure (joints) flatness of mating seat facings on the
gate frame and shutter in gate fully closed position. Unless the gate is carefully installed free from distortion,
maintaining (joints) flatness of mating seat facings on the gate frame and shutter as ensured at factory, the
gate will leak excessively.
JASH equipment are custom made equipment, comprising of many parts, components and accessories viz.
Gate assembly: comprising of frame, shutter, logs, lifting beam, side and top - bottom wedges etc, Wall
thimble and Lifting mechanism: comprising of operating headstock, lifting rod/spindle/stem, coupling, stem
guide bracket, etc. Being custom equipment made to order on an individual basis, complete inter-changeability
of all parts is not possible and hence replacements and fitments, if necessary involve substantial time and
delays. It is, therefore, essential that the equipment is carefully handled during transit, unloading, storage and
installation to avoid damage and it should be ensured that no pilferage of components take place. All
components are tagged to identify their respective gate/log as per the gate tag number / serial number etc.
inspected and certified complete at our factory before packing and shipment.
This manual furnishes information and procedures only as a recommendation for the proper handling, storage,
of JASH equipment. Technical details, data and sketches given in this manual are of a general nature and may
vary from the exact equipment supplied due to project specific requirements or due to the constant learning
and upgrading. JASH endeavor’s to be the leader in our field and tries to keep our products and designs the
best available.
JASH assumes no liability expressed or implied for the interpretation of this instruction manual or the faulty
handling, storage, installation or commissioning of the gates supplied. Responsibility of JASH is restricted to
manufacturing defects only and does not extend to improper installation, adjustments and related problems
subsequent to manufacturing.
While taking delivery from the Carriers, before unloading packing cases / material from the vehicle, check
the packing cases for apparent damage from outside during transit. Also check unpacked or partially packed
items, if any, for damage or pilferage during transit. In case of any damage or shortage, obtain carrier’s
certificate at the time of taking delivery and report to the Manufacturer and the Insurer immediately.
Before commencement of unloading verify the weight of the packing cases / material for proper selection of
lifting equipment. This can be done by checking the weight of packing cases / material from the packing list.
In case this information is not available or in case there is any confusion on this matter then contact!
Manufacturer immediately, to know the weight or to clarify the doubts.
The lifting capacity of slings, chains, tackles, hoist, crane etc to be used for unloading and subsequent handling
should be atleast 50% more than the weight of the heaviest packing case / material to be handled, and
remember any excessive out-reach could cause dangerous problems.
Before commencement of unloading also ensure that a leveled, firm and compacted elevated platform
approximately 300 mm (12”) higher than the surrounding area {refer figure ( b )} is ready for keeping
unloaded packing cases / material. The floor area of this platform should be 2 times the floor area of all the
packing cases / material to be unloaded.
Always sling the cases and heavier parts while unloading. Do not drop the cases and the parts on floor from a
height. Do not lift/lower any case containing gate assembly on to its sides and do not put it upside down. Refer
to instructions shown on the packing case showing where the slings should be used, which side the material
is up and how to store the boxes. Refer figure (a) above to understand how to handle packing cases. DO NOT
WALK UNDER RAISED PACKING CRATES!
Open the cases immediately on unloading / receipt and check for any damage or pilferage during
transportation. Take care to see that no parts are damaged while opening the cases. Check the consignment
according to packing list enclosed. Report any shortages or complaints to the Manufacturer and the Insurer
immediately.
The Gate should be carefully handled with proper lifting tackles and slings to avoid injury to persons, breakage
and damage to the gate assembly and its components and other parts and accessories. During storage the
equipment should be placed on wooden planks (not spaced more than 600 mm (24”) over an even compacted
surface so as to keep them off the ground and prevent bending and distortion. Refer figure (b) above.
Ferrous contamination, if any, taking place in our plant during manufacturing is eliminated by pickling and
passivation of all stainless steel items before packing and dispatch. To avoid ferrous contamination of stainless
steel components at site please ensure that no stainless steel items come in direct contact with chains and
handling accessories made of carbon steel, as this results into ferrous pickup / contamination and subsequent
corrosion on stainless steel items in places which have come in contact with carbon steel. JASH will not be
held responsible for ferrous contamination of stainless steel items taking place at site due to handling and
storage in improper manner.
Stacking of large and heavy gates should be avoided as far as possible. If gates are sent stacked from the
factory then no further material should be stored over this stack after unloading. In case where storage space
is limited for the number of gates involved and if stacking is badly necessary it should be limited to only four
gates and heavy wooden planks of even thickness should be placed in between the gates to prevent damage
to the stacked gates. If gates are sent stacked from the factory then no further material should be kept
over this stack after unloading.
Gate assembly, lifting rod and lifting mechanisms have precisely machined and finished surfaces and hence
should be protected from damage during handling as well as storage.
Main gate assembly comprises of gate frame fitted with shutter in its guides. This assembly is factory
assembled and tested and hence should not be dismantled or disturbed. The shutter is locked in position
at its top with the help of lock plates / transit stop (painted red) bolted to the frame. These lock plates prevent
the vertical movement of shutter in the frame. Lock plates / transit stop should not be removed until the gate
is installed and is to be initially operated. Refer figure ( c ) above to understand location of transit stop / lock
plate.
Shutter should never be taken out from the frame during handling, storage or installation. Adjustment of
wedge block bolts, when provided should not be disturbed. Care should be taken to avoid damage to the
wedges and wedge adjustment bolts while slinging and handling.
Utmost care should be taken to avoid bending of lifting rods (spindle) while handling. The threaded portion
of a spindle is applied with grease and is wrapped with thin polyethylene sheet and Hessian cloth wrapped
and tied over it. The threads should be checked for any damage during transit. They should remain greased
and should be kept wrapped up as described above until the spindle is needed for installation.
The spindle of self-contained / closed top frame gates {refer figure (m) to understand what is a self-contained
/ closed top frame gate} are sent assembled on to the gate assembly.
Spindles of gates which are not self-contained type / open top frame gates {refer figure ( o ) to understand
what is a non self- contained / open top frame gate} are sent separately. Whether a gate is self-contained /
closed top frame or not self-contained / open top frame can be verified from the respective approved GA
drawing.
Ample care should be taken to protect the threading on lifting rods for the ends to be connected with
couplings, if any.
Rod coupling, when supplied are threaded and pinned on the end of lifting rod and are ready to be fitted
with the threaded end of other rod to be coupled. Ensure that the pins on couplings do not get loosened
and lost.
Stop Nut is kept threaded on to the spindle threads and is kept fixed with a set screw. Ensure that it does
not get loosened and lost.
Spindles or lifting rods should be supported over their entire length with a view to prevent bending. They
should be carefully stored on even surfaces off the ground and in a clean and dry area.
During storage care should be taken to cover the equipment to protect seat facings, seals and other machined
surfaces from scratches, dents, rusting etc. and from other foreign matter. The cover should be of material,
which is resistant to water and should cover the entire case from top to bottom.
Packing cases containing operating mechanism (manual operating headstocks / electric actuators / pneumatic
actuators etc) and small parts and anchor bolts / fasteners should be preferably kept in store room to prevent
damage from environmental causes like dirt, dust, sunlight and rain and also with a view to prevent chances
of pilferage.
In case of any doubt pertaining to handling/storage of supplied material refer to the manufacturer.
WARNING:
Follow appropriate safety measures/laws and working conditions as applicable for your project or as
applicable in your Country while unloading, handling, installation and commissioning of this
equipment. Take due care to avoid ferrous contamination on stainless steel items while handling,
storage and installation of supplied products.
JASH assumes no liability for accidents or damages taking place during the process of handling,
storage, installation or commissioning of the gates supplied.
--------------------------------------------------------------------------------------------------------------------------
INSPECTION TEST
PLAN
QUALITY ASSURANCE PLAN
NOTE: –
1. We reserve our right to conduct check test at external lab if the test certificate not provided by vendor.
2. Equivalent material grades of EN/ASTM standard ,shall be used for fabrication
3. Movement test can be carried out on Test bench or shop floor - with dummy or lifting beam under supply.
4. We do not undertake to conduct additional testing other than those stated above.
5. If Client / Representative / Inspection Agency - need to witness the shop test - The quantum will be one per lot
per type.& size.
6. Height restriction on test bench for leakage test 2000 mm max.
LEGENDS – P : Perform R : Review W : Witness J: JASH C : Client T : Third party inspection Agency
Amit Paul
Prepared By: Jash Approved By: Rohit RATHI
CLIENT: SAMPLE
-0-
INSTALLATION, OPERATION AND MAINTENANCE
MANUAL FOR SIDE WALL EMBEDDED
‘JASH’ STOPLOGS
INDEX
4. OPERATION OF STOPLOGS 12 – 17
6. TROUBLE SHOOTING 20 – 21
-1-
INSTRUCTION MANUAL FOR JASH STOPLOGS
INTRODUCTION:
This manual describes recommended methods of handling and storage, installation, initial operation,
precautions for maintenance and safety of JASH Stoplogs (Stainless steel / Carbon steel / Aluminum
/ Composite).
During manufacture and assembly, great care is taken to ensure (joint) flatness of mating sealing
faces on the stoplog frame and sectional logs. Unless the stoplog is carefully installed free from
distortion, maintaining (joint) flatness of mating sealing faces on the stoplog frame and sectional
logs as inspected and tested at our factory, the stoplogs will leak excessively.
A stoplog is custom made equipment comprising of a number of parts, components and accessories
viz. stoplog frame, sectional stoplogs, sealing arrangement, lifting beam etc. Being custom
equipment made to order on an individual basis, complete inter-changeability of all parts is not
possible and hence replacements and fitments, if necessary involve substantial time and delays. It is,
therefore, essential that the equipment is carefully handled during transit, unloading, storage and
installation to avoid damage and it should be ensured that no pilferage of components take place. All
components are tagged to identify their respective assembly as per the stoplog tag number / serial
number, etc. inspected and certified complete at our factory before packing and shipment.
This manual furnishes information and procedures only as a recommendation for the proper
handling, storage and installation of JASH Stoplogs. Technical details, figures and sketches given in
this manual are of general nature and may vary from the exact equipment supplied due to project
specific requirement or due to constant upgradation in product design.
JASH assumes no liability expressed or implied for the interpretation of this instruction manual or
the faulty handling, storage, installation or commissioning of the supplied products. Responsibility
of JASH is restricted to manufacturing defects only and does not extend to improper installation,
adjustments and related problems subsequent to manufacturing.
While taking delivery from the Carriers, before unloading packing cases / material from the vehicle,
check the packing cases for apparent damage from outside during transit. Also check unpacked or
partially packed items, if any, for damage or pilferage during transit. In case of any damage or
shortage, obtain carrier’s certificate at the time of taking delivery and report to the Manufacturer
and the Insurer immediately.
Before commencement of unloading verify the weight of the packing cases / material for proper
selection of lifting equipment. This can be done by checking the weight of packing cases / material
from the packing list. In case this information is not available or in case there is any confusion on
this matter then contact! the manufacturer immediately to know the weight or to clarify the doubts.
The lifting capacity of slings, chains, tackles, hoist, crane etc. to be used for unloading and
subsequent handling should be atleast 50% more than the weight of the heaviest packing case /
material to be handled, and remember any excessive out-reach could cause dangerous problems.
-2-
Before commencement of unloading also ensure that a leveled, firm and compacted elevated
platform approximately 300 mm (12”) higher than the surrounding area {refer figure ( b )} is ready
for keeping unloaded packing cases / material. The floor area of this platform should be 2 times the
floor area of all the packing cases / material to be unloaded.
Always sling the cases and heavier parts while unloading. Do not drop the cases and the parts on
floor from a height. Do not lower the case containing stoplog assembly on to its sides and do not put
it upside down. Refer to instructions shown on the packing case showing where the slings should be
used, which side the material is up and how to store the boxes. Refer figure ( a ) above to understand
how to handle packing cases. DO NOT WALK UNDER RAISED PACKING CRATES!
Open the cases immediately on unloading / receipt and check for any damage or pilferage during
transportation. Take care to see that no parts are damaged while opening the cases. Check the
consignment according to packing list enclosed. Report any shortages; or complaints to the
Manufacturer and the Insurer immediately.
The Stoplog should be carefully handled with proper lifting tackle and slings to avoid injury to
persons, breakage and or damage to the stop log assembly and its components and other parts and
accessories. During storage the equipment should be placed on wooden planks (not spaced more
than 600 mm (24”) apart) over an even compacted surface so as to keep them off the ground and
prevent bending and distortion. Refer figure ( b ) above.
Ferrous contamination, if any, taking place in our factory during manufacturing is eliminated by
pickling and passivation of all stainless steel items before packing and dispatch. To avoid ferrous
contamination of stainless steel components at site please ensure that no stainless steel items come in
direct contact with chains and handling accessories made of carbon steel as this results into ferrous
pickup / contamination and subsequent corrosion on stainless steel items in places which have come
in contact with carbon steel. Jash will not be held responsible for ferrous contamination of stainless
steel items taking place at site due to handling and storage in an improper manner.
-3-
Stacking of large and heavy stoplogs should be avoided as much as possible. If stoplogs are sent
stacked from the factory then no further material should be stored over this stack after unloading.
Stoplog assembly and lifting beams have precisely machined and finished surfaces and hence should
be protected from damage during handling as well as storage.
Utmost care should be taken to avoid bending of stoplog frame, sectional logs and lifting beam while
handling. They should be carefully stored on even surfaces off the ground and in a clean and dry
area. During storage, care should be taken to cover the equipment to protect seat facings, seals and
other machined surfaces from scratches, dents, rusting etc. and from other foreign matter. The tarp
cover should be of a material which is resistant to water and should cover the entire case from top to
bottom.
Packing cases containing operating mechanism, small parts and anchor bolts / fasteners should be
preferably kept in a store room to prevent damage from environmental causes like dirt, dust,
sunlight, rain and also with a view to prevent chances of pilferage.
In case of any doubt pertaining to handling / storage of supplied material refer to the manufacturer.
WARNING:
Follow appropriate safety measures / laws and working conditions as applicable for your
project or as applicable in your Country while unloading, handling, installation and
commissioning of this equipment. Take due care to avoid ferrous contamination on stainless
steel items while handling, storage and installation of supplied products.
JASH assumes no liability for accidents or damages taking place during the process of
handling, storage, installation or commissioning of the equipment supplied.
-------------------------------------------------------------------------------------------------------------------------
-4-
INSTALLATION PROCEDURE FOR STOPLOG FRAMES
Verify from the manufacturers drawing whether the stop log frame assembly is multi-piece bolted
construction or single piece welded construction. Multi-piece bolted construction is provided when
the length of frame is longer or when the width of stoplog is more than 2200 mm (86”) or when the
stoplog frame is to be air freighted for urgent delivery.
If the stoplog frame assembly is multi-piece construction then the two vertical side members would
be in multi-piece bolted construction and are delivered to be bolted to the bottom sill member.
If the stoplog frame assembly is a single piece construction then the two vertical side members
would be in single piece and are delivered welded / bolted to the bottom sill member.
Based on whether the stop log frame is in multi-piece construction or single piece construction
minor changes in installation procedure has to be carried out as detailed herein under.
Before commencement of installation, check the site civil conditions for correctness of all
dimensions as shown in the GA Drawing / Civil Block out drawing furnished by JASH for the
stoplog being installed. Specially check whether the invert level of stoplog opening and invert of
platform is as per drawing, check whether the size of the opening for wall mounting stoplog or
whether the groove provided in parallel side walls or distance between the parallel walls and groove
provided in bottom for flush bottom stoplog is of the correct size and depth.
Also specifically check whether enough gap is available between civil structure and lifting pin of
stoplog to enable interference free movement of the stoplogs and lifting arrangement after
installation. Check for the sufficient head room space to be available above the installation area at
the site for proper handling and movement of the frames.
Proceed only if all the dimensions are CORRECT or else first rectify the civil mistakes so that there
are no subsequent problems.
1. Before the stoplog is taken up for installation, check for the correctness of civil works. Check
that the grooves / recesses as shown in the GA drawing are made in the sidewalls and bottom
floor of the channel. It should be ensured that the grooves provided on the sidewalls are parallel
to each other and square with respect to bottom of channel. Also check the distance between the
bottom of channel to the top of the operating platform. If any discrepancy is observed then
suitable corrections should be carried out before proceeding further. Refer to figure ( c1 & c2 )
below showing cross section of stoplog frame embedded in grooves in side walls.
In case a slab is used to cover the channel then check whether sufficient clearance is available in
the opening provided in the slab for insertion and removal of stoplogs. Ideally the opening
provided in the slabs should be wider by 400 mm than the width of opening provided on the wall
for stoplog and at least 400 mm across to enable in and out movement of stoplog with lifting
beam.
-5-
Figure (c1)
2. If everything is as required then ensure that the groove faces of the first stage grout are
roughened for better adhesion with the second stage grout.
3. If the frames are supplied in multiple pieces than follow the procedure as explained at the end of
this section (B).
Figure (c2)
-6-
4. In case of single-piece frame, lift the stoplog frame assembly comprising of two side vertical
members and bottom sill member and then carefully lower the assembly into the grooves of the
sidewall.
If frame height is more than 3 meters then it is possible that frames are supplied in multiple
pieces / segments for ease in transportation and ease at site handling.
In case of a multi-piece frame, remove the bottom most frame segments {Segment I (Right) and I
(Left)} from the packing and check their correctness as per the drawing. Thereafter pre-assemble
the bottom sill member with 1st segment of vertical side members (Left side as well as Right
side). The vertical side segments and bottom sill members are marked for ease in identification
and assembly.
After the side segments are bolted and dowelled to the bottom sill member, tie the top end of the
side segments using a removable tie bar (painted red) on to the top of vertical 1st segment. Refer
figure ( d ) showing use of tie bar in installation of frame. Lift this assembled 1st segment frame
and put in place in the groove.
Figure (d)
5. After fully lowering the frame assembly in the groove ensures that the bottom sill is flush with
the floor of channel. Also ensure that the side guides of the frame are at an equal distance from
the face of the side walls of the channels.
Figure (e1)
-7-
Figure (e2)
6. Check the horizontal plane of the entire face of the bottom sill using straight edge / bubble level
and if the plane is not correct then use the 6 nos. M10 tapped holes given on the bottom sill to
bring the sill in plane. Refer to figure ( e1 & e2 ) above showing cross section of bottom member
for Stainless steel frame & Aluminum frames and leveling provision on this member. For jacking
the sill member use temporary M10 bolts (not provided by us) which should be flushed by
cutting or grinding with the surface after grouting in case these are projecting above the channel
invert. The entire face of the bottom sill should be in a perfect horizontal plane to minimize the
leakage from between the bottom sill face and the bottom seal of log no. 1.
Figure (f1)
Figure (f2)
-8-
7. Check the vertical plane of the entire face of the side members using bubble level and if the
plane is not correct then use the M10 tapped holes given on the vertical side members to bring
the vertical side members in vertical plane. Refer to figure ( f1 & f2 ) above showing cross
section of vertical side member for Stainless steel frame & Aluminum frame and leveling
provision on this member. For jacking the vertical side member use temporary M10 bolts (not
provided by us).
8. Generally during manufacturing of aluminum stoplogs the clearance between the frame and the
log segments is maintained 4 mm minimum on each side & 8 mm maximum on each side. In
case of Stainless steel / Composite stoplogs this gap is maintained 8 mm minimum on each side
& 12 mm maximum on each side depending upon the log width and overall height of the frame.
Check GA drawing to see the exact clearance provided in your ordered stoplogs. While installing
the frame ensure that the entire frame height is in plumb within 2 mm from top to bottom so as to
avoid any interference during log up and down movement.
9. In case of stoplogs provided with frame mounted side seals, the side rubber seal is kept 1 to 2
mm longer than the frame segment length. During installation this side seal should be suitably
sized by carefully cutting and matched with the corresponding side seal mounted on the lower
frame portion so that no gap exists at the joint in the seal. This joint should then be glued
together using adhesive (like Loctite-495 or similar adhesive) so as to offer a continuous joint
free seal from bottom to top of frame.
10. Once the entire frame assembly is placed in position then after thoroughly cleaning the stoplog
frame assembly, unpack the stoplogs and clean them from any dirt / dust which may have
entered the packing. Thoroughly clean the mating faces of stoplogs which will come in contact
with sealing arrangement in the frame assembly.
11. Now bring a log segment and move it within the frame from top to bottom to check for
interference free smooth movement. This should be done a few times to verify correctness of
frame position. For this check, the log can either be manually handled or handled using a lifting
beam, if provided. To understand the procedure for use of lifting beam refer to “Operation of
Stoplogs” given later in this manual.
12. If interference free smooth movement from top to bottom of log frame is not observed then it
means that frame position needs to be corrected.
13. Check the squareness between the bottom sill and side segments of frame, check the plumb of
the side segments and also the distance between the side segments.
14. Once interference free movement is achieved then only proceed with the grouting.
15. Shutter up the gap between the side walls and either sides of the side frame segments along the
two vertical walls of the channel and on either side of the bottom sill and the floor of the channel.
16. Carefully pour high precision, non-shrink, quick setting fluid grout in the gaps between the
groove and stoplog frame ensuring that the gap is totally filled. While pouring the grout ensure
that no grout goes inside C-portion of the side segments where rubber seals are mounted. Allow
grout to cure thoroughly, usually allowing at least six clear days for proper curing. Clean off any
excess grout material.
-9-
In case of a multi-piece frame, grouting on sides should not be done up to the top end of the side
segments. A distance of at least 300 mm (12”) from the top end of the side segment should be
left un-grouted to enable removal of tie bar and fitment of subsequent side segment number II.
17. After the grout is set, remove the tie bar (painted red) fixed to the top of side segments no. I and
also remove all the bracing support flats as well as the shuttering.
18. Recheck the plumb and alignment of the grouted segments to confirm that the initial setting is
correct. If it is observed that the plumb and alignment got disturbed during grouting then break
open the fresh concrete to remove the segments. Thereafter once again carry out the above
mentioned procedure and get the correct installation of segments.
19. If the setting is correct allow sufficient days for the grout to cure thoroughly.
With the above procedure, installation of single-piece frame in grooves provided in wall is complete.
-------------------------------------------------------------------------------------------------------------------------
However for multi-piece frame of stoplog following additional processes needs to be carried out.
1. Commence with the next stage of installation in which side segments no. II (L&R) are to be
mounted on the grouted side segments no. I (L&R).
2. For this remove the side segments no. II from its packing box and check their correctness from
the drawing.
3. Thereafter fasten side segments no. II (L&R) on top of side segment no. I (L&R) ensuring that
tongue and groove are properly seated. In case of stoplogs provided with frame mounted side
seals, the side rubber seal is kept 1 to 2 mm longer than the frame segment length. During
installation this side seal should be suitably sized by carefully cutting and matched with the
corresponding side seal mounted on the lower frame portion so that no gap exists at the joint in
the seal. This joint should then be glued together using adhesive so as to offer a continuous joint
free seal from bottom to top of frame.
4. After the side segments are bolted up, tie the top ends of the right and left side segments no. II
using the tie bar (painted red).
5. Check the plumb of the side segments no. II as well as the distance between the side segments.
7. Follow the procedure described above for fastening all the balance side segments over each
other.
8. Once all the side segments i.e. from segments I (L&R) to segments topmost segment are grouted
then check for correctness of alignment and verticality of all the segments.
9. Clean all the segments from any concrete or grout adhering to it.
- 10 -
10. Remove the masking tape from the sealing face of the rubber seal and clean the rubber seal.
With the above procedure installation of multi-piece frame in grooves provided in wall is complete.
-----------------------------------------------------------------------------------------------------------------------
WARNING:
Each stoplog assembly is tested for non-acceptance of 0.1 mm thick feeler gauge between mating
sealing faces of sectional stoplogs and stoplog frame before dispatch from plant. Stoplogs are
dispatched only when they meet the seal clearance criteria specified in applicable standard /
specification and as accepted by JASH during the finalization of order. Improper installation
may result into deterioration in stop log seal clearance criteria and thereby affect leakage
performance for which JASH cannot be held responsible.
Hence JASH assumes no liability for leakage performance and interference free movement
of stoplogs if the entire installation has not been done under the supervision of a competent
Engineer following JASH instructions.
-----------------------------------------------------------------------------------------------------------------------
- 11 -
OPERATION OF STOPLOGS
The supplied stoplogs can be lifted or lowered in its frame by (A) using mechanized hoisting
arrangement and a Lifting Beam, or (B) manually using Lifting Rods. Please verify from the
approved GA drawing the type of arrangement offered for lifting / lowering of stoplog in the
stoplog frame. After ascertaining this, follow the installation procedure (A) or (B) as given
hereunder.
To check whether the stoplog frame assembly is correctly installed and to check for unobstructed
and smooth operation of sectional stoplogs in frame assembly, the first stoplog should be lowered
from top to bottom and then lifted back from bottom to top a few times using lifting beam. Adopt the
procedure as given below for this:
1. Pickup the lifting beam using a hoist / crane provided for this purpose.
2. Bring lifting beam above the log placed on the floor / storage rack and lower it on the log so
as to engage the hook provided on lifting beam with the log pins. Refer figure ( g ).
Figure (g)
3. When the lower tapered portion of the hook touches the lifting pin of the log, the hook
assembly moves apart and allows it to engage with the stoplog pins. Hence engagement of
lifting beam to log is automatic. Refer figure ( k ).
Figure (k)
- 12 -
4. Once this is done, the stoplog can be lifted along with the lifting beam. Take the lifting beam
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l1 ) to understand the sealing arrangement provided on sides and bottom in
case of frame mounted seals.
Figure (l1)
Refer figure ( l2 ) to understand the sealing arrangement provided on sides and bottom in
case of log mounted seals.
Figure (l2)
5. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
- 13 -
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.
6. Subsequently raise the stoplog along with the lifting beam till the top of the frame assembly
while simultaneously checking for non-acceptance of 0.1 mm thick feeler gauge between
mating sealing faces of sectional stoplogs and stoplog frame at various points
7. Once all the checks as well as down and upwards movements are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs. To do this the first
stoplog has to be re-lowered to the bottom most position.
Figure (m)
8. When the log reaches the bottom most position then further lowering of the lifting beam will
allow the hooks to go below the pins of the log. To take the hook away from the pin and
disengage the lifting beam from the log, pull the nylon rope provided at the center of the
lifting beam. Refer figure ( m ).
9. Keeping the nylon rope taut, lift the lifting beam using the hoist.
10. Remove the lifting beam from the frame assembly and engage it with the subsequent log.
11. Repeat the procedure 2 to 10 for further installation of logs into the frame.
12. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.
The lifting rod pickup arrangement is suitable where the log weight is low, the log width is less
and the installation depth is less i.e. in all those cases where the logs can be easily lifted
manually. The lifting rod arrangement are of two types (i) suitable for engaging with lifting pins
provided on sides of the stoplogs, (ii) suitable for engaging with dovetail slot provided on top of
the logs. (Only in case of Aluminum Logs)
Depending upon the type of lifting rod arrangement provided follow any of two procedures
given hereunder :
- 14 -
(i) Using lifting rod suitable for engaging with lifting pins provided on sides of the stoplogs :
1. Bring the lifting rods above the log placed on the floor and lower it on the log so as to engage
the hook provided on lifting rod with the log pins. Refer figure ( n ).
Figure (n)
2. Once this is done the stoplog can be lifted along with the lifting rods. Take the lifting rods
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l ) to understand the sealing arrangement provided on sides and bottom.
3. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.
4. Subsequently raise the stoplog till the top of the frame assembly while simultaneously
checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing faces of
sectional stoplogs and stoplog frame at various points.
5. Once all the checks as well as down and upward movement are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs.
6. Repeat the procedure 1 to 5 for further installation of logs into the frame.
7. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.
(ii) Using lifting rod suitable for engaging with dovetail slot provided on top of the stoplogs :
- 15 -
1. Bring the lifting rods above the log placed on the floor and engage them with the log. To
engage, insert the lifting rod in to the dovetail slot provided on the top of the log by keeping
the lifting rod in position as shown in figure ( o ). Thereafter rotate the lifting rod by 90°.
This will allow the rod to get engaged with the dovetail slot of the log. Refer figure ( p ).
Figure (o)
2. Once this is done the stoplog can be lifted alongwith the lifting rods. Take the lifting rods
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l1 & l2 ) to understand the sealing arrangement provided.
Figure (p)
3. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.
4. Subsequently raise the stoplog till the top of the frame assembly while simultaneously
checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing faces of
sectional stoplogs and stoplog frame at various points.
5. Once all the checks as well as down and upward movements are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs.
6. To disengage lifting rod from the stoplog rotate the lifting rod by 90° and pull the rods out of
stoplog dovetail slot.
- 16 -
7. Repeat the procedure 1 to 6 for further installation of logs into the frame.
8. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.
---------------------------------------------------------------------------------------------------------------------
- 17 -
MAINTENANCE INSTRUCTIONS:
“DO’S”
1. Before Stoplogs are put into regular service or after being left in storage for considerable length
of time, each stop log should be raised and all foreign matter carefully removed from the mating
sealing faces on stop log sides as well as on the top. Also the sealing face of the bottom seals
should be cleaned and checked for damage if any during storage.
2. The nuts of all constructional and foundation bolts should be checked for tightness every twelve
months.
3. If the stoplogs are installed in situations where debris or foreign matter can build up then it is
recommended that the stop log frame grooves be periodically cleaned out of any debris so that
when the stoplogs are to be inserted in an emergency the operator faces minimum problems.
4. The protective paint on all painted items should be examined every six months for signs of
damage.
5. ALL LIFTING EQUIPMENT, lifting beams, lifting poles, lifting slings, shackles etc. must be re
tested in accordance with in Country standards for this type of equipment. ALWAYS wash off
with clean water after use, grease moving parts and CHECK for any visually check for damage.
6. MAKE SURE! The surrounding access area around any stop log frame, log insertion point is free
from clutter; one small mistake can injure or cause a life threatening event.
7. Treat this equipment with respect and it will perform to your expectations.
- 18 -
“DON’TS”
“DON’TS”
1. Do not store stoplogs in a way that these are exposed to sunlight as this would reduce the age of
the log seals.
2. Do not store stoplogs in a way that they get twisted over prolonged storage periods.
3. Do not store stoplogs in a way that the invert seals or side seals (if provided) remain
continuously pressed as this would reduce the effectiveness of the log invert seals.
4. Do not sling or handle the stoplogs, while transporting from storage to installation site or from
installation site to storage area, in a way that the log invert seals or the mating sealing area on
sides of logs gets damaged by slings or tackles used in handling.
5. NEVER use stoplogs designed for another application in a different location, they may be under
designed for that application.
-------------------------------------------------------------------------------------------------------------------------
- 19 -
TROUBLE SHOOTING AT SITE
There are a number of problems that can arise with stoplogs at site. We are giving some of these
problems and the methods of repair. Hence before requesting a site visit of the manufacturer’s
representative, the contractor should check the problem faced and carryout trouble shooting as
per guidance given hereunder.
Jash stoplogs are supplied duly factory tested for movement. Hence if movement problem is
encountered then possibly it is outcome of faulty installation at site. JASH cannot be held
responsible for any faulty installation by client / contractor. The reasons attributing for this problem
are as under
Before final installation of the frame & pouring the second stage grout, checking for the interference
free movement of the stoplog in the frame is most important activity. If the interference free
movement is not observed at that point then do rectify this as at a later stage this becomes a very
laborious work. Once this problem is observed then verify where the movement of stoplog is
affected. Check as to whether any adjustment in frame can be done in this area. If no adjustment can
be done then only option is left is to remove the installed frame and reinstall strictly in line with
procedure given under chapter “INSTALLATION PROCEDURE FOR STOPLOG FRAMES”.
(B) Leakage:
Leakage is the problem that is most often encountered. However some leakage is permissible for this
product and hence do not expect zero leakage. Hence before requesting a site visit, the contractor
should check the quantum of leakage. Please verify the permissible leakage norms as per the
standard / technical specifications against which the supply is made or verify from QAP /
contract documents the agreed permissible leakage norms. If the leakage is observed to be
within permissible limits then there is no need for a site visit.
Leakage at site is mostly a result of improper erection (installation) or damage to the sealing
arrangement. If the erection has been done correctly, without twisting and distorting the frame or
face wall anchored stoplogs and if the sealing arrangement is not damaged then excessive leakage is
generally not observed.
If the leakage is way above the permissible limits then the contractor should carry out further checks
as follows:
1. Check for any damage to sealing arrangement. If seals are found damaged then replace them.
2. In case of multipiece stoplogs when seal joints of frame mounted side seals are not correctly
joined and glued then there is fair possibility of leakage from this joint. Under sized cutting
of side seals at joint can result into gap in the seal leading to leakage and over size cutting of
- 20 -
side seals at joint can result in to bulging of seals also leading to leakage. Undersized cut seal
joints have to be replaced and oversized cut seal joint has to be recut properly.
3. Check for concrete or paint or other foreign substance on the sealing area. It is not difficult to
get paint or foreign substance on the sealing area even in the shop and hence in the field it is
very difficult to prevent paint, concrete or other foreign substance from getting on to the
sealing area. This can happen during installation of stoplogs or while carrying out subsequent
civil work around the stoplogs installation, and during carrying out painting after installation
of the stoplogs.
First remove the stoplogs and check the mating sealing area on the stoplogs. If there is paint
or other foreign substance on the sealing faces of frame and logs then this should be cleaned
by scraping and removing the same without damaging the surfaces.
4. Leakage from the bottom sill area at channel invert can be on account of collection of
concrete or asphalt on the top of bottom sill member on which the bottom most stop log rests.
The solution is to scrape and remove this foreign material without damaging the seal while
doing so. To do so the stoplogs have to be lifted for access to top portion of bottom sill
member.
1. The stoplogs will not close all the way. The most obvious problem would be an obstruction
beneath the stop log at the invert level due to debris. Hence cleaning of this debris is required
to be done to enable the stop log to close.
2. Difficulty in lowering or lifting stoplogs or jamming of stoplogs in the grooves during lifting
or lowering is encountered. This is mostly on account of improper balancing of stop log
lifting arrangement resulting into unbalanced movement of stoplogs in grooves.
_________________________________________________________________________________
END OF MANUAL
- 21 -
10-Country of Origin
COUNTRY OF
ORIGIN
(SAMPLE)
1. Goods consigned from (Exporter's business name, address. country)
*"""::;,o&l=LJo[,E,*
JASH ENGINEERING LIMII I D I
(NON PREFERENTIAL)
Plot No. M-19, lndore Special Icorrorrric Zo{c, (Combined Declaration and Certificate)
Phase-tl, Misc. Zorte, Pithampur-'1i;d77'j lssued in lndia
Madhya Pradesh lndia I
GSTIN:23AAACJ7699F3ZA I
I
Chamber of Commerce
Email:Chetlran.Noronha@alraida.conr I Patharia Palace, 75, Mohammedali Road,
MUMBAI - 400 003. (rNDrA)
fel:2342 1109 . Fax:2341 3661
E-mail : info@memonchamber.com
3. Means of transport and route (as far as known)- 4. For Otficial use
RY S[A
Port of Loatlinn: l(HAVA Sl'IEVA ll'lDlA
PoIt of Dis(lrarge: 'D0llA,QAlAit
5. ltem 6. Marks and 7. Number and kird of packages, 8. Origin . Gross weight 10. Number and
No. numbers of description rf goods criteria or other quantity date of invoices
packages
02 PACKAGE I
V
It is hereby certified,on the basis of control carriecl out, that the declaration by the I The undersig ned hereby declares that the
M
exporter is correct I above details and statements are correct and
r
ffi l:
I
I lmporting Co ;id,
Customer: -
Consultant: -
PO No: REISCO-JAS/21/011-120
Product: SS FRAME 1000 {W) x 1550 {H) , STOP LOG SHUTTER 1134 {W) x 334 {H)
040/20-21
3 EPDM ASTM D2000 Rubber Seal 02
201/21-22
B. TEST REQUIREMENT
S. No. Description Specified Observed
0.10 mm feeler
1 Seat clearance gauge should not CONFIRM --- ---
Pass through out
Smooth Interference
2 Movement CONFIRM --- ---
free movement
Approved By Inspected By
Item
Description of Goods Unit Qty
No.
31, SECTOR ‘C’, INDUSTRIAL AREA, SANWER ROAD, INDORE 452 015 (M.P.) INDIA
PH: 0091-731-4232900, 2720143 / FAX : 0091-731-2720499
E-mail : info@jashindia.com / Website : www.jashindia.com
14-Warranty Certificate
SAMPLE
WARRANTY
CERTIFICATE
15-Valid ISO and other
management certificates (9001,
14001 & 18001)
ISO
CERTIFICATES
ISO CERTIFICATES
FOR SUPPLIER
Thi
sist
ocer
ti
fythatt
he
Qual
it
yManage
me ntSys
temof
ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR
hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof
I
SO9001:
2015
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.
Cert
if
icat
eNo. :
BQSR15382
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025
-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)
Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
Thi
sistoc
ert
ifyt
hatthe
Env
ironment
alManagementSys
temof
ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR
hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof
I
SO14001:
2015
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.
Cert
if
icat
eNo. :
BQSR15383
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025
-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)
Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
Thisi
stoc
ert
if
ythatt
he
Oc
cupat
ionalHealt
h&Safe
tyManageme
ntSy
ste
mof
ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR
hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof
I
SO45001:
2018
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.
Cert
if
icat
eNo. :
BQSR15384
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025
-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)
Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
ISO CERTIFICATES
FOR
MANUFACTURER
JASH ENGINEERING LIMITED
HEAD OFFICE : PLOT NO. 31, SECTOR ‘C’, INDUSTRIAL AREA, SANWER ROAD,
INDORE – 452 015, MADHYA PRADESH, INDIA.
This is a multi-site certificate, additional site(s) are listed on the next page(s)
Bureau Veritas Certification Holding SAS – UK Branch certifies that the Management
System of the above organization has been audited and found to be in accordance
with the requirements of the Management System standards detailed below.
Standards
Original cycle start date for ISO 9001: & ISO 14001: 20 March 2018
Original cycle start date for ISO 45001: 10 April 2020
Expiry date of previous cycle: 19 March 2021
Recertification Audit date: 31 December 2020
Recertification cycle start date: 17 March 2021
Subject to the continued satisfactory operation of the organization’s Management System,
this certificate expires on: 16 March 2024
Standards
Trademark: -
We confirm that the samples evaluated, according to our review of the above test reports and with our
complementary evaluation, without any reasonable doubt will fulfil the requirements according to following
mentioned standards
The product was found to contain the required items for CE Markings according to:
• Machinery Directive – 98/37/EC
• EN 982
• BS 7775
Note: Products entering the European Union are subject to the requirements set forth in the European Directives. It is the responsibility of the
person placing the product on the European market to ensure compliance with applicable Directives. Our services are intended to provide you
with the data needed to determine compliance, but the person placing the product on the European market still has the responsibility to ensure
each product complies with the applicable Directives. Our report under this investigation will not imply that ETL SEMKO has Listed, Verified, or
Recognized the product, nor does it authorize the use of Listing or Verification Marks or other reference to ETL SEMKO, on or in connection with
the product.
This certificate may only be reproduced in its entirety and without any change.
Page 1 of 2
ANNEXURE
1 Cast Iron Flat / Flange Back Frame Sluice Gate Thimble Mounted C-FSG-TM
2 Cast Iron Flat / Flange Back Frame Sluice Gate Face Wall Mounted C-FSG-WM
3 Cast Iron Spigot Back Frame Sluice Gate Face Wall Mounted C-SSG-WM
5 Cast Iron Downward Opening Weir Gate Face Wall Mounted C-DWG-WM
13 Fabricated Flat / Flange Back Frame Slide Gate Face Wall Mounted F-FSG-WM
Page 2 of 2
TO THE MACHINERY DIRECTIVE – 98/37/EC
Trademark: -
We confirm that the samples evaluated, according to our review of the above test reports and with our
complementary evaluation, without any reasonable doubt will fulfil the requirements according to following
mentioned standards
The product was found to contain the required items for CE Markings according to:
• Machinery Directive – 98/37/EC
• EN 982
• BS 7775
Note: Products entering the European Union are subject to the requirements set forth in the European Directives. It is the responsibility of the
person placing the product on the European market to ensure compliance with applicable Directives. Our services are intended to provide you
with the data needed to determine compliance, but the person placing the product on the European market still has the responsibility to ensure
each product complies with the applicable Directives. Our report under this investigation will not imply that ETL SEMKO has Listed, Verified, or
Recognized the product, nor does it authorize the use of Listing or Verification Marks or other reference to ETL SEMKO, on or in connection with
the product.
This certificate may only be reproduced in its entirety and without any change.
Page 1 of 2
ANNEXURE
1 Cast Iron Flat / Flange Back Frame Sluice Gate Thimble Mounted C-FSG-TM
2 Cast Iron Flat / Flange Back Frame Sluice Gate Face Wall Mounted C-FSG-WM
3 Cast Iron Spigot Back Frame Sluice Gate Face Wall Mounted C-SSG-WM
5 Cast Iron Downward Opening Weir Gate Face Wall Mounted C-DWG-WM
13 Fabricated Flat / Flange Back Frame Slide Gate Face Wall Mounted F-FSG-WM
Page 2 of 2
16-Copy of Valid Certificate/Approval of
the firm (manufacturer/Supplier) from
concerned government department
REFERENCE
LIST
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
QATAR
1000 x 1350 2 Manually Operated Rentech Environment Protection Technology LLC, 2004
Al. Open Channel gate Dubai-UAE.
300 x 300 4 Al. handstop
Project: 20 Mld UASB STP at Ras Al Khaimah , UAE.
Consultants: EarthCAD Inc.
1000 x 300 2 Manually Operated Cast Star Steel International LLC, Dubai 2008
750 x 750 2 Iron Sluice Gate
750 x 750 2 Project: Rebar Mill, Dubai.
650 x 650 2 Consultants: MECON
600 x 600 4
300 x 300 4
1000 x 1000 2 Manually operated Cast Global Engineering Systems FZ, Sharjah, UAE 2009
Iron Open Channel gates
1000 x 1350 4 Manually operates Lutz-Jesco Middle East FZE, Sharjah, U. A. E. 2009
Aluminium open channel
gates
700 x 700 2 Manually operated Cast Global Engineering Systems FZC, Sharjah, UAE 2009
600 x 600 1 Iron Penstocks
Project: 7097, Falcon City, Dubai
Page 1 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
600 x 700 2 Cast Iron Sluice Gate Al Raida Engineering & Industrial Services WLL / 2011
800 x 800 4 QATAR PETROLEUM, QATAR
1000 x 1000 1
150 x 250 1 Project: EPIC FOR WET UTILITIES DISTRIBUTION
300 x 450 1 NETWORK FOR SUPPORT SERVICE AREA PHASE I
300 x 450 1 & II AND MAINS NETWORK FOR ONGOING
300 x 450 1 DEVELOPMENT AT WEST END EXTENSION, RAS
400 x 600 1 LAFFAN (GT09111200)
400 x 600 1 Consultants: Penspen International Ltd
300 x 450 1
150 x 250 1
200 x 300 1
200 x 300 1
200 x 300 1
300 x 450 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
250 x 350 1
200 x 300 1
250 x 350 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
300 x 450 1
300 x 450 1
300 x 450 1
1500 x 1200 1 FRP Open Channel Gate Davidsons Oilfield & Industrial Supplies-F.Z.E., UAE 2011
1000 x 1000 4 CI Sluice Gate GEA Polacel Cooling Towers FZCO, UAE 2013
1000 x 1000 3 CI Sluice Gate GEA Polacel Cooling Towers FZCO, DUBAI 2014
2000 x 4000 3 Wire mesh Coarse Screen
2000 x 2000 3 Coarse Bar Screen Project: Email Based
DN 150 2 CI Knife Gat Valve Fouress Equipment Trading LLC, Dubai 2014
Manual
DN 200 2 CI Knife Gate Valve Project:
electric
Page 2 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
Page 3 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
Page 4 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
800 X 800 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
800 X 800 1 Project: AL WAKRAH LOGISTICS PARK PHASE-1
1100 X 1100 1 (WLP-A), Qatar
1100 X 1100 1
500 X 500 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
Project: IA 12/13/C058 ST, ATTENUATION TANK
WORKS, Qatar
500 X 500 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
500 X 500 1 Project: DOHA PORT REDEVELOPMENT PROJECT,
400 X 400 1 Qatar
500 X 500 1
20684704 2 Stainless Steel Stop Logs Severn Glocon FZE, UAE 2018
2068X4032 2 Stainless Steel Stop Logs Project: Jebel Ali STP,
2068X1550 1 Stainless Steel Lifting Beam
2068X4704 2 Stainless Steel Storage
2068X4032 2 Racks
Stainless Steel Storage
Racks
800 X 800 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
Project: AL RAYYAN STADIUM SC2022 SUPPORT
WORKS, Qatar
400 X 400 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
700 X 700 1 Project: Project No.: 1325-17 -Affordable Housing
Accomodation, Qatar
800 X2400 1 Stainless Steel Frame for Al Raida Engineering & Industrial Services WLL, Qatar 2018
Stop Logs Project: Al Dhakira Sewage Treatment Works
800X2000 1 Composite Stoplogs
800x2000 1 Carbon Steel Lifting Beam
600X1000 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Stainless Steel Sluice Gates Project: AL KHOR EXPRESSWAY, QATAR
1000X1000 1
1000X1000 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project: AL KHOR EXPRESSWAY, QATAR
Dia.700 1 Cast Iron Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project: Pre-Contract Services Infrastructure & Highway
Dia. 600 1
Page 5 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
Page 6 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
400X400 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: CONSTRUCTION OF SITE 21 - AL WAKRAH
BUS DEPOT, AL WAKRAH
2000X2000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: (PWA/GTC/15/2019) DUHAIL SOUTH &
LEKHBA (ZONE 30 & 31) PKG 1
1000X1000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: AA/DOM/13-14/M/1591-4.07 /G - SR-124 -
1300X1300 1 AZIZIYA UNDERGROUND STORAGE TANK
Stainless-Steel 316 Sluice
gate
300X300 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: ENERGY CENTRE AND CAR PARK
600X600 2 SS 316 Sluice Gate Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: FIFA Readiness Project, Qatar
600 x 600 3 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: DOHA SOUTH STW PHASE 4 EXTENSION
800 x 800 7
Page 7 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
1000 x 1000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: Al Leabaib
1200 x 1200 1
1500 x 1500 1
800 x 900 3 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: BARWA STPS
300 x 300 2
600 x 600 1
1100 x 1100 2
1000 x 1000 2
400 x 400 2
900 x 900 2
1600 x 1600 2
1000 x 1695 1 Frame stainless steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
1000 x 1695 3 Stoplog stainless steel 316 Project: D-Ring Road Improvement Works (Project ID:
stop Log PA 2019 C 109 G)
1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: PA 2019 C 066 G - UMM SLAL MOHAMMED
PHASE 02 PACKAGE 1
300 x 300 2 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: Construction of Site 22 - Bus Depot in Al
Industrial Area & Construction of Site 23 - Bus Depot in
Al Rayyan
300 x 300 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: UM ALHOUL (QEZ3) ECONOMIC ZONE
600 x 600 1
Stainless Steel 316
Penstock
1500 x 1000 4 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022
Penstock Project: NFE0SA104 - NORTH FIELD EAST PROJECT,
550 x 550 1 QATAR
450 x 450 1 Stainless Steel 316
Penstock
350 x 350 1
Stainless Steel 316
Penstock
Stainless Steel 316
Penstock
450 X 450 6 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: EPIC for Ground Water Drainage system in
400 X 400 2 Mesaieed ( Phase 1) Qatar Petroleum
400 X 800 4 Stainless Steel 316
Penstock
680 X 680 2
Stainless Steel 316
350 X 350 2 Penstock
Stainless Steel 316
Penstock
Page 8 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com
600 X 600 2 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022
Penstock Project: SEWAGE PUMPING STATION PS 25/9A (N)
IN KATARA - C818,-PROJECT ID: PA2020 C 0651
1500 X 1500 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: AL KHARATIYAT & IZGAWA PHASE 1,
PACKAGE 01
1000 X 1000 3 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: FLOOD PREVENTION SCHEME FOR DOHA
SOUTH AREA FPS PHASE 3- CSS0/2
1000 X 1000 3 HDPE Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Project: Golden Gate Terminal
200 x 200 3 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: GEWAN ISLAND PACKAGE 2:
400 x 400 2 INFRASTRUCTURE WORKS
Stainless Steel 316
Penstock
1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 034 FPS - FIFA READINESS
1000 x 1000 1 PROJECT FRP-07 AL ONIAZA AND MARKHIYA
Stainless Steel 316
Penstock
400 x 400 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 097 G & Al Khor Expressway Link
Road 6 Emiri Guards camp in Lusail
1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 097 G & Al Khor Expressway Link
Road 6 Emiri Guards camp in Lusail
200X200 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: MVL-TRANS REGIONAL LOGISTICS
COMPLEX AL UDEID AIR BASE (TRLC)
3000X3000 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: Central Doha Beautification Project, Qatar
Page 9 of 9
17-List of Projects (completed and
ongoing) / copy of approval
PREVIOUS
APPROVAL
IN QATAR
18-Copy of previous ASHGHAL approval
GA
DRAWINGS
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054
COMPRESSION
12
3~5 SEAL
PRIMARY
CONCRETE
04
DETAIL 1
450
222
PRIMARY
3~5 SEAL CONCRETE
COMPRESSION
225
450
F F MAX. MAX.
WATER EL. WATER EL. 13
225
200
260 05
100
200
PRIMARY
32575
CONCRETE
354
450
ISOMETRIC VIEW
SECTION E-E
SECTION D-D TOP SEALING
BOTTOM SEALING
=560 C/C= DIRECTION DIRECTION
OF FLOW OF FLOW
2000 HEIGHT GUIDE FRAME
E 14 LIFTING BEAM
03 1376 WIDTH OF LOG
STAINLESS STEEL BS EN 10088-2 GRADE
13 TOP SEAL RETAINER 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
1000 WIDTH OF OPENING
1000 HEIGHT OF STOP LOG OPENING
C C CERTIFIED
E 12 SIDE SEAL RETAINER
B B
1125 HEIGHT OF LOG
BOTTOM SEAL
11 RETAINER
10 TOP RUBBER SEAL
01
9 SIDE RUBBER SEAL EPDM ASTM D2000
BOTTOM RUBBER
8 SEAL
D 7 SIDE SEAL BEARING HDPE
BLOCK
INVERT EL.
SHUTTER SIDE
-3.575 M 6 GUIDE
1384 FRAME INSIDE TO INSIDE
5 TOP SEAL PAD
SECTION B-B TABLE 'A' STAINLESS STEEL BS EN 10088-2 GRADE
4 SIDE SEAL PAD 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
D A 254 SR. NO. DESCRIPTION QTY. CERTIFIED
3 STOP LOG SHUTTER
1000 WIDTH OF STOP LOG OPENING 450 STOP LOG FRAME
01 02 Nos.
1000(W) X 32575 (H) 2 GUIDE ANGLE
1410 WIDTH OF FRAME
STOP LOG SHUTTER 02 SET
SECTION A-A 02 1000(W) X1000(H) (01 No/SET)
1 STOP LOG FRAME
FRONT VIEW
03 LIFTING BEAM 01 No. Sr. NO. DESCRIPTION MATERIAL
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
DESIGN DATA TABLE:
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. ALLOWABLE DEVIATION FOR DIMENSIONS WITHOUT SPECIFIED TOLERANCES TO BE AS PER ISO : 2768. DOHA NORTH STW PAKAGE 3
1. DESIGN HEAD 32.3 M. TAG No. & SL-0111/ SCREEN CHAMBER-1 INLET STOP LOG
2. ALL FASTENERS (NUT, BOLTS AND WASHERS) FOR STOP LOG ASSEMBLY, FASTENERS FOR RUBBER
FRON INVERT LOCATION : SL-0211/ SCREEN CHAMBER-2 INLET STOP LOG
SEAL & FRAME ASSEMBLY STAINLESS STEEL TYPE 316 . QTY. SEE TABLE 'A'
3. PAINT FOR LOG, FRAME AND LIFTING BEAM ASSLY.- 2. OPENING WIDTH 1000 PROJECTION
ALL STAINLESS STEEL FABRICATED PARTS TO BE ACID WASH PASSIVATED.
J A S H
4. WEIGHT OF EACH STOP LOG SHUTTER 300 Kg. APPX.
3. OPENING HEIGHT 1000
5. SEALING ARRANGEMENT PROVIDED ON FOUR SIDES i.e. TWO VERTICAL SIDES, ONE TOP SIDE & ONE BOTTOM FACE. JASH ENGINEERING LTD.
INDORE (M.P.)
4. IL TO PL 32575 SCALE - NTS DATE 14.10.2022
GENERAL ARRANGEMENT DETAILS
OPERATING LIFTING
FOR INSTALLATION OF SIDE WALL APPD. BY VV
5.
ARRANGEMENT BEAM
EMBEDDED STOP LOG SIZE 1000 (W)x CHKD. BY VS
1000 (H) TO COVER CLEAR OPENING DRWN. BY VA
DESIGN REV. CHD. DATE OF 1000 (W) x 1000 (H) AND FRAME TO
6. IS:5620 REV. DESCRIPTION DRG. NO. REV.
STANDARD BY BY
SUIT 1000 (W) x 32575(H).
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION. REVISIONS GA-A-JAE-QA-00054007 R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054
1520
225
450
225
425
260 1000 260
TOP VIEW
32575
450
260 1000 WIDTH OF OPENING 260
H
H
1000 HEIGHT OF OPENING
SECTION H-H
100
100
1520
ISOMETRIC VIEW
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. FOR GENERAL ARRANGEMENT PLEASE REFER DRAWING No. GA-A-JAE-QA-00054007. DOHA NORTH STW PAKAGE 3
TAG No. & SL-0111/ SCREEN CHAMBER-1 INLET STOP LOG
LOCATION : SL-0211/ SCREEN CHAMBER-2 INLET STOP LOG
QTY. SEE TABLE 'A'
PROJECTION
J A S H
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION.
GA-A-JAE-QA-00054007A R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054
05
04
01
03
02 ISOMETRIC VIEW
= 560 C/C =
140
1376
COMPRESSION
A 12
3~5 SEAL
PRIMARY
1
14
SECONDRY 07 09
GROUT
04
DETAIL 1
450
222
PRIMARY
3~5 SEAL CONCRETE
COMPRESSION
225
450
F F 13
MAX. MAX.
225
200
WATER EL. WATER EL.
260 05
100
200
PRIMARY
32825
CONCRETE
354
450
ISOMETRIC VIEW
SECTION E-E
SECTION D-D TOP SEALING
BOTTOM SEALING
=560 C/C= DIRECTION DIRECTION
OF FLOW OF FLOW
2000 HEIGHT GUIDE FRAME
14 LIFTING BEAM
E
1376 WIDTH OF LOG
03 STAINLESS STEEL BS EN 10088-2 GRADE
13 TOP SEAL RETAINER 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
1000 WIDTH OF OPENING
CERTIFIED
1000 HEIGHT OF STOP LOG OPENING
11 RETAINER
10 TOP RUBBER SEAL
1520
225
450
225
425
260 1000 260
TOP VIEW
32825
450
H
260 1000 WIDTH OF OPENING 260
H
1000 HEIGHT OF OPENING
SECTION H-H
100
100
1520
ISOMETRIC VIEW
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. FOR GENERAL ARRANGEMENT PLEASE REFER DRAWING No. GA-A-JAE-QA-00054008. DOHA NORTH STW PAKAGE 3
TAG No. & SL-0112/ SCREEN CHAMBER-1 OUTLET STOP LOG
LOCATION : SL-0212/ SCREEN CHAMBER-2 OUTLET STOP LOG
QTY. SEE TABLE 'A'
PROJECTION
J A S H
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION.
GA-A-JAE-QA-00054008A R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054
05
04
01
03
02 ISOMETRIC VIEW
= 560 C/C =
140
1376