Client Consultant Contractor

Material submittal Requirements Checklist FORM NO: C823-3-MET-GEN-033 - Rev-1

Contract Construction of Sewage Terminal Pumping Station at Doha North STW Package-3 – C823/3.

Sr. Item to be Verified in attachment JEC DC JEC QC Remarks

1 Listed in PWA Vendor List (PVL)  Folder 1

2 Scope of works  Folder 2

3 BOQ reference/Specification section/Specific reference drawing  Folder 3

4 Technical Data sheet  Folder 4

5 Company profile  Folder 5

6 Company Organization Chart  Folder 6

7 Compliance statement  Folder 7

8 Valid CR copy/ company ID  Folder 8

9 Material Catalogue  Folder 9

10 Country of Origin - Sample  Folder 10

11 Test Reports - Sample  Folder 11

12 Sample with material, company and country details (Sample Name Plate)  Folder 12

13 Spare Parts  Folder 13

14 Warranty Certificate - Sample  Folder 14

15 Valid ISO and other management certificates (9001, 14001 & 18001)  Folder 15

Copy of Valid Certificate/Approval of the firm (manufacturer/Supplier) from


16
concerned government department (Included in Sr no. 1)  Folder 16

17 List of Projects (completed and ongoing) / copy of approval  Folder 17

18 Copy of previous ASHGHAL approval  Folder 18

19 Authorization Letter  Folder 19

20 Storage and Handling Instructions  Folder 20

21 GA Drawings (Manufacturer)  Folder 21

22 Inspection Test Plan (ITP)-Sample  Folder 22

23 Installation/Operation and Maintenance Instructions  Folder 23

Comments:

Page 1 of 1
INDEX
PWA VENDOR LIST (PVL) 1
SCHEDULE OF MATERIAL 2
SPECIFICATION REFERENCE 3
TECHNICAL DATA SHEET
− PROJECT DATA SHEET 4
− TECHNICAL DATA SHEET FOR STOPLOG
COMPANY PROFILE
− SUPPLIER COMPANY PROFILE 5
− MANUFACTURER COMPANY PROFILE
ORGANIZATION CHART
− SUPPLIER COMPANY PROFILE 6
− MANUFACTURER COMPANY PROFILE
COMPLIANCE SHEET 7
LICENSE FOR LOCAL AGENT 8
PRODUCT CATALOGUES 9
SAMPLE CERTIFICATE FOR COUNTRY OF ORIGIN 10
SAMPLE TEST CERTIFICATES 11
SAMPLE NAME PLATE 12
SPARE PARTS LIST 13
SAMPLE WARRANTY CERTIFICATE 14
ISO CERTIFICATES
− ISO CERTIFICATES FOR SUPPLIER 15
− ISO & QUALITY CERTIFICATES FOR MANUFACTURER
REFERENCE LIST 16
PREVIOUS APPROVAL IN QATAR 17
AUTHORIZATION LETTER 18
STORAGE AND HANDLING INSTRUCTIONS 19
GA DRAWING 20
INSPECTION TEST PLANS (QCP/ITP)-SAMPLE 21
INSTALLATION/OPERATION AND MAINTENANCE INSTRUCTIONS-SAMPLE 22

PROJECT: CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT DOHA NORTH STW


PACKAGE 3 – C823/3

Offer REF: Q20/JEC/JAS/CN/009-389-R13 SUB REF: S22/JAS/JEC/010-055B-R1


CONTRACT DETAILS
Project: CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT DOHA
NORTH STW PACKAGE 3 – C823/3

Contractor: AL JABER ENGINEERING WLL.

Client: PUBLIC WORK AUTHORITY –


(ASHGHAL)

Material: SUBMITTAL FOR SS STOPLOG

Sub Ref: S22/JAS/JEC/010-055B-R1

Date: 31/10/2022

Supplier: AL RAIDA ENG & IND SERVICES WLL.

Manufacturer: JASH ENGINEERING LIMITED - INDIA


(ASHGHAL APPROVED)
1-Listed in PWA Vendor List (PVL)
VENDOR LIST
Drainage Approved Material List

General
Scope
This document specifies the list of Manufacturers, Mechanical & Electrical Sub-Contractors and Miscellaneous Service Providers who are
approved by the Prequalification and classification committee (PCC) to provide materials and services.
Related Works
Qatar Construction Standard (QCS), Section 1 - General
Applicability
1. Contractors may employ any Manufacturer, Mechanical and Electrical Contractor, and/or any other Service Provider listed in the
Approved Vendors List at the date of submission of the tender. Any approved party added subsequent to the submission of the
tender may also be considered.
2. Where there is no category for the Manufacturer; the contractor shall submit details of the materials in accordance with Qatar
Construction Standard (QCS), Section 1 Part 7 and the approval shall be granted by the supervising consultant of the project on
project-by-project basis.
3. Where the materials and the services are listed in this document, they shall only be obtained from one of the parties on this
approved list, unless otherwise agreed by the Engineer.
4. If a Supplier/Manufacturer proposes to change the manufacturing location from the location stated in this list, or add new
manufacturing facilities, the Prequalification and classification (PCC) Committee of Public Works Authority (PWA) shall be informed
in writing by the manufacturer. The newly proposed manufacturing facility must obtain the Approval from the Prequalification and
classification (PCC) Committee prior to submission of any material submittals from this new location.
5. Products, materials and/or equipment referred to in this list that are proposed for use in PWA projects must be formally submitted,
reviewed and approved by the Supervision Consultant under the regular materials review and approval procedure, regardless of any
“Approval in principle” letter previously issued by PWA.
6. Vendors shall be enlisted for two years from the date of the official letter subject to them maintaining the same quality, terms and
conditions of the original application, and annual fulfillment of the performance report.
7. Any products and/or manufactures referred to in this list must fully comply with the requirements of the latest version of Qatar
Construction Standard.
8. Where there are less than Three (3) Manufacturers in the Category, the contractor is not obligated to follow the category. The
contractor shall obtain an alternative manufacturer and submit the details of the materials in accordance with Qatar Construction
Standard (QCS) and the approval shall be granted by the supervising consultant of the project on project-by-project basis.

Category: Penstocks

Manufacturers Agents

Industrial Penstock Ltd.

Industrial Penstock Ltd. INTERMODAL SERVICES CO. WLL

Country: United Kingdom Building 69, Office No-201 B-


Address: Ring Road, Street 220, Zone 26,
Units 1A + 1B Washington Najma Doha, Qatar
Industrial Estate Washington
Address:
Street Netherton, United P.O. Box: 31242 Doha, Qatar
Kingdom
Telephone: +974 4462 1168
P.O. Box: DY2 9PH
Fax: +974 4462 1169
Telephone: +44 (0) 1384 458411
Website:
Fax: +44 (0) 1384 246950
Email:
Website:
Email:
JASH Engineering LTD

JASH Engineering LTD Al Raida Engineering & Industrial Services WLL

Country: India P.O. Box: 24875, Doha, Qatar


Address: Tel: +974 4432 9001 Fax: +974
Sanwer Road Industrial Area, 4432 9008
Address: INDORE-452015, Madhya
Pradesh, India P.O. Box: 24875
P.O. Box: 452015 Telephone: +974 4432 9001
Telephone: + 91-731-673-2700 Fax: +974 4432 9008
Fax: +91-731-2720499 Website:
Website: www.jashindia.com Email:
Email: info@jashindia.com

KWT International

KWT International Dutco Tennant Qatar WLL

Country: Netherlands Address: P.O. Box: 3288, Doha,Qatar


Wentelploeg 42 8256 SN, P.O. Box: 3288
Address:
Biddinghuizen The Netherlands
Telephone: 00974 44655808
P.O. Box: 8256 SN
Fax: 00974 44657519
Telephone: +31 (0) 321-335563
Website: www.dutcotennant.com
Fax: +31 (0) 321-335573
Email: sales@dutcotennant.com
Website:
Email: info@kwtgroup.nl

VAG GmbH

VAG GmbH Mannheim Factory Petrofac Qatar W.L.L

Country: Germany PETRO-Q Building, C-Ring


Address:
Road, Doha – Qatar
Carl Reuther Str – 1, 68305
Address: Mannheim, Postach 31 05 48, P.O. Box: 4404
68265 Mannheim Germany
Telephone: +974 4033 8888
P.O. Box: N/A
Fax: +974 4033 8899
Telephone: 0049 621 749 2138
Website:
Fax: 0049 621 749 29 2838
Email: sales@petro-q.com
Website:
Email: p.loecher@vag-group.com

Waterman Industries Inc.


2-Scope of works
SCHEDULE OF
MATERIAL
CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT DOHA NORTH STW PACKAGE 3 – C823/3

S. NO. DESCRIPTION UNIT QTY.

SUPPLY, DELIVERY & SUPERVISION OF TESTING AND COM M ISSIONING OF SS M OTORIZED PENSTOCK &
A
SS STOPLOG AS PER QCS 2014, PROJECT SPEC AND M ATERIAL SUBM ITTAL APPROVAL.

1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
1 PEDESTAL, RISING STEM, IC = 32500MM, SPINDLE LENGTH 33000 MM. - TAG NO. SG-0010, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32 & OFF SEATING 32
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
2 PEDESTAL, RISING STEM, IC = 32500MM, SPINDLE LENGTH 33000 MM. - TAG NO. SG-0011, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32 & OFF SEATING 32
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
3 PEDESTAL, RISING STEM, IC = 32575MM, SPINDLE LENGTH 33075 MM. - TAG NO. SG-0111, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
4 PEDESTAL, RISING STEM, IC = 32575MM, SPINDLE LENGTH 33075 MM. - TAG NO. SG-0211, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
5 PEDESTAL, RISING STEM, IC = 32825MM, SPINDLE LENGTH 33325 MM. - TAG NO. SG-0112, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
6 PEDESTAL, RISING STEM, IC = 32825MM, SPINDLE LENGTH 33325 MM. - TAG NO. SG-0212, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
7 PEDESTAL, RISING STEM, IC = 32843MM, SPINDLE LENGTH 33343 MM. - TAG NO. SG-0030, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
8 PEDESTAL, RISING STEM, IC = 32843MM, SPINDLE LENGTH 33343 MM. - TAG NO. SG-0031, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
9 PEDESTAL, RISING STEM, IC = 32875MM, SPINDLE LENGTH 33375 MM. - TAG NO. SG-0113, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.4 & OFF SEATING 32.4
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
10 PEDESTAL, RISING STEM, IC = 32875MM, SPINDLE LENGTH 33375 MM. - TAG NO. SG-0213, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.4 & OFF SEATING 32.4
500 X 500 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
11 PEDESTAL, RISING STEM, IC = 34600MM, SPINDLE LENGTH 35100 MM. - TAG NO. SG-0035, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 34.1 & OFF SEATING 34.1
500 X 500 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L MOTORIZED PENSTOCK WITH
12 PEDESTAL, RISING STEM, IC = 34600MM, SPINDLE LENGTH 35100 MM. - TAG NO. SG-0036, ZONE 1 Nos. 1
(HAZARDOUS AREA), ON SEATING 34.1 & OFF SEATING 34.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32575MM, ZONE 1
13 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32575MM, ZONE 1
14 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.1 & OFF SEATING 32.1
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32825MM, ZONE 1
15 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
1000 X 1000 MM, SIDE WALL EMBEDDED IN CONCRETE, SS 316L STOP LOG, IC = 32825MM, ZONE 1
16 Nos. 1
(HAZARDOUS AREA), ON SEATING 32.3 & OFF SEATING 32.3
17 STORAGE RACK FOR SS STOPLOG Nos. 4
18 LIFTING BEAM FOR SS STOPLOG Nos. 4

19 SPARE PARTS FOR ALL MOTORIZED SS PENSTOCK & SS STOPLOG For 2 YEARS OPERATIONS LOT 1

Page 1 of 1
3-BOQ reference/Specification
section/Specific reference drawing
SPECIFICATION
REFERENCE
QCS 2014 Section 08: Drainage Works Page 15
Part 05: Valves, Penstocks and Appurtenances

4 Spindle operating nuts shall be of gunmetal or manufactured from an approved ultra-high


molecular weight polyethylene material. The operating nuts for the spindle retaining blocks
shall be fixed in a visible position inside a separate gate lifting bracket bolted on to the top of
the door with stainless steel fasteners. The operating nut or spindle retaining block shall not
be contained within the door.

5 All plastic materials shall be non-toxic ultraviolet stabilised and shall have fire resistance as
specified in BS 475 and be to Class P and Class I of Part 5 and 7 thereof respectively.

6 All other requirements shall be as specified in Clause 5.1.3 Clause 5.11.2 herein.

7 Plastic penstocks shall only be used when indicated in the Contract Documents and
approved by the Engineer.

5.11.5 Stoplogs

.
1 Stoplogs shall be fabricated from reinforced composite plastic material which is non-toxic and

l
.l.
stabilised against ultraviolet light. Asbestos shall not be used in the manufacture of the stop-
logs.

rw
2 Plastic logs of 300 mm and 400 mm depths shall be furnished to provide closure of stoplog
openings. Full depth gates shall not be acceptable.

3 ta
Each log shall be provided with a stainless steel eye bolt at each end which fits into a recess
qa
in the under surface of the next log. Two lifting poles fitted with hooked ends for engaging
the eye bolts shall be furnished for each facility and shall be mounted locally on a handrail
supported pole rack. Poles and racks shall be constructed of aluminium and bolts of
as

stainless steel.
se

4 Stoplogs shall provide a high degree of sealing with a leakage rate of less than 0.04 l/sqm of
seating perimeter. Stoplog frame shall be for insertion in a wall and invert recess.
er

5 Anchor bolts shall be stainless steel.


ov

6 Frames shall be manufactured from stainless steel BS 970 or BS 1449 Grade 316. All frames
shall be suitably reinforced and include corner gussets where necessary. All fasteners shall
be stainless steel.
it o

7 Frames shall be fitted with seals which are molecularly incompatible with the closure
et

material. Where necessary, the seals shall be fixed with corrosion resistant retaining strips
and stainless steel fasteners.
m

5.12 OPERATING DEVICES

5.12.1 Lifts

1 Lifts shall be designed to operate the gate of the specified head with a maximum of 25 kg
force applied to the device. The lift shall be a liftnut for tee key operation or gear/handwheel
lift as designated.
PROJECT DRAWINGS
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
X Public Works Authority
P.O.Box 22188
1:1 Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

** PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
INSTRUMENTATION
LEGEND AND SYMBOLS
P&ID
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-IC-0021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

LEGEND

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
INSTRUMENTATION
PUMPING STATION
P&ID
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-IC-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

Inst / Equip / LCP Signal Tag Description Drawing Ref No. Hardwired I/O RTD Communication Remarks
A A
Tag DI DO AI AO
YI-0130A_RM Dry well Main Pump 1 Remote Status C823-P03-STN-IC-6101 1
YI-0130B_RN Dry well Main Pump 1 Running Status C823-P03-STN-IC-6101 1
YA-0130A_FA Dry well Main Pump 1 Fault Alarm C823-P03-STN-IC-6101 1
YA-0130B_E-Stop Dry well Main Pump 1 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0130 Dry well Main Pump 1 Trip Alarm
YA-0130C_TRIP C823-P03-STN-IC-6101 1
VFD Panel
HS-0130_S/S Dry well Main Pump 1 Start / Stop Command C823-P03-STN-IC-6101 1
SI-0130 Dry well Main Pump 1 Speed Signal C823-P03-STN-IC-6101 1
SK-0130 Dry well Main Pump 1 Speed Control Command C823-P03-STN-IC-6101 1
P-0130_VFD Dry well Main Pump 1 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0130D Dry well Main Pump 1 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
B MA-0130 Dry well Main Pump 1 Moisture Ingress Alarm C823-P03-STN-IC-6101 1 B
P-0130 TAH-0130A Dry well Main Pump 1 Winding Temperature High C823-P03-STN-IC-6101 1
(Protection monitor) TAH-0130B Dry well Main Pump 1 Bearing Temperature High C823-P03-STN-IC-6101 1
VAH-0130 Dry well Main Pump 1 Vibration High C823-P03-STN-IC-6101 1
P-0130_PM Dry well Main Pump 1 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
PI-0130 Dry well Main Pump 1 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0130
PAH-0130 Dry well Main Pump 1 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0130 Signal Converter
ZSO-0130 ZSO-0130 Dry well Main Pump 1 Discharge No Flow Alarm C823-P03-STN-IC-6101 1
YI-0140A_RM Dry well Main Pump 2 Remote Status C823-P03-STN-IC-6101 1
YI-0140B_RN Dry well Main Pump 2 Running Status C823-P03-STN-IC-6101 1
YA-0140A_FA Dry well Main Pump 2 Fault Alarm C823-P03-STN-IC-6101 1
YA-0140B_E-Stop Dry well Main Pump 2 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0140
YA-0140C_TRIP Dry well Main Pump 2 Trip Alarm C823-P03-STN-IC-6101 1
C VFD Panel C
HS-0140_S/S Dry well Main Pump 2 Start / Stop Command C823-P03-STN-IC-6101 1
SI-0140 Dry well Main Pump 2 Speed Signal C823-P03-STN-IC-6101 1
SK-0140 Dry well Main Pump 2 Speed Control Command C823-P03-STN-IC-6101 1
P-0140_VFD Dry well Main Pump 2 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0140D Dry well Main Pump 2 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
MA-0140 Dry well Main Pump 2 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
P-0140 TAH-0140A Dry well Main Pump 2 Winding Temperature High C823-P03-STN-IC-6101 1
(Protection monitor) TAH-0140B Dry well Main Pump 2 Bearing Temperature High C823-P03-STN-IC-6101 1
VAH-0140 Dry well Main Pump 2 Vibration High C823-P03-STN-IC-6101 1
P-0140_PM Dry well Main Pump 2 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
PI-0140 Dry well Main Pump 2 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0140
PAH-0140 Dry well Main Pump 2 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0140 Signal Converter
D ZSO-0140 ZSO-0140 Dry well Main Pump 2 Discharge No Flow Alarm C823-P03-STN-IC-6101 1 D
YI-0150A_RM Dry well Main Pump 3 Remote Status C823-P03-STN-IC-6101 1
YI-0150B_RN Dry well Main Pump 3 Running Status C823-P03-STN-IC-6101 1
YA-0150A_FA Dry well Main Pump 3 Fault Alarm C823-P03-STN-IC-6101 1
YA-0150B_E-Stop Dry well Main Pump 3 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0150
YA-0150C_TRIP Dry well Main Pump 3 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel (Future)
HS-0150_S/S
SI-0150
Dry well Main Pump 3 Start / Stop Command
Dry well Main Pump 3 Speed Signal
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
1
1
ISSUED FOR CONSTRUCTION
SK-0150 Dry well Main Pump 3 Speed Control Command C823-P03-STN-IC-6101 1
P-0150_VFD Dry well Main Pump 3 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0150D Dry well Main Pump 3 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
Rev. Date Revision Details Drawn Chkd. Appd.
MA-0150 Dry well Main Pump 3 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
P-0150 Dry well Main Pump 3 Winding Temperature High
E TAH-0150A C823-P03-STN-IC-6101 1 E
(Protection monitor)
(Future) TAH-0150B Dry well Main Pump 3 Bearing Temperature High C823-P03-STN-IC-6101 1 Public Works Authority
VAH-0150 Dry well Main Pump 3 Vibration High C823-P03-STN-IC-6101 1
P.O.Box 22188
P-0150_PM Dry well Main Pump 3 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
Tel. : (0974) 44950000
PI-0150 Dry well Main Pump 3 Discharge Pressure C823-P03-STN-IC-6101 1 Fax. : (0974) 44950999
PIT-0150 www.ashghal.gov.qa Qatar Deserves The Best
PAH-0150 Dry well Main Pump 3 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0150 Signal Converter
ZSO-0150 ZSO-0150 Dry well Main Pump 3 Discharge No Flow Alarm C823-P03-STN-IC-6101 1
YI-0230A_RM
YI-0230B_RN
YA-0230A_FA
Dry well Main Pump 4 Remote Status
Dry well Main Pump 4 Running Status
Dry well Main Pump 4 Fault Alarm
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
C823-P03-STN-IC-6101
1
1
1
PA
PROJECTS AFFAIRS
YA-0230B_E-Stop Dry well Main Pump 4 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0230
YA-0230A_TRIP Dry well Main Pump 4 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel DESIGNS DEPARTMENT
HS-0230_S/S Dry well Main Pump 4 Start / Stop Command C823-P03-STN-IC-6101 1
F F
SI-0230 Dry well Main Pump 4 Speed Signal C823-P03-STN-IC-6101 1 Design Consultant :
SK-0230 Dry well Main Pump 4 Speed Control Command C823-P03-STN-IC-6101 1
P-0230_VFD Dry well Main Pump 4 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
YA-0230D Dry well Main Pump 4 Mechanical Seal Leakage C823-P03-STN-IC-6101 1
MA-0230 Dry well Main Pump 4 Moisture Ingress Alarm C823-P03-STN-IC-6101 1
Stantec UK Limited, Box : 207312, 9th Floor,
P-0230 TAH-0230A Dry well Main Pump 4 Winding Temperature High C823-P03-STN-IC-6101 1 Al Mana Tower, C Ring Road, Doha-Qatar,
(Protection monitor) TAH-0230B Dry well Main Pump 4 Bearing Temperature High C823-P03-STN-IC-6101 1 Tel : (+974) 44804622 Fax : (+974) 44368694

VAH-0230 Dry well Main Pump 4 Vibration High C823-P03-STN-IC-6101 1 Project Name:
P-0230_PM Dry well Main Pump 4 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type CONSTRUCTION OF TERMINAL
PI-0230 Dry well Main Pump 4 Discharge Pressure C823-P03-STN-IC-6101 1
PIT-0230
PAH-0230 Dry well Main Pump 4 Discharge Pressure High C823-P03-STN-IC-6101 1 Derived from PIT-0230 Signal Converter
SEWAGE PUMPING STATION AT
ZSO-0230 ZSO-0230 Dry well Main Pump 4 Discharge No Flow Alarm C823-P03-STN-IC-6101 1 DOHA NORTH STW PACKAGE 3
G YI-0240A_RM Dry well Main Pump 5 Remote Status C823-P03-STN-IC-6101 1 G
YI-0240B_RN Dry well Main Pump 5 Running Status C823-P03-STN-IC-6101 1
C823/3
YA-0240A_FA Dry well Main Pump 5 Fault Alarm Project Code:
C823-P03-STN-IC-6101 1 PA 2020 C 009 G
YA-0240B_E-Stop Dry well Main Pump 5 E-Stop Alarm C823-P03-STN-IC-6101 1
P-0240 Drawing Title:
YA-0240A_TRIP Dry well Main Pump 5 Trip Alarm C823-P03-STN-IC-6101 1
VFD Panel
HS-0240_S/S Dry well Main Pump 5 Start / Stop Command C823-P03-STN-IC-6101 1 SHEEHANIYA TERMINAL PS
SI-0240 Dry well Main Pump 5 Speed Signal C823-P03-STN-IC-6101 1 INSTRUMENTATION
SK-0240 Dry well Main Pump 5 Speed Control Command C823-P03-STN-IC-6101 1
P-0240_VFD Dry well Main Pump 5 VFD Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type IO SCHEDULE
YA-0240D Dry well Main Pump 5 Mechanical Seal Leakage C823-P03-STN-IC-6101 1 SHEET 1 OF 10
MA-0240 Dry well Main Pump 5 Moisture Ingress Alarm C823-P03-STN-IC-6101 1 Drawn: Checked:
Dry well Main Pump 5 Winding Temperature High K. SHETTY I. KHAN
P-0240 TAH-0240A C823-P03-STN-IC-6101 1
(Protection monitor) Designed: Approved:
H TAH-0240B Dry well Main Pump 5 Bearing Temperature High C823-P03-STN-IC-6101 1 K. SHETTY K. PEZHGORSKI H
VAH-0240 Dry well Main Pump 5 Vibration High C823-P03-STN-IC-6101 1 Date: Scale:
JUNE 2019 NTS
P-0240_PM Dry well Main Pump 5 Protection Monitor Interface Signals C823-P03-STN-IC-6101 1 Final Vendor to Confirm Communication interface Type
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-IC-6201 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
GENERAL NOTES

Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
MARCH 2019 NO SCALE
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-ME-0021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

DN 600
DN 600

DN 600
DN 400

D D

ISSUED FOR CONSTRUCTION

DN 600

DN 600
DN 600
Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
PROCESS FLOW DIAGRAM

Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
MARCH 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-ME-1021 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D
0 2.5 5 7.5 10 12.5m

SCALE 1:250 AT ORIGINAL SIZE

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
PROPOSED SITE LAYOUT

Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1:250 ON A1
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-ME-1101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
24600 METERS UNLESS SHOWN OTHERWISE.
ELECTRICAL CABLE TRAY, 2. REFER DRAWINGS C823-P03-STN-ME-0026 FOR MECHANICAL
REFER ELECTRICAL DRAWINGS GENERAL NOTES.
FOR DETAILS 3. REFER TO RESPECTIVE DISCIPLINE DRAWINGS FOR DETAILS OF
INSTRUMENTATION, ELECTRICAL, HVAC, FIRE DETECTION AND
PROTECTION AND CCTV.
4. REFER CIVIL DRAWINGS FOR DIMENSION AND OTHER DETAILS OF
VARIOUS CHAMBERS AND DRY WELL.
5. DETAILS OF STRUCTURAL COMPONENTS ARE SHOWN
REPRESENTATIVE, REFER STRUCTURAL DRAWINGS FOR DETAILS.
6. ELEVATION LEVELS SHOWN ON WET WELL SIDE ARE TOP OF
PASSENGER SLAB LEVELS, FOR BENCHING LEVELS REFER TO CIVIL DRAWINGS
LIFT REST ROOM
C B C823-P03-STN-CV-2126 AND 2127. C

3885
ME-2112 7. REFER TO CIVIL DRAWINGS C823-P03-STN-CV-2112 AND 2113 FOR

4100
SIZES OF ACCESS OPENINGS.
DRY WELL -3.650
-3.560
-3.560
-3.560 FIRE -3.560
-3.560
STAIRCASE

UP
P-0230
UP
930 DRY WELL MAIN
PUMP (TYP)
REFER CIVIL DRAWING
5300
C823-P03-STN-CV-2111
FOR WALL THICKNESS -2.530
SCR-0210

6767
7100 SL-0212 2200 WET WELL NO 2 -1.235
P-0240
MECHANICAL
D GRAB SCREEN 2 D
SG-0011 SL-0211 SG-0212
FOR DETAILS OF (STANDBY)

WET WELL DISTRIBUTION


INCOMMING PIPE REFER SG-0213 -5.700
TO DRAWING CV-1081
500x500 MOTORISED P-0250

CHAMBER NO 2
SG-0211 PENSTOCK STAIRCASE

5000
(FUTURE)
P-0220
SG-0036

24000
1000
SCREEN CHAMBER NO 2
SG-0031

P-0040
ISSUED FOR CONSTRUCTION
6000 3600
-4.506
5300

A INLET CHAMBER DRY WELL -4.520


-4.257 SG-0035 CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
ME-2112 SUMP PUMP
-3.800 Rev. Date Revision Details Drawn Chkd Appd
P-0045 (FUTURE)
E -4.250 SG-0030 E

WET WELL DISTRIBUTION


SCREEN CHAMBER NO 1 P-0150
WET WELL
TRANSFER PUMP
P-0120
CHAMBER NO 1
P-0140 2300

SG-0113 1200
2 NOS DN1000 RCC SG-0010 SL-0111 SG-0111 SCR-0110 SG-0112
PIPE WITH GRP LINING MECHANICAL
1000x1000 MOTORISED 1000x1000 P-0130
INCOMING GRAVITY GRAB SCREEN 1
PENSTOCK (TYP) STOPLOG (TYP) SL-0112 WET WELL NO 1
SEWER (DUTY)
F
DESIGNS DEPARTMENT F

Design Consultant :
-1.235
6000 -2.530

1200
UP UP

Stantec UK Limited, Box : 207312, 9th Floor,


1000 Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:

CONSTRUCTION OF TERMINAL
MECHANICAL

ACCESS PLATFORM FOR ACCESS PLATFORM FOR


OPERATION VALVE MAINTENANCE OPERATION VALVE MAINTENANCE SEWAGE PUMPING STATION AT
REFER DRAWING C823-P03-STN-ME-2122
FOR PIPE WORK
DOHA NORTH STW PACKAGE 3
G G
17000 C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

PUMP STATION BASE LEVEL


EQUIPMENT LAYOUT
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

KEY PLAN
NOTES
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN
24600 METERS UNLESS SHOWN OTHERWISE.
ELECTRICAL CABLE TRAY, 2. REFER DRAWINGS C823-P03-STN-ME-0026 FOR MECHANICAL
REFER ELECTRICAL DRAWINGS GENERAL NOTES.
FOR DETAILS 3. REFER TO RESPECTIVE DISCIPLINE DRAWINGS FOR DETAILS OF
INSTRUMENTATION, ELECTRICAL, HVAC, FIRE DETECTION AND
PROTECTION AND CCTV.
4. REFER CIVIL DRAWINGS FOR DIMENSION AND OTHER DETAILS OF
VARIOUS CHAMBERS AND DRY WELL.
5. DETAILS OF STRUCTURAL COMPONENTS ARE SHOWN
REPRESENTATIVE, REFER STRUCTURAL DRAWINGS FOR DETAILS.
6. ELEVATION LEVELS SHOWN ON WET WELL SIDE ARE TOP OF
PASSENGER SLAB LEVELS, FOR BENCHING LEVELS REFER TO CIVIL DRAWINGS
LIFT REST ROOM
C B C823-P03-STN-CV-2126 AND 2127. C

3885
ME-2112 7. REFER TO CIVIL DRAWINGS C823-P03-STN-CV-2112 AND 2113 FOR

4100
SIZES OF ACCESS OPENINGS.
DRY WELL -3.650
-3.560
-3.560
-3.560 FIRE -3.560
-3.560
STAIRCASE

UP
P-0230
UP
930 DRY WELL MAIN
PUMP (TYP)
REFER CIVIL DRAWING
5300
C823-P03-STN-CV-2111
FOR WALL THICKNESS -2.530
SCR-0210

6767
7100 SL-0212 2200 WET WELL NO 2 -1.235
P-0240
MECHANICAL
D GRAB SCREEN 2 D
SG-0011 SL-0211 SG-0212
FOR DETAILS OF (STANDBY)

WET WELL DISTRIBUTION


INCOMMING PIPE REFER SG-0213 -5.700
TO DRAWING CV-1081
500x500 MOTORISED P-0250

CHAMBER NO 2
SG-0211 PENSTOCK STAIRCASE

5000
(FUTURE)
P-0220
SG-0036

24000
1000
SCREEN CHAMBER NO 2
SG-0031

P-0040
ISSUED FOR CONSTRUCTION
6000 3600
-4.506
5300

A INLET CHAMBER DRY WELL -4.520


-4.257 SG-0035 CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
ME-2112 SUMP PUMP
-3.800 Rev. Date Revision Details Drawn Chkd Appd
P-0045 (FUTURE)
E -4.250 SG-0030 E

WET WELL DISTRIBUTION


SCREEN CHAMBER NO 1 P-0150
WET WELL
TRANSFER PUMP
P-0120
CHAMBER NO 1
P-0140 2300

SG-0113 1200
2 NOS DN1000 RCC SG-0010 SL-0111 SG-0111 SCR-0110 SG-0112
PIPE WITH GRP LINING MECHANICAL
1000x1000 MOTORISED 1000x1000 P-0130
INCOMING GRAVITY GRAB SCREEN 1
PENSTOCK (TYP) STOPLOG (TYP) SL-0112 WET WELL NO 1
SEWER (DUTY)
F
DESIGNS DEPARTMENT F

Design Consultant :
-1.235
6000 -2.530

1200
UP UP

Stantec UK Limited, Box : 207312, 9th Floor,


1000 Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:

CONSTRUCTION OF TERMINAL
MECHANICAL

ACCESS PLATFORM FOR ACCESS PLATFORM FOR


OPERATION VALVE MAINTENANCE OPERATION VALVE MAINTENANCE SEWAGE PUMPING STATION AT
REFER DRAWING C823-P03-STN-ME-2122
FOR PIPE WORK
DOHA NORTH STW PACKAGE 3
G G
17000 C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

PUMP STATION BASE LEVEL


EQUIPMENT LAYOUT
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2101 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

B
SG-0213
ME-2112
WET WELL
DISTRIBUTION CHAMBER 2
A A

SG-0031
1000x1000 STOPLOG

1000x1000 MOTORISED
SL-0211 PENSTOCK

1000
SCREEN CHANNEL NO. 2 -4.250

5000
KEY PLAN

3500
-4.175

1000
SG-0211 SCR-0210 SG-0212 NOTES
B B
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
TO BE FILLED WITH SL-0212 1000x1000 MOTORISED OTHERWISE.

1900
MASS CONCRETE PENSTOCK 2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
-4.175 SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
SL-0112
SG-0030 BY CONTRACTOR.
3. SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
A THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
SG-0111 SCR-0110 SG-0112
ME-2112 RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
SPECIFICATION.

5000
-4.250 4. CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
SCREEN CHANNEL NO. 1
COMMENCEMENT OF WORK AT SITE.
5. VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
C MECHANICAL GRAB CONTRACTOR PRIOR TO CONSTRUCTION. C
SL-0111
SCREEN (TYP. OF 2) SG-0113 6. TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
2200 MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
9600 FINALISED
7. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
NECESSARY APPROVALS AND PERMITS FROM PWA AND
WET WELL OTHER COMPETENT AUTHORITIES.
DISTRIBUTION CHAMBER 1 8. PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
WITH REQUIRED SUPPORTING ARRANGEMENT.
9 INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
D SCREEN DISTRIBUTION CHAMBER PLAN AT CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER
REQUIREMENTS.
D

EL -5.000 10. THE OPENING SHOWN FOR SCREENS ARE INDICATIVE AND MAY
CHANGE AS PER SUPPLIER REQUIREMENTS.
11. REFER DRAWING C823-P03-STN-ME-2301 AND 2302 FOR TAG
NUMBERS OF EQUIPMENT.
WASHER AND COMPACTOR 1 12. TOP OF SCREEN BARS TO BE MINIMUM 1m ABOVE TOP OF
(DUTY) WATER LEVEL
B
ME-2112

WASHER AND COMPACTOR 2


MECHANICAL GRAB SCREEN SCR-0110; SCR-0210
ISSUED FOR CONSTRUCTION
(STANDBY) WIDTH OF CHANEEL 1000mm
ACCESS COVER AT GRAB 27.700 CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
Rev. Date Revision Details Drawn Chkd Appd
SCREEN TO HAVE AUTO CLEAR BAR SPACING 46.11mm
E OPEN/CLOSE MECHANISM SCREW CONVEYOR 2 E
DURING GRAB OPERATION. (STANDBY) NUMBER OF BARS 17
COVER TO BE CLOSED SKIP
NORMALLY, TYPICAL OF 2 BAR WIDTH 10mm

MATERIAL OF CONSTRUCTION SS31G S31

BAR PROFILE RECTANGULAR

MECHANICAL
GRAB SCREEN 2
(STANDBY)

F A FFL +29.000
DESIGNS DEPARTMENT F
ME-2112 FFL +29.000 Design Consultant :

MECHANICAL
GRAB SCREEN 1
(DUTY)
Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
SCREEN CHANNEL Project Name:
(UPSTREAM) ACCESS SCREW CONVEYOR 1 CONSTRUCTION OF TERMINAL
MECHANICAL

OCU CHAMBER (DUTY)


SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
RAIL FOR OVERHEAD SCREEN CHANNEL Project Code:
CRANE (DOWNSTREAM) PA 2020 C 009 G
ACCESS Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

PUMP STATION
GRAB SCREEN PLAN
Drawn: Checked:
GROUNG FLOOR PLAN Designed:
A. MANE
Approved:
N. NAMBIARUVEETTIL

H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2111 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

B
SG-0213
ME-2112
WET WELL
DISTRIBUTION CHAMBER 2
A A

SG-0031
1000x1000 STOPLOG

1000x1000 MOTORISED
SL-0211 PENSTOCK

1000
SCREEN CHANNEL NO. 2 -4.250

5000
KEY PLAN

3500
-4.175

1000
SG-0211 SCR-0210 SG-0212 NOTES
B B
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
TO BE FILLED WITH SL-0212 1000x1000 MOTORISED OTHERWISE.

1900
MASS CONCRETE PENSTOCK 2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
-4.175 SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
SL-0112
SG-0030 BY CONTRACTOR.
3. SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
A THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
SG-0111 SCR-0110 SG-0112
ME-2112 RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
SPECIFICATION.

5000
-4.250 4. CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
SCREEN CHANNEL NO. 1
COMMENCEMENT OF WORK AT SITE.
5. VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
C MECHANICAL GRAB CONTRACTOR PRIOR TO CONSTRUCTION. C
SL-0111
SCREEN (TYP. OF 2) SG-0113 6. TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
2200 MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
9600 FINALISED
7. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
NECESSARY APPROVALS AND PERMITS FROM PWA AND
WET WELL OTHER COMPETENT AUTHORITIES.
DISTRIBUTION CHAMBER 1 8. PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
WITH REQUIRED SUPPORTING ARRANGEMENT.
9 INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
D SCREEN DISTRIBUTION CHAMBER PLAN AT CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER
REQUIREMENTS.
D

EL -5.000 10. THE OPENING SHOWN FOR SCREENS ARE INDICATIVE AND MAY
CHANGE AS PER SUPPLIER REQUIREMENTS.
11. REFER DRAWING C823-P03-STN-ME-2301 AND 2302 FOR TAG
NUMBERS OF EQUIPMENT.
WASHER AND COMPACTOR 1 12. TOP OF SCREEN BARS TO BE MINIMUM 1m ABOVE TOP OF
(DUTY) WATER LEVEL
B
ME-2112

WASHER AND COMPACTOR 2


MECHANICAL GRAB SCREEN SCR-0110; SCR-0210
ISSUED FOR CONSTRUCTION
(STANDBY) WIDTH OF CHANEEL 1000mm
ACCESS COVER AT GRAB 27.700 CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
Rev. Date Revision Details Drawn Chkd Appd
SCREEN TO HAVE AUTO CLEAR BAR SPACING 46.11mm
E OPEN/CLOSE MECHANISM SCREW CONVEYOR 2 E
DURING GRAB OPERATION. (STANDBY) NUMBER OF BARS 17
COVER TO BE CLOSED SKIP
NORMALLY, TYPICAL OF 2 BAR WIDTH 10mm

MATERIAL OF CONSTRUCTION SS31G S31

BAR PROFILE RECTANGULAR

MECHANICAL
GRAB SCREEN 2
(STANDBY)

F A FFL +29.000
DESIGNS DEPARTMENT F
ME-2112 FFL +29.000 Design Consultant :

MECHANICAL
GRAB SCREEN 1
(DUTY)
Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
SCREEN CHANNEL Project Name:
(UPSTREAM) ACCESS SCREW CONVEYOR 1 CONSTRUCTION OF TERMINAL
MECHANICAL

OCU CHAMBER (DUTY)


SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
RAIL FOR OVERHEAD SCREEN CHANNEL Project Code:
CRANE (DOWNSTREAM) PA 2020 C 009 G
ACCESS Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

PUMP STATION
GRAB SCREEN PLAN
Drawn: Checked:
GROUNG FLOOR PLAN Designed:
A. MANE
Approved:
N. NAMBIARUVEETTIL

H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SCALE 1 : 100 CONTRACT
m1 0 10 m Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2111 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

NOTES
1. ALL DIMENSIONS IN MILLIMETERS UNLESS INDICATED
OTHERWISE.
2. ALL PIPE DIAMETER ARE NOMINAL AND ARE IN MILLIMETER.
SCREENING COMPACTOR SHALL BE PROVIDED AND INSTALLED
A BY CONTRACTOR. A
SCREENING SYSTEM SHALL BE A MECHANICAL GRAB TYPE.
3. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL
RELEVANT DESIGN AND SPECIALISTS DRAWING AND THE
4. SPECIFICATION.
CONTRACTOR TO CONFIRM ALL DIMENSIONS PRIOR TO
5. COMMENCEMENT OF WORK AT SITE.
VENDOR SUPPLIED ITEMS SHOWN ARE TENTATIVE, TO BE
6. CONFIRMED AFTER RECEIPT OF VENDOR DRAWING BY
CONTRACTOR PRIOR TO CONSTRUCTION.
TOLERANCE ON CIVIL ELEMENT FOR INSTALLATION FOR
+40.450 7. MECHANICAL EQUIPMENT TO BE CONFIRMED ONCE SUPPLIER IS
FINALISED
8. CONTRACTOR IS RESPONSIBLE TO PROCESS AND RECEIVE
B NECESSARY APPROVALS AND PERMITS FROM PWA AND B
OTHER COMPETENT AUTHORITIES.
9 PIPE WORK FOR WASH WATER AND SCREEN COMPACTOR
DRAIN SHOWN IS INDICATIVE. CONTRACTOR TO SIZE, ROUTE
OVERHEAD CRANE SWL - 2.5 TON AND INSTALL THE PIPE WORK TO SUITE SITE CONDITIONS
10. WITH REQUIRED SUPPORTING ARRANGEMENT.
INTERMEDIATE SUPPORT FOR GUIDE TRACK MAY CHANGE
DEPENDING ON SCREEN SUPPLIERS RECOMMENDATION.
+35.200 +35.200
11. SCREEN INSTALLATION DETAILS SHOWN ARE INDICATIVE.
+35.200 CONTRACTOR TO CONFIRM THE DETAILS AS PER SUPPLIER

CLEAR LIFTING HEIGHT


REQUIREMENTS.
12. THE OPENING SHOWN FOR SCREENS ARE INDICATIVE AND MAY

CLEAR LIFTING HEIGHT


SCR-0210 SCR-0110 CHANGE AS PER SUPPLIER REQUIREMENTS.
SCREEN MAINTENANCE
SCR-0110 REFER DRAWING C823-P03-STN-ME-2301 AND 2302 FOR TAG
C PLATFORM MECHANICAL MECHANICAL C
1010 NUMBERS OF EQUIPMENT.
GRAB SCREEN 2 GRAB SCREEN 1

6565

6565
COM-0108 MAN BASKET ENTRY SG-0030 13. CONTRACTOR SHALL PROVIDE SUFFICIENT SPACE FOR
REMOVABLE FOR ACCESS INSTALLATION OF PENSTOCKS DURING CONSTRUCTION AND
SG-0011 SL-0111 SKIP BENCHING AND GRP LINING SHALL BE SUITABLY CORRECTED
SAFETY CHAIN
(TYP) SG-0113 AS PER FINAL DESIGN AFTER PENSTOCK INSTALLATIONS.

FFL +29.000 FFL +29.000


FGL +28.300

CON-0209 COM-0108
SG-0035
SG-0111 WASHER COMPACTOR

D CON-0209 D
SCREW CONVEYOR OCU CHAMBER

SG-0112
STOPLOG GUIDE MAN ACCESS BASKET
TRACK (600x600)MIN

ISSUED FOR CONSTRUCTION


CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
Rev. Date Revision Details Drawn Chkd Appd

E 300mm THICK E
PENSTOCK SPINDLE
CONCRETE WALL
SUPPORT (TYP)

GUIDE TRACK SUPPORTED


BY VERTICAL WALL

INTERMEDIATE SLAB

FFL +5.320

CLEAR OPENING
7100 6000 3600 2200 6000 1000
F FFL +5.320 INTERMEDIATE SLAB DESIGNS DEPARTMENT F
1000x1000 MOTORISED 1000x1000 1000x1000 TWL +5.000
500x500 Design Consultant :
PENSTOCK STOPLOG STOPLOG
MOTORISED 1900
PENSTOCK

Stantec UK Limited, Box : 207312, 9th Floor,


TO BE FILLED WITH Al Mana Tower, C Ring Road, Doha-Qatar,
MECHANICAL OCU DUCT PIT CEMENT MORTOR Tel : (+974) 44804622 Fax : (+974) 44368694
DN1000 RCC PIPE GRAB SCREEN 1000x1000 -0.500 m MAX WATER LEVEL Project Name:
WITH GRP LINING
CONSTRUCTION OF TERMINAL
MOTORISED
INCOMING GRAVITY
MECHANICAL

1000x1000 PENSTOCK GRAB SCREEN FRAME


SEWER
-3.500
MOTORISED
PENSTOCK DRY
TWL -0.500 AND GUIDE TRACK SEWAGE PUMPING STATION AT
-2.500 m MIN WATER LEVEL
WELL DOHA NORTH STW PACKAGE 3
G -3.575 G
-3.500 -3.775 -3.875
LWL -2.500
C823/3
Project Code:
-4.820 TOP OF BENCHING PA 2020 C 009 G
-3.625 Drawing Title:
TOC -4.250
SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

BENCHING DETAILS SHOWN ARE


APPROXIMATE, REFER TO CIVIL DRAWINGS FLOW PUMP STATION
WET WELL SPLITTER
C823-P03-STN-CV-2126 AND 2127 FOR
DETAILS
INLET CHAMBER SCREEN CHAMBER
CONCRETE
SCREEN FRAME GRAB SCREEN SECTION
INLET CHAMBER WET WELL Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL

H
FLUSHING PIPEWORK DISTRIBUTION CHAMBER SLAB
SECTION B Designed:
S. DESHMUKH
Approved:
K. PEZHGORSKI H
(SCALE 1 : 100) ME-2101
Date: Scale:
APRIL 2019 1 : 100 (ON A1)
Status:
SECTION A SCALE 1 : 100 CONTRACT
ME-2101 m1 0 10 m Drawing Number: Revision:
(SCALE 1 : 100)
File Name-

C823-P03-STN-ME-2112 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

NOTES
1. THIS IS GRAPHICAL REPRESENTATION FOR ILLUSTRATION
PURPOSE ONLY. REFER TO OTHER RELEVANT DRAWINGS FOR
DIMENSIONS AND OTHER DETAILS.
A A

+40.450

B B

INTERMEDIATE SLAB

COM-0208 SCR-0210 SCR-0110

+5.270
COM-0108

C C

+29.000
SG-0211

D D
SCR-0210

ISSUED FOR CONSTRUCTION


CA 24FEB21 ISSUED FOR CONTRACT AM SK KP
Rev. Date Revision Details Drawn Chkd Appd

E E

F
DESIGNS DEPARTMENT F

Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:

CONSTRUCTION OF TERMINAL
MECHANICAL

SEWAGE PUMPING STATION AT


DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

PUMP STATION
GRAB SCREEN 3D VIEWS
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
Designed: Approved:
H S. DESHMUKH K. PEZHGORSKI H
Date: Scale:
APRIL 2019 NO SCALE
Status:
CONTRACT
Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2113 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

NOTES
<PIPE AND FITTING SCHEDULE (NEW)> <PIPE AND FITTING SCHEDULE (NEW)> 1. DRAWING TO BE READ IN CONCLUSION WITH MECHANICAL
VALVE SCHEDULE (PHASE 3)
DRAWINGS C823-P03-STN-ME-2122 THRU 2153.
BOM... DESCRIPTION DIA MATERIAL QTY. BOM... DESCRIPTION DIA MATERIAL QTY. VALVE SCHEDULE... DESCRIPTION DIA QTY REMARK
2. CONTRACTOR TO SELECT THE PUMPS TO ACHIEVE THE
A 1 FLANGED BELL MOUTH 600 DI 6 63 2256mm LONG DOUBLE FLANGE PIPE 600 DI 2 ULTIMATE PUMPING CAPACITY OF 1200 LPS WITH BOTH WET A
SPINDLE SHALL BE RISING
2 90 FLANGED BEND 600 DI 8 64 NOT USED MOV-0151; MOV-0251 MOTORISED GATE VALVE 600 2 WELLS AND 4 PUMPS IN OPERATION AND 600 LPS WITH SINGLE
TYPE
WET WELL AND 2 PUMPSIN OPERATION.
3 4485mm LONG DOUBLE FLANGE PIPE WITH IPF 600 DI 6 65 90 FLANGED BEND 80 DI 4

4 DISMANTLING JOINT 600 DI 11 66 750mm LONG DOUBLE FLANGE PIPE 80 DI 2 WITH PROXOMIN SWITCH
NRV-0150; NRV-0250 NON RETURN VALVE 600 2
67 90 FLANGED DUCKFOOT BEND 600 DI 2 AND BALANCING WEIGHT
1000mm LONG DOUBLE FLANGE PIPE WITH 1 Nos OF 15 NB BOSS FOR
5 600 DI 4
PRESSURE INSTRUMENT 68 310mm LONG FLANGE PLAIN END PIPE 80 DI 2
SPINDLE SHALL BE RISING
6 ECCENTRIC REDUCER 600x400 DI 4 69 1130mm LONG FLANGE PLAIN END PIPE 80 DI 2 MOV-0152; MOV-0252 MOTORISED GATE VALVE 450 2
TYPE
7 CONCENTRIC REDUCER 350x450 DI 4 70 2148mm LONG DOUBLE FLANGE PIPE WITH IPF 600 DI 2

8 DISMANTLING JOINT 450 DI 12 71 BLIND FLANGE 300 DI 2


B B
784mm DOUBLE FLANGE PIPE WITH 1 Nos. OF 15NB BOSS FOR PRESSURE 72 457mm LONG FLANGE PLAIN END PIPE 80 DI 2 PIPE AND FITTING SCHEDULE (PHASE 3)
9 450 DI 4
INSTRUMENT.
73 DISMANTLING JOINT 80 DI 2 BOM DESCRIPTION DIA MATERIAL QTY.
10 540mm LONG DOUBLE FLANGE PIPE 450 DI 4 74 DISMANTLING JOINT 300 DI 6 4 DISMANTLING JOINT 600 DI 2
11 3220mm LONG DOUBLE FLANGE PIPE 450 DI 2 75 1124mm LONG DOUBLE FLANGE PIPE 300 DI 2 1000mm LONG DOUBLE FLANGE PIPE WITH 1 Nos OF 15 NB
5 600 DI 2
BOSS FOR PRESSURE INSTRUMENT
12 ALL FLANGED REDUCING TEE 600x450 DI 6 76 1500mm LONG DOUBLE FLANGE PIPE 400 DI 4
6 ECCENTRIC REDUCER 600x400 DI 2
13 BLIND FLANGE 600 DI 4 77 246mm LONG DOUBLE FLANGE PIPE 800 DI 1
14 BLIND FLANGE 450 DI 2 7 CONCENTRIC REDUCER 350x450 DI 2
78 300mm LONG DOUBLE FLANGED PIPE SPOOL PIECE 600 DI 2
15 950mm LONG DOUBLE FLANGE PIPE 600 DI 4 8 DISMANTLING JOINT 450 DI 6
79 REDUCING FLANGE 600x100 DI 2
784mm DOUBLE FLANGE PIPE WITH 1 Nos. OF 15NB BOSS
16 ALL FLANGED REDUCING INVERT LEVEL TEE 600x300 DI 2 80 ALL FLANGED TEE 600 DI 2 9 450 DI 2
C FOR PRESSURE INSTRUMENT. C
17 1460mm LONG DOUBLE FLANGE PIPE 450 DI 2
10 540mm LONG DOUBLE FLANGE PIPE 450 DI 2
18 4000mm DOUBLE FLANGE PIPE 600 DI 1
11 3220mm LONG DOUBLE FLANGE PIPE 450 DI 1
19 2460mm DOUBLE FLANGE PIPE 600 DI 1
VALVE SCHEDULE 17 1460 mm LONG DOUBLE FLANGE PIPE 450 DI 1
20 45 FLANGED BEND 600 DI 2
VALVE TAG NO. DESCRIPTION DIA QTY REMARK 76 1500mm DUBLE FLANGE PIPE 400 DI 2
21 670mm LONG DOUBLE FLANGE PIPE 600 DI 1
MOV-0231; MOV-0241; MOV-0141;
22 5043mm LONG DOUBLE FLANGE PIPE 600 DI 2 MOTORISED GATE VALVE 600 4 SPINDLE SHALL BE RISING TYPE
MON-0131
23 5500mm LONG DOUBLE FLANGE PIPE 600 DI 6

24 5500mm LONG DOUBLE FLANGE PIPE 300 DI 2 NRV-0230; NRV-0240; WITH PROXIMIN SWITCH AND BALANCING
NON RETURN VALVE 450 4
D 25 2940mm LONG DOUBLE FLANGE PIPE 300 DI 1 NRV-0140; NRV-0130 WEIGHT D

26 90 FLANGED BEND 300 DI 8

27 3365mm DOUBLE FLANGE PIPE 300 DI 1 MOV-0232; MOV-0242;


MOTORISED GATE VALVE 450 4 SPINDLE SHALL BE RISING TYPE
MOV-0142; MOV-0132
28 3375mm DOUBLE FLANGE PIPE 300 DI 1
29 ALL FLANGED REDUCING INVERT LEVELTEE 300x80 DI 2
MOTORISED GATE VALVE
MOV-0250; MOV-0150 300 2
30 1540mm LONG DOUBLE FLANGE PIPE 300 DI 2 (ON SPARGE PIPE)

31 300mm LONG DOUBLE FLANGE PIPE 300 DI 2 ISSUED FOR CONSTRUCTION


MOV-0153, MOV-0154, MOV-0155,
MOTORISED GATE VALVE
32 ALL FLANGED REDUCING TEE 300x150 DI 6 MOV-0253, MOV-0254, 150 6 CA 24FEB21 ISSUED FOR CONTRACT
(ON SPARGE PIPE) AM SK KP
MOV-0255 Rev. Date Revision Details Drawn Chkd Appd
33 1397mm LONG DOUBLE FLANGE PIPE 300 DI 2
E E
34 1782mm LONG DOUBLE FLANGE PIPE 150 DI 6 MOTORISED GATE VALVE
MOV-0156, MOV-0256 80 2
35 90 FLANGED BEND 150 DI 24 (SPARGE PIPE, DRAIN PIPE)

36 2300mm LONG DOUBLE FLANGE PIPE WITH IPF 150 DI 6

37 2637mm LONG DOUBLE FLANGE PIPE 150 DI 6 NON RETURN VALVE


NRV-0045, NRV-0040 80 2
(DRAIN PUMP)
38 ALL FLANGED TEE 150 DI 6

39 445mm LONG DOUBLE FLANGE PIPE 150 DI 12


MOTORISED GATE VALVE
MOV-0041, 0042, 0043, 0044 80 4
40 1424mm LONG DOUBLE FLANGE PIPE 150 DI 12 (DRAIN PUMP)

41 45 FLANGED BEND 150 DI 12

F
42 975mm LONG DOUBLE FLANGE PIPE 150 DI 12 VRV-0171, 0271 VACUUME RELIEF VALVE 100 2 DESIGNS DEPARTMENT F

43 FLANGED REDUCER 150x100 DI 12 Design Consultant :

44 885mm LONG DOUBLE FLANGE PIPE 80 DI 2


GV-0171, 0271 MANUAL GATE VALVE 100 2
45 ALL FLANGED TEE 80 DI 2

46 195mm LONG DOUBLE FLANGE PIPE 80 DI 1 Stantec UK Limited, Box : 207312, 9th Floor,
Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
47 355mm LONG DOUBLE FLANGE PIPE 80 DI 2
Project Name:
48 90 FLANGED BEND 80 DI 6
CONSTRUCTION OF TERMINAL
MECHANICAL

EQUIPMENT SCHEDULE
49 250mm LONG DOUBLE FLANGE PIPE 80 DI 2
EQUIPMENT TAG NO DESCRIPTION QTY
SEWAGE PUMPING STATION AT
50 3060mm LONG DOUBLE FLANGE PIPE 80 DI 2
DOHA NORTH STW PACKAGE 3
G G
51 2235mm LONG DOUBLE FLANGE PIPE WITH IPF 80 DI 2 P-0140; P-0130;
P-0230; P-0240,
DRY WELL MAIN PUMPS
300 LPS @44.40m HEAD
4 C823/3
52 CONCENTRIC REDUCER 200x100 DI 2 Project Code:
53 3750mm LONG DOUBLE FLANGE PIPE 200 DI 1 PA 2020 C 009 G
DRY WELL MAIN PUMPS Drawing Title:
54 3500mm LONG DOUBLE FLANGE PIPE 200 DI 1 P-0150, P-0250 2 (PHASE 3)
55 90 FLANGED BEND 200 DI 3
300 LPS @44.40m HEAD SHEEHANIYA TERMINAL PS
56 1745mm LONG DOUBLE FLANGE PIPE WITH IPF 200 DI 1
MECHANICAL
BIM 360://64500094_AL_Sheehaniya/C823-M-PUMP.rvt

57 1920mm LONG DOUBLE FLANGE PIPE WITH IPF 200 DI 1


P-0040; P-0045
DRY WELL DRAIN PUMP
7LPS @7.24m HEAD
2 PUMP STATION
58 3500mm LONG DOUBLE FLANGE PIPE 200 DI 1 PIPEWORK - BOM
Drawn: Checked:
A. MANE N. NAMBIARUVEETTIL
59 3230mm LONG DOUBLE FLANGE PIPE 200 DI 1 WET WELL TRANSFER PUMPS
P-0220; P-0120 2 Designed: Approved:
H 46.4 LPS @8.47m HEAD S. DESHMUKH K. PEZHGORSKI H
60 4240mm LONG FLANGE PLAIN END PIPE 200 DI 1
Date: Scale:
APRIL 2019 NTS
61 ALL FLANGED TEE 200 DI 2
Status:
62 3745mm LONG FLANGE PLAIN END PIPE 200 DI 1 CONTRACT
Drawing Number: Revision:
File Name-

C823-P03-STN-ME-2121 CA
1 2 3 4 5 6 7 8 9 10 11 12
4-Technical Data sheet
PROJECT DATA
SHEET
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS

12. STOPLOG DATASHEET

* - Indicates default requirement


Sr. No. Description Design Requirements Vendor Compliance Remarks
1 TAG NO/ASSET CODE (P) SL-0111/ SL-0211/ SL- SL-0111/ SL-0211/ SL-
0112/ SL-0212 0112/ SL-0212
2 General
3 Equipment Type () (P) Stop gate Stop Log
4. OPERATING ENVIRONMENT/SITE DETAILS
5. Operating Environment (P) Noted
6. Location () Coastal, Inside Noted
7. Ambient temperature Range (°C) Noted
8. Minimum/maximum 5 / 50 Noted
9. Ambient Relative Humidity maximum (%) 1000 Noted
10. EMC Environment () Class B - light industrial Noted
11. Hazardous Area Classification () Zone 1 Noted
12. Special Environmental Hazards (P) TBC by Contractor
13. References for Further Information (P) TBC by Contractor
14. PROCESS FLUID DETAILS AND SYSTEM
HEADS
15. Process Fluid Details
16. Type of Process Fluid () (P)
17. Wastewater (unscreened)  Noted & Comply
18. Wastewater (screened)  Noted & Comply
19. System Heads
20. Stop gates, Stoplogs and Hand stops Stop Log
21. Maximum Static Head (m) (P) Refer Penstock Schedule Comply, As per schedule
22. PERFORMANCE REQUIREMENTS
23. General (All Equipment)
24. Equipment Service Life (Years) (P) 20 Subject to proper O&M
25. Leakage Rates As per design

PROJECT ID: PA 2020 C 009 G Volume 3: Appendix P-1 10 Rev 0


Construction of Terminal Sewage Pumping Station at Doha North STW Package 3 – C823/3
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS

Sr. No. Description Design Requirements Vendor Compliance Remarks


26. Penstocks and Stop gates
27. Expected Leakage Rate (P/S) To be informed later
28. Data required (Y/N) (P) Y GA Drawings, Catalogue,
Calculations, Compliance &
datasheet is submitted.
29. Leakage rate (l/min.m) (S) As per QCS As per design
30. Operating Function, Frequency and Speed
(Penstocks)
31. Operating Function () (P) Isolating Noted
32. Expected No. of Operating Cycles per Year TBC by contractor Contractor to comply
(Isolating Duties) (P)
33. Expected No. of Starts per Year (Control Duties) TBC by contractor Contractor to comply
(P)
34. Door Speed (mm/min) (P) TBC by contractor N/A here. It depends upn
site operation.
35.
36. Life Cycle Costs (Stoplog)
37. Service Lives and Costs of Components Contractor to comply
38. Costs of Components (QAR) and Time Required TBC by contractor Spare list is already
to Replace Components (hrs) (S) provided
39. Component Cost Time
40. Nut Not Applicable
41. Stem Not Applicable
42. Seals (rigid) Not Applicable
43. Seals (resilient) N/A
44. DESIGN REQUIREMENTS OK
45. All Equipment
46. General
47. Equipment Reference (S) QCS 2014, Section 8, Noted For Applicable Clauses.
Part 5 Refer compliance sheet
48. Weights and Lifting Arrangements

PROJECT ID: PA 2020 C 009 G Volume 3: Appendix P-1 11 Rev 0


Construction of Terminal Sewage Pumping Station at Doha North STW Package 3 – C823/3
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS
49. Complete Equipment (kg) (S) Stop Log assembly with
frame is appx. 1790 Kgs.
This is tentative weight and
may vary after
manufacturing.
50. Heaviest Maintenance Lift (kg)(S) TBC by contractor Noted Refer to appx. weight
above.
51. Heaviest Erection Lift (kg) (S) TBC by contractor Erection list capacity is not Contractor to comply
our scope.
52. Lubrication If required shall be
provided
53. Capacity/Life of Dispenser (cc/months) (Y/N) TBC by contractor Noted Subject to proper O&M.
(P/S)
54. Identification Plate and Asset Reference Label Noted Name Plate shall be
provided
55. Asset Reference Label Required (Y/N) (P) TBC by contractor Noted Name Plate shall be
provided
56. Information Required on Asset Reference Label TBC by contractor IOM Manual shall be
and Method of Fixing (P) provided for installation of
penstock.
57. Information to be Provided
58. Material and Standards Certification Required at Y Comply Yes, material certifications
Time of Order (Y/N) (P) shall be provided.
59. O & M Manuals Comply IOM Manuals shall be
provided.
60. Reference for Purchaser’s O & M Manual TBC by contractor Comply
Specification (P)
61. Miscellaneous
62. Installation Fixtures and Fittings Required (Y/N) TBC by contractor N/A Stop Logs are side wall
(P) embedded type.
63. Stoplog Systems
64. Channel mounted (rebated)  Yes Side Wall Embedded
65. Wall mounted  No Side Wall Embedded
66. Channel/Wall Aperture Size (P) Comply, As per schedule
(BOQ)

PROJECT ID: PA 2020 C 009 G Volume 3: Appendix P-1 12 Rev 0


Construction of Terminal Sewage Pumping Station at Doha North STW Package 3 – C823/3
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS
67. Width (mm) Refer Penstock Schedule Comply, As per schedule
(BOQ)
68. Height (mm) Refer Penstock Schedule Comply, As per schedule
(BOQ)
69. Stoplog Size (S) Comply, As per schedule
(BOQ)
70. Width (mm) Refer Penstock Schedule Comply, As per schedule
(BOQ)
71. Height (mm) Refer Penstock Schedule Comply, As per schedule
(BOQ)
72. Number of Stoplogs Required (S) 4 4 01 nos. for each location.
73. Stoplog System Component Materials (P/S)
74. Frame Stainless steel Grade Stainless steel Grade 316
316 L L
75. Logs Stainless steel Grade Stainless steel Grade
316 L 316 L
76. Side Seals EPDM EPDM
77. Interlog Seals EPDM EPDM
78. Log lifting Points TBC by Contractor Yes Yes, lifting pins
79. Lifting System Components TBC by Contractor Lifting Beams
80. Lifting System Required (Y/N) (P) Lifting beam provided for
stop logs. However, lifting
arrangement at site to be
arranged by the client.
81. Type of Lifting System Required/Provided (P/S) TBC by Contractor Lifting beam provided for
stop logs. However, lifting
arrangement at site to be
arranged by the client.
82. Reference for Purchaser’s Lifting System QCS 2014;Section 8; Comply Refer to QCS compliance.
Specification (P) Part 5
83. Storage Rack Required (Y/N) (P) TBC by Contractor Storage Rack offered. Storage Rack offered.
Notes
1. Please refer drawing number ME-2101, 2113, 6201 for details. Noted.

SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION


PROJECT ID: PA 2020 C 009 G Volume 3: Appendix P-1 13 Rev 0
Construction of Terminal Sewage Pumping Station at Doha North STW Package 3 – C823/3
STATE OF QATAR VOLUME 3: TECHNICAL TENDER DELIVERABLES
ASHGHAL APPENDIX Q - 1 – MECHANICAL DATA SHEETS
Clause Supplementary Information

PROJECT ID: PA 2020 C 009 G Volume 3: Appendix P-1 14 Rev 0


Construction of Terminal Sewage Pumping Station at Doha North STW Package 3 – C823/3
TECHNICAL DATA
SHEET FOR
STOPLOG
JASH ENGINEERING LIMITED
Address: Office: 31 Sector - C, Industrial Area, Sanwer Road, Indore 452 015 M.P. INDIA.
Factory: Plot No. M-19, SEZ Phase II, Misc. Zone, Pithampur-454775, DistDhar M.P., India.
DATASHEET
Date : 17.10.2022
Client Al Raida Engineering & Industrial Services WLL
Project Construction of Terminal Sewage Pumping Station At Doha North STW Package 3 C823/3
Ref. No. JAE-QA-00054
Products Stainless Steel Stop Logs
Location Various
Tag Nos. Various
Quantity Various

S. No. Description Offered

A. Penstock / Sluice Gate


1 Manufacturer Jash Engineering Limited, India
2 Country Of Origin India
3 Design JASH
4 Stop Logs Model No. A-411
5 Stop Log Type Side Wall Embedded Stop Logs
B. Specifications
1 Frame Type Embedded Type
2 Stop Log Type 4-Side Sealing, Single Piece Type
3 Operation Via Lifting Beam
4 Type of Closure Flush Bottom Closure
B. Sluice / Gate Material of Construction
1 Frame, Stop Logs, Lifting Beam Stainless Steel BS EN 10088-2 Grade 1.4401/1.4404 (S.S. Type 316 / 316L) Dual Certified
2 Rubber Seal EPDM ASTM D2000
3 Rubber Seal Retainer Stainless Steel BS EN 10088-2 Grade 1.4401/1.4404 (S.S. Type 316 / 316L) Dual Certified
9 Fastening bolts & nuts Stainless Steel type 316 Material

D. Penstock / Sluice Gate Opening Dimensions

1 Width 1000 mm
2 Height 1000 mm
E. Invert Line of Opening to Platform Distance
1 IL-PL Refer GA Drawings
Penstock / Sluice Gate Designed Water Head
F.
On-Seat & Off-Seat
1 On-Seat Refer GA Drawings
2 Off-Seat Refer GA Drawings

For Jash Engineering Limited


5-Company profile
SUPPLIER
COMPANY PROFILE
COMPANY PROFILE

Corporate background

Al Raida Engineering and Industrial Services WLL(REISCO) is an established company


(since May, 2005) engaged in the marketing of specialized services related to oil and gas
related products, Water Networking, Sewage, Hydro-Thermal, Sanitary, Electro-
Mechanical, Electrical, Heating and Fixing system products. REISCO offers a wide range
of specialized products to a portfolio of Consulting Firms, Engineers and Contractors
attached to development & construction related industries in Qatar.

Operating strategy

REISCO operates in 6 main sub-streams, namely Oil & Gas, Instrumentation, Water
Services, Materials Handling, Civil and Chemicals. These operations are subject to the
overview of qualified and a dedicated service team headed by a Sales Engineer to manage
Oil & Gas production, refining, Petrochemicals, Water distillation & Transmission,
Waste Water Treatment, Power Generation & Transmission, Building Construction and
other Manufacturing Industries.

The end use of products marketed by REISCO have been responsible for execution of
major projects in Qatar with concentrations onto industries Oil, Gas and Water and
Sewage networks.

REISCO claims to have established cordial relationships with constructors responsible


for many major projects in the region and have had a long sustained relationship with
policy making senior officers/authorities of the Qatar Government. Despite the infancy of
operations of the company, REISCO claims to have secured confidence among their
clientele in competitive markets with the aid of select quality products and a sound
supplier base.

REISCO endeavours to position itself among other key players in the industry with the
aid of a comprehensive, up-to-date and thorough knowledge base of markets engaged.
Our efforts are reinforced with the aid of a management policy for aggressive pursuit of
an enhanced market share and flexibility in approach to adopt and response to dynamics
of markets and demand conditions.

MISSION:

To be a Reliable, responsible & recognized partner in the economic progress of the


region by providing environmental friendly, safety ensured, innovative, cost effective
and value added products & services to our Customers

P O Box 24875, Doha, Qatar


Tel: +974-4329001 Fax: +974-4329008 Email: sales@alraida.com
www.alraida.com
VISION:

To be a Leading Provider of Advanced technology engineering solutions to a


regional/Global Network of Principals and Customers

Product range of REISCO

The following is a highlight on the platter of products on offer from M/s REISCO.

Key products of REISCO are,

1. Metalska Industrija Varazdin Croatia- Valves


2. Unijoint BV, Netherlands- DI fittings
3. Platform Access Flooring UK- Raised Floors
4. Buzon pedestals International, Belgium- Slope correcting pedestals for roof and
gardens
5. Amtrad Environmental, Belgium-Deodorisers
6. Toyo Valves, Japan- HVAC Valves
7. Bartec GmbH, Germany- Explosion proof Electrical Fittings
8. General Instruments Consortium, India-Instrumentation products
9. Macoga, Spain – Expansion Joints
10. Centertech, Germany- Valves
11. Virgo Middle East- Valves
12. Penstocks.de-Sluice Gates, telescopic valves
13. Barton Instruments, UK/USA-Recorders, Flow meters, Transmitters for Oil and
Gas.
14. Praher, Austria- PVC valves
15. FNC . Italy-Flame Arrestors, breather valves
16. CLA-Val, Switzerland- Flow and Pressure control valves
17. DEWA, Switzerland-Sludge treatment equipment.
18. General Instruments- Instrumentation products
19. CBI Italy- Flooring and Partitions
20. Composan, Spain- Bridge Expansion Joints

Other products supplied by REISCO for Value added Services

1. Nuts and Bolts ( In all Material)


2. Rubber Gaskets( All type of Rubber)
3. Pipeline Line Plugs
4. Manhole Covers, Gulley gratings of different materials and custom design
5. GRP Fittings and liners
6. HDPE Pipe Fittings
7. SS & GI Pipes and Fittings
8. Pipe Line Inspection Services
9. HVAC and Fire Fighting valves and fittings.

P O Box 24875, Doha, Qatar


Tel: +974-4329001 Fax: +974-4329008 Email: sales@alraida.com
www.alraida.com
The noted products are being marketed by REISCO to it’s end users, namely Qatar
Petroleum, Qatar Gas, QAPCO, QAFAC, RAS GAS, ASHGHAL, KAHRAMAA etc.
These products are also in demand for state sponsored projects of the government of
Qatar.

Among related products-Raised floors, Explosion proof Electrical fittings,


Instrumentation products, Fittings, Metal Fittings, Deodorizers, HVAC valve and fittings
has contributed with favorable Client responses and significant turnovers to REISCO.
These products claim to be of proven quality and are claimed to be sourced from reliable
manufactures of European, British and Japanese origin.

The product range of REISCO caters to the construction industry, water network pipeline,
sewage treatment plants and also the natural gas industry in Qatar. Most of the products
offered by REISCO are sourced for end use in major projects of Qatar.

Supplier chain

Commenting on REISCO’s profile of key suppliers, with specific references to M/s


Metalska Industrija Varazdin (for supply of valves-this product is presently being
marketed by REISCO’s parent entity M/s Blue Star International)

Products from this vendor has received approval of KAHRAMAA and Drainage
Department for end use in their projects.

Present and prospect client portfolio of REISCO

1. Qatar Petroleum (QP)*


2. Occidental,
3. Maersk
4. Totalfina Elf
5. Qatar Petroleum Development Corporation (QPDC)
6. Qatar Gas,
7. RasGas
8. Exxon Mobil
9. Dolphin
10. Qatar Fertilizer Company (QAFCO)
11. National Oil Distribution Company (NODCO)
12. Qatar Petrochemical Company (QAPCO)
13. Ras Abu Fontas Power and Water Desalination Plant
14. Qatar Steel Company (QASCO)
15. QATALUM
16. Qatar Vinyl Company (QVC) & Qatar Fuel Additives Company (QAFAC)
17. KAHRAMAA (Qatar Electricity and Water Corporation)*
18. ASHGHAL- (Drainage Department)*

P O Box 24875, Doha, Qatar


Tel: +974-4329001 Fax: +974-4329008 Email: sales@alraida.com
www.alraida.com
19. QGWEC, All Local and International Contractors working in the territory*
20. Al Jaber Engineering*
21. Qatar Building Company*
22. Darwish Engineering*
23. NICC*
24. Al Huda Engineering Works*
25. Torishima Pumps*
26. Al Waha Trading & Contracting Company*
27. Boom Construction Company*
28. Gulf House of Trade and Contracting Company*
29. Marubeni Corporation*
30. Tubin Construction*
31. Degremont Suez*
32. Burhan. International*
Note
* Clients presently in portfolio.

Service uniqueness and related trade strengths-as perceived by REISCO

Technical expertise, total market coverage, package supply, timely response and back up
service are considered to be key areas and efforts differentiating the product and service
range on offer from REISCO vis-a-vis it’s competitors. We endeavour to continuously
improve our service delivery channels whilst being concerned to update the production
technology of products available for projects and related standards to uphold
maintenance.

Besides the technically qualified and experienced staff, local partners play a distinctive
role in actively promoting trade operations of REISCO in Qatar.

Market expansion strategies

REISCO plans to branch out and expand it’s market base. Prospect markets in Kuwait
and Oman has attracted REISCO’s specific attention. Client is presently in the process of
entertaining negotiations to venture into the prospect markets with independent profit and
cost centers.

REISCO also contemplates to outsource the supply and installation of their specialized
product range to select subcontractors. They however opt to retain an alternate strategy to
entertain Client orders via direct supplies from main contractor or by RIESCO itself. This
option would require REISCO to initiate their own and independent maintenance unit to
upkeep with the quality of services on offer and improve related business activities with
minimal disruptions. On an overall they expect to streamline related business processes
with the supply department via established active links.

P O Box 24875, Doha, Qatar


Tel: +974-4329001 Fax: +974-4329008 Email: sales@alraida.com
www.alraida.com
MANUFACTURER
COMPANY PROFILE
COMPANY PROFILE OF JASH ENGINEERING LIMITED
1. Name & Address: JASH ENGINEERING LIMITED
31, Sector ‘C’ Sanwer Road Industrial Area,
INDORE-452 015, Madhya Pradesh, INDIA.
Phone:+91-731-673 2700 / 272 0143
Fax: +91-731-272 0499
Email: info@jashindia.com
Website: www.jashindia.com
Legal Form: Public Ltd.

2. Subsidiary Companies:  JASH USA INC


Office: 5236 Roanoke Drive,
Weldon Spring, Missouri 63304, USA.
Phone: (636) 284-8349
Fax: (832) 476-8653
Email: dniblett@jashusa.com
Website: www.jashusa.com

 SHIVPAD ENGINEERS PVT. LTD.


7, 2nd Main Road, Nehru Nagar,
Adyar, Chennai-600 020, India.
Phone: +91-44-24919052 / 52187980
Fax: +91-44-24915342
Email: shivpad@md2.vsnl.net.in
shivpad@touchtelindia.net
Website: www.shivpad.com

3. Year of Establishment:  1972: Proprietary Organization


 1973: Private Limited Company
 1994: Limited Company

4. Name Of Directors:  Mr. L. D. Amin – Chairman


 Mr. Pratik Patel – Managing Director
 Mr. Axel Schuette – Director
 Mr. Narayanan Shadgopan – Director

5. Registration No. & Date: Factory Act No. 31/5125/IND/2M(I)


Dated: 24.04.1996
Company Act No. 1226 Dated 29.09.1973

6. Bankers Name &  State Bank Of India


Address: Commercial Branch,
Near G.P.O, INDORE – 452 001

7. Year of Commencement  1972: Sluice gates & Bed Plates.


of production Items:  1995: Swing valves & Knife gate valves.
 1999: Double flap valves.
 2000: Butterfly valves.
 2001: Fine bar screens.
 2002: Deep Water Coarse screens.
 2007: Rotating drum screen.
 2009: Sureseal Water hammer control valves.
 2011: Process Equipment like Clariflocculators,
1
Flash Mixers, Degritters, Aerators, Clarifiers,
Thickners, Gravity Decanters, Trickling Filters,
Digester Mixers, DAF Units.

8. Foreign Collaboration: Technical & Financial collaboration:


 SCHUTTE Schuttguttechnik GmbH Anlagenbau,
Iserlohn GERMANY
For manufacturing of Knife Gate, Swing Gate, Double
flap valves

Technical collaboration and associations with:


 Weco Armaturen, GERMANY
For manufacturing of Knife Gate Valves
 Hollung A. S., NORWAY
For manufacturing of Fine & Coarse Screens
 Rehart Gmbh, GERMANY
For manufacturing of Hydro Power Screw Generator
& Archimedean Screw Pumps
 Perrier Sorem, FRANCE
For manufacturing of Suspended Trash Rack Screen
 FSM Frankenberger GmbH & Co, GERMANY
For manufacturing of Filter Band Screens &
Travelling Band Screens
 Mahr Maschinenbau Ges.m. b. H., AUSTRIA
For manufacturing of Multirake Screens
 Stealth Valves & Controls Limited, CANADA
For manufacturing of Energy Dissipating Valves

9. Annual Turnover:  2003 - 04 2.800 (In Million US $)


 2004 - 05 3.770
 2005 - 06 5.025
 2006 – 07 6.001
 2007 – 08 7.354
 2008 – 09 9.965
 2009 – 10 14.220
 2010 – 11 15.030
 2011 – 12 15.220
 2012 – 13 15.250
 2013 – 14 17.450

Exports varies between 20-30% of annual turnover

10. Quality Management:  ISO – 9001 - 2008 certification by BVQI


 CE certification for Penstocks
 CE certification for Knife gate valve
 NSF Certification

11. Products Manufactured:  CI Sluice gates as per AWWA C-560 / IS-13349 /


IS-3042 / BS-7775
 SS Sluice gates Weir gates & Open channel gates as
per AWWA C-561
 Composite Sluice gates as per AWWA C-563
 Aluminium Sluice & Open Channel gates as per
AWWA 562.
 FRP Sluice, Weir & Open Channel gates
 HDPE Sluice, Weir & Open Channel gates
 CI/SS/HDPE Flap gates
 SS & Steel Trash racks, Stoplogs & Roller gates

2
 Microfine Screens (Static & Automated)
 Fine Screens (Step & Drum type)
 Coarse Screens (Multi raked & Single raked)
 Travelling Band Screens
 Suspended Trash rake Screens
 Water Hammer Control valves like Zero Velocity & Air
Cushion valves
 Knife gate valve as per MSS-SP-81, AWWA C-520
 Equipments like Clariflocculators, Flash Mixers,
Degritters, Aerators, Clarifiers, Thickners, Gravity
Decanters, Trickling Filters, Digester Mixers, DAF
Units
 Bulk Solids handling valves like Swing valves, Slide
gate valves, Double Flap valves
 Hydropower Screw Generator
 Archimedean Screw Pumps
 Energy Dissipating Valves

12. Land & Constructed Area  UNIT-1 : Cast Products Plant


Sanwer Road Plant, Indore
Land Area – 320,000 Sq. ft approx.
Constructed Area – 125,000 Sq. ft approx.
 UNIT-2 : Fabricated Products Plant
Bardari Plant, Indore
Land Area – 419,100 Sq. ft approx.
Constructed Area – 155,000 Sq. ft approx.
 UNIT-3 : SEZ Plant ( Export Plant )
SEZ Plant, Pithumpur
Land Area – 125,775 Sq. ft approx.
Constructed Area – 40,000 Sq. ft approx.

13. Cost of plots & Buildings US$ 7.61 Million.

14. Cost of installed Machine US$ 4.45 Million.

15. Total Investment US$ 18.00 Million.

16. Overseas Business Bahrain, Oman, Sweden, USA, Singapore, Malaysia,


Associates Kuwait, Qatar, Jordan, Hong Kong, Norway, U.K.,
France, Canada, Thailand, Vietnam.

17. Domestic Branches / Ahemadabad, Bangalore, Delhi, Kolkata, Mumbai,


Business Associates Chennai, Vishakhapatnam and Trichy.

18. Annual Manufacturing Sluice Gates / Penstocks 5000 Nos.


Capacity Knife Gate Valves 20000 Nos.
Fine Screens 150 Nos.
Coarse Screens 150 Nos.
Other Valves 5000 Nos.
Fabricated Products 2000 tones

3
19. Manpower Details Vice President 1
Sr. General Managers 2
General Managers 2
Asst. General Managers 3
Sr. Managers 9
Managers 3
Dy/Asst Managers 20
Sr. Engineers 11
Engineers 29
Asst. Engineers 22
Others 79
Permanent Worker 209
Temp. Worker & Trainee 230

20. Name of Selected Consultants with whom we have worked in past


 Bechtel, UK
 Pacific Consultants
 Mott McDonalds
 Montgomery Watson Harza
 Watson Khonji, Bahrain
 IFB consulting,Germany
 KEO- Kuwait
 M. N. Dastur & Co. Ltd. Kolkata
 Linde Process Consultants
 Engineers India Ltd.
 STUP Consultant
 Dalal Consultant Ltd.
 Parsons Engineering science, Oman
 Binnie Black & Veatch
 UHDE India Ltd. Mumbai
 CH2M HILL, Singapore
 Nihon Suido, Thailand
 Black & Vatech, Singapore
 Humphreys & Glasgows Ltd. Mumbai
 Tata Consulting Engineers, Mumbai
 Dar-Al-Handasah-Harza Engineering, USA-Gibbs,
UK consortium, Jordan.

21. Exporting Countries USA, Canada, Peru, UK, Denmark, Italy, France,
Germany, Turkey, Kazakhstan, Uzbekistan, Iraq, UAE,
Saudi Arabia, Bahrain, Oman, Qatar, Kuwait, Jordan,
Algeria, Sri Lanka, Bangladesh, Thailand, Malaysia,
Singapore, Hong Kong, Vietnam. Detailed reference list
can be downloaded from our website www.jashindia.com

22. Other Details Details like reference list of various equipment, ISO & CE
certificate, 25,000 cycle test certificate, equipment list
etc can be downloaded from our website
www.jashindia.com

4
23. Company photographs Registered Head Office

UNIT-1 : Cast Products Plant

UNIT-2 : Fabricated Products Plant

UNIT-3 : SEZ Plant ( Export Plant )

Dated: 01 April 2014


5
6-Company Organization Chart
SUPPLIER
ORGANISATION
CHART
MANUFACTURER
ORGANISATION
CHART
lASH ENGINEERING LIMITED

ORGANISATION CHART OF FINANCE & COMMERCIAL

LD.AMIN •
• DI......mrl
1
D.K.lain (G.M.Flnance) U1/ ACT/01

--
C Ildlil

Anand Dudbe
(Asst.
Manager)
(Asst.Mgr)
U1/ACT/18
...
AnilGothane
(Asst. Manager)
UI/ACT/03
AtuJ Kanungo
(lr.Englneer)
U1/CIV/01
...... ~
1
v......
1

(Executive)
Ul/COM/04
1
Sudblr sharma Madbav
Bbalerao
(Sr.Executive)
~--------------------------------~-----------------------i---------------------1
1I1/Af'T/02
.. ..
1I1/rnM/or;

Prasant Vyas
(Officer)
Ul/ACT/04
• CIIIIIl I Rltesli Godba
(Executive)
U1/ACT/06
Hemant Vlsbwakarma(Executlve)
Excise UI/ACT/09
:
:
\
U1/COM/01 Manesb K Modi
(Asst Manager)
Ul/COM/OZ
...
(Asst.Executive)U 1/COM/ZO

Husain LiRbtwala rExecutivel U1L_COM_L03


1 1 1 r-=-.L-"' __ --. : ... ... 1 ...

.
MlJindPranjape Kbusbal Cbandra (ExecutiveCustom & VikasMehta Rajesh More Vilendra (Deputy Aadesb Aml\
(Accounts Bagh(Outsource Sbekbar Acct)U1/ACT/19 ,, (DeputyManager) (Engineer) Lasbkari Officer) Namdev Sbrlvastava
Executlve-Casb) d) UI/ACT/O? Sagare ,, U1/COM/06 Ul/COM/ll (Deputy Omcer) U1/COM/21 (Asst (Asst.Supervis
111'ArT/or;
'---,.------' , n· 'r".... ~ ~rlil' .,,;,,....
, .I. ...
l

f:$:1
Yashpal Sudama Narware Abbisbek Sbuka HariOm Gour Manls..,amde Akash ...
Dadhore (Omcer) : (Assistant (Assistant Blrla (Deputy v(Asst Dewanl
(Supervlsotor SEZ ~. Executive) Supervisor) Executive) (Supervisor)
UI/ACT/08 UI/ACT/ll U1/COM/O? Bardari U1/COM/1S U1/COM/16

ArpltWatwale Lokesh ~arma


(GET) (Trainee)
l:l U1/COM/10 ~ U1/COM/lZ
,.

JASH ENGINEERING LIMITED


, ,
I ORGANISATIONCHARTOF FOUNDRY
,-
L.D.AMIN

..
It .
Ul/FDY/Ol

....
'JI


aanjay vel' ltv Officer)
Ul/FDY/24

D.W.
Shiwankar(Ass
Sanjay
Venna(Deputy
I Klsbore Somwansbl
(Sr. Engineer) Ul/FDY/13
I V1JayPtas.i:I
NPldu
t, Manager) Officer)Ul/FDY/24 (Qut50lJrQlldj
Ul/FDY/02 ~
1 -+
I La:;:atl ~::~:~.. ... I
I -r

I Melting ~
I I + 0+
Molding Fettllng
Planning
S Shift-II I Shift-I
I Anku~~;Pta
I Shift .1
1
Iishift -Ii
1
I
J. ~
.. ...
Shift -I· I Shift-II
~
Shift -I
-+
I I Shift-II •Shift -I II Shift -II I
SureshC.Bhatt
(Engineer)
,l.
I U1/FDY115 I I~~:;:ra
I -~

Ul/FJ)Y/17
beep.~K·
Malviya
(Supervisor
I$unil Vida"

IU1/FDY/l~
S:njayMulcat
(Asst.Englnee
Ul/FDY/03
I Ul/FDY/06
j
Suyash
Pandey
(Engineer) I •
~:/FDY/ I
+
Satish Sharma
(Supervisor)
Ul/FDY/ll

-+
IDET )
1111/k't"lV 11 A

Vlsbwanatb INewProduct .Pattern


Ul/FDY/ Ul/FDY/09 Zarbade
AnllPanciya 07 (Supervisor) Abdul_el
Sanjay Pawar Ul/FDY/12 khan nt
(Asst.Englneer)
(Supervisor) Ul/FDY/OS
(Sr.
D. R. Sharma
Ul/FDY/04 (Asst. Engineer)
Ul/FDY/l0
I ;:m~ ·111 I
JASH ENGINEERING LIMITED UNIT -I,
ORGANISATION CHART OF DESIGN
"

Pratik Patel

Ul/DSG/Ol
l
Deepak Kothari
l
OJ.Dhurekar
~ ~
(Deputy Manager'
UlIOSG/02
..- (Engineer)
UlIOSG/03
Sashi Kumar (Manager) UI/OSG/16
I (Sr. Engineer'
Ul/OSG/21

I I I 1 .. I
ExpaIt Gates
"
.a ....
.......
Iiatet
Bulk SoIld Valves IPV .. ScrWI
'"
............
ScNw

PumpI

~
VACANT (Assistant
1 1
Panka] Pathak
1
Jltendra
~
Ravindra R.
1
Ravl Mukesh Jain
1
Ul/OSG/08 (Assistant Engineer) Anuj Motghare
Manager) Sharma(Asst Talele Bandhaiva (Engineer)
Ul/OSG/12 (Engineer,
UI/DSG/04 Engineer) .(Engineer' (G.E.T.' Ul/0SG/23
Ul/OSG/25
Ul/OSG/17 Ul/OSG/20 Ul/0SG/22
1 ~ 1
VikramS. Ashlsh
Shruti Thakur Kailash Mandlol Tomar Raghuwanshi
(Engineer) (Engineer) (Jr. Engineer) (Asst Engineer)
UI/OSG/OS Ul/OSG!09 Ul/OSG/13 Ul/OSG/18

I
Hariom Gupta
vACANT Vlkram
Shiv Shankar (Sr. Anil Kumar Patil (Engineer)
(Junior Ahirwar
Supervisor) (Engineer) Ul/OSG/i9 Ul/OSG/24
UI/OSG/06
En,I" .. r) [Sub-Engineer ~
UI/OSG/10 Ul/OSG/14

rttt:A~~
Oivyadarshl Sourabh
Vishwakarma
Chourasla. (Sr. Sharma(Asst: Eo-
(Supervisor)
Supervisor) Supervisor)
Ul/OSG/15
UI/OSG/07 UI/OSG/11

\\tI] \ ~ \.~ ,
~~@
~iVDO«~,..
----
......
j ,

JASH ENGINEERING LIMITED UNIT-I,

ORGANISATION CHART OF VALVE MARKETING


~i

'''UlIla" •. .~...~_.._,..'"....,.~I
Pratik Patel
I
v...."'u~
"

1 1 1 1 1 1 1 ~
North I central
Sales Technical
WEST t EAST SOUllt EXPORT coordinator Services Service

1 + +. ~ + + +
ShashakTlwari-GET- Prashant Tare-Sr. Executive ZH ON chattopadhyay Sr. Nltesh Kawadkar-GET Archit OubeY'(Servlce
Internal sales (West) Manager ZH-(East) Nitin Khatke- Ul/VMK/17 Engg.)
Ul/VMK/03 Ul/VMK/06 Ul/VMK/08 Executive Ul/VMK/18
Ul/VMK/16
UJ/VMKII3 Ul/VMK/15
I I
...
U1/VM~/U4

k-
Harsh"athak
-GET
Internal sales Ul/VMK/09 I UlIVMKIII I~
Ul/VMK/07

Manish Upadhyay-Oy. 1
Manager
'" As South and East zones are far off it is
ZH (North/Central)
U1/VMK/02 decided that these zones will have zonal
~ Mohamed Saleem Ulla- ~ heads based at the zones and they will be
Executive-Bangalore
responsible for business from the zones.
U1/VMK/10 Ul/VMK/12

field SalesExecutive -Jan2016


Delhi
Ul/VMK!OS

Ul/VMK/14

~\~ ,_.':i .
• ~
~~
~ I. ~~#
JASH ENGINEERING LIMITED UNIT-I,

Amit Kumar . Bandi


(Deputy Manager) (Sr. Manager)
Ul/MKT/02 U1/MKT/23

Yogesbbolkar
( Sr. Manager)
(Asst. Manager) Kapil Jain
Ul/MKT/06
Ul/MKT/ll (Deputy Manager)
Ul/MKT/15

Gbanshyam
Singh Panwar
(Asst.Engr)
Shashank Jain
Ul/MKT/12 Nitesh Jain
Ankur Agrawal (Asst.Engineer
(Sr.Engineer) ) (Executive)
Ul/MKT/07 Ul/MKT/09 Ul/MKT/26

(Asst.Engineer)
Neeraj Patel
Ul/MKT/08 Ankush Saini
(G.E.T.) (Executive)
Ul/MKT/10 Ul/MKT/27

Rabin Sarda Ram Chandra More


(Asst. Engineer) (Supervisor)
Ul/MKT/14 Ul/MKT/28
JASH ENGINEERING LIMITED UNIT-I,

ORGANISATION CHART OF EXPORT AND POWER PLANT & SPECIAL BUSINESS

Pratik Patel

C.K. Pareek (AGM) Ul/EXP/Ol


1 1 ~
Power PI~nt &
Europe & USA Asia & Africa
, Special

~ +
Abhishek Jain Tamkeen Khan
(Sr.Executive) (Sr.Manager)
Ul/EXP/02 Ul/EXP/04 Ul/EXP/08

I I
+ 1 1
Akash Sadoriya
1"
'"
(Executive) Ul/EXP 107
Vishal Gangwal
(Engineer)
South East Asia Middle Asia & Africa
Ul!EXP!OS
Ul!EXP/03 1 I
Sudeep Zamidar
(Engineer)
UllEXP/ll
UllEXP/09

I 1

Priyesh Upadhvay
Manish Kumar (G.E.T.)
(G.E.T.) Ul/EXP/1O Ul/EXP/12
JASH ENGINEERING LIMITED UNIT-I,

ORGANISATION CHART OF PERSONNEL

~ Pratik Patel

AshokJain
(Sr. Manager) Ul/HR/Ol

.~ ~.
~ ~
Alok Takalkar R.P. Mishara Rajeev Sharma Satish Kumar Singh
(Asst. Manager) (Sr. Executive) (Assistant (Deputy Officer)
Ul/HR/02 Ul/HR/04 Executive front Ul/HR/06
office)
U1jHR/05

~
\1 Ivt::1
U2/HR/Ol
7-Compliance statement
8-Valid CR copy/ company ID
LICENSE FOR
LOCAL AGENT
‫>‪<Bar Code‬‬
‫‪2022/06/04‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪:‬‬
‫‪No 1 of 1‬‬ ‫ﺻﻔﺤﺔ ﺭﻗﻢ‪:‬‬

‫ﺭﺧﺼﺔ ﺗﺠﺎﺭﻳﺔ‬

‫*‪*51150‬‬
‫‪2013/06/26‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﺻﺪﺍﺭ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫‪51150‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‪:‬‬
‫‪2023/05/30‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫ﺍﻟﺮﺍﺋﺪﻩ ﻟﻠﺨﺪﻣﺎﺕ ﺍﻟﻬﻨﺪﺳﻴﻪ ﻭﺍﻟﺼﻨﺎﻋﻴﻪ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫‪33910‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬ ‫ﺷﺮﻛﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬
‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬


‫ﺷﻴﺘﻬﺎﻥ ﻧﻮﺭﻭﻧﻬﺎ‬ ‫ﺍﺳﻢ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬
‫ﺍﻟﻬﻨﺪ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬ ‫‪27835606077‬‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‪:‬‬
‫ﻧﻤﻮﺫﺝ ﺧﺘﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬ ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻮﻗﻊ ‪:‬‬
‫‪4‬‬ ‫ﻋﻘﺎﺭ ﺭﻗﻢ‪:‬‬ ‫ﺗﺠﺎﺭﻱ‬ ‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫‪5‬‬ ‫ﺭﻗﻢ ﺍﻟﺪﻭﺭ‪ /‬ﺍﻟﻮﺣﺪﺓ‪:‬‬ ‫ﻣﻜﺘﺐ ﺗﺠﺎﺭﻱ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫ﻭﺭﺛﺔ ﻋﺒﺪﺍﻟﻬﺎﺩﻱ‬
‫ﺳﻠﻴﻤﺎﻥ ﺣﻴﺪﺭ ﺍﻟﺤﻴﺪﺭ‬
‫ﺍﺳﻢ ﻣﺎﻟﻚ ﺍﻟﻌﻘﺎﺭ ‪:‬‬ ‫‪ 24‬ﺭﻭﺿﺔ ﺍﻟﺨﻴﻞ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ‪:‬‬
‫ﻧﻮﻉ ﺍﻟﺮﺧﺼﺔ ‪:‬‬ ‫ﺣﻄﻴﻦ‬ ‫ﺍﻟﺸﺎﺭﻉ‪:‬‬
‫ﺑﻠﺪﻳﺔ ﺍﻟﺪﻭﺣﺔ ‪ /‬ﺭﻭﺿﻪ‬
‫ﺍﻟﺨﻴﻞ ‪ /‬ﺣﻄﻴﻦ‬
‫ﻭﺻﻒ ﺍﻟﻌﻨﻮﺍﻥ ‪:‬‬ ‫‪830‬‬ ‫ﺭﻗﻢ ﺍﻟﺸﺎﺭﻉ ‪:‬‬
‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬

‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬


‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻤﻼﺑﺲ ﺍﻟﻤﻬﻨﻴﺔ‬ ‫‪4641564‬‬ ‫ﺗﺠﺎﺭﺓ ﺍﺟﻬﺰﺓ ﻭ ﻣﻌﺪﺍﺕ ﺍﻻﻧﺬﺍﺭ ﻭ ﺍﻻﻃﻔﺎﺀ‬ ‫‪4759601‬‬
‫ﻣﻘﺎﻭﻻﺕ ﻋﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ )ﺍﻻﻧﺸﺎﺍﺕ‬ ‫‪452100‬‬ ‫ﻭ ﺍﻟﺴﻼﻣﺔ‬
‫ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻰ(‬ ‫ﺍﻟﺘﺠﺎﺭﻩ ﻓﻰ ﺍﻻﺩﻭﺍﺕ ﺍﻟﻤﻴﻜﺎﻧﻴﻜﻴﻪ‬ ‫‪4659601‬‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺘﺴﺠﻴﻞ ﻭﺍﻟﺘﺮﺍﺧﻴﺺ ﺍﻟﺘﺠﺎﺭﻳﺔ‬


‫>‪<Bar Code‬‬

‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬

‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪2022/09/12 :‬‬


‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺮﻯ‬

‫*‪*33910‬‬
‫‪5000385419‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ‪:‬‬ ‫‪33910‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬ ‫ﺍﻟﺮﺍﺋﺪﻩ ﻟﻠﺨﺪﻣﺎﺕ ﺍﻟﻬﻨﺪﺳﻴﻪ ﻭﺍﻟﺼﻨﺎﻋﻴﻪ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫‪01/10/2023‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬ ‫‪03/10/2006‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬
‫‪200000‬‬ ‫ﺭﺍﺱ ﺍﻟﻤﺎﻝ‪:‬‬ ‫ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬ ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ‪:‬‬
‫ﻗﻄﺮ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ‪:‬‬ ‫ﻧﺸﻂ‬ ‫ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ‪:‬‬
‫‪1‬‬ ‫ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ‪:‬‬
‫ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ‬
‫‪+974877555‬‬ ‫ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ‪:‬‬ ‫‪24875‬‬ ‫ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ‪:‬‬

‫ﺍﻟﺸﺮﻛﺎﺀ‬

‫ﺍﻟﺤﺎﻟﺔ‬ ‫ﺍﻟﻨﺴﺒﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬


‫ﻧﺸﻂ‬ ‫‪49‬‬ ‫ﺍﻟﻬﻨﺪ‬ ‫‪27835606077‬‬ ‫ﺷﻴﺘﻬﺎﻥ ﻧﻮﺭﻭﻧﻬﺎ‬
‫ﻧﺸﻂ‬ ‫‪51‬‬ ‫ﻗﻄﺮ‬ ‫‪31663405355‬‬ ‫ﻣﺤﻤﺪ ﺍﺳﻤﺎﻋﻴﻞ ﻣﺤﻤﺪ ﻋﻠﻰ ﺍﻻﻧﺼﺎﺭﻯ‬

‫ﺍﻟﻤﺪﺭﺍﺀ )ﺍﻟﻤﺨﻮﻟﻮﻥ ﺑﺎﻟﺘﻮﻗﻴﻊ(‬

‫ﺍﻟﺼﻔﺔ )ﺍﻟﺼﻼﺣﻴﺔ(‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬


‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﻗﻄﺮ‬ ‫‪27563402004‬‬ ‫ﺍﺳﻤﺎﻋﻴﻞ ﻣﺤﻤﺪ ﻋﻠﻰ ﺍﻛﺒﺮ ﺍﻻﻧﺼﺎﺭﻯ‬

‫‪Page 1 of 2‬‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪33910 :‬‬

‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬
‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬
‫>‪<Bar Code‬‬

‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬

‫‪ -‬ﻣﺪﻳﺮ‬ ‫ﺍﻟﻬﻨﺪ‬ ‫‪27835606077‬‬ ‫ﺷﻴﺘﻬﺎﻥ ﻧﻮﺭﻭﻧﻬﺎ‬


‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﺍﻟﻬﻨﺪ‬ ‫‪27835606077‬‬ ‫ﺷﻴﺘﻬﺎﻥ ﻧﻮﺭﻭﻧﻬﺎ‬

‫ﺍﻟﻔﺮﻭﻉ‬

‫ﺣﺎﻟﺔ ﺍﻟﻔﺮﻉ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﻟﻠﻔﺮﻉ‬ ‫ﺍﺳﻢ ﺍﻟﻔﺮﻉ‬ ‫ﺍﻟﺮﻗﻢ ﺍﻟﺘﺴﻠﺴﻠﻰ‬


‫ﻣﺸﻄﻮﺏ‬ ‫‪33910/1‬‬ ‫ﺍﻟﻤﺮﻛﺰ ﺍﻟﺒﺤﺮﻱ ﺍﻟﻤﺒﺎﺷﺮ‬ ‫‪1‬‬
‫ﺍﻟﻠﻮﺟﺴﺘﻴﺔ ﺍﻟﻌﺎﻟﻤﻴﺔ‬

‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬

‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬


‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﻟﻤﻼﺑﺲ ﺍﻟﻤﻬﻨﻴﺔ‬ ‫‪4641564‬‬ ‫ﺗﺠﺎﺭﺓ ﺍﺟﻬﺰﺓ ﻭ ﻣﻌﺪﺍﺕ ﺍﻻﻧﺬﺍﺭ ﻭ ﺍﻻﻃﻔﺎﺀ ﻭ ﺍﻟﺴﻼﻣﺔ‬ ‫‪4759601‬‬
‫ﻣﻘﺎﻭﻻﺕ ﻋﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ )ﺍﻻﻧﺸﺎﺍﺕ ﺍﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻰ(‬ ‫‪452100‬‬ ‫ﺍﻟﺘﺠﺎﺭﻩ ﻓﻰ ﺍﻻﺩﻭﺍﺕ ﺍﻟﻤﻴﻜﺎﻧﻴﻜﻴﻪ‬ ‫‪4659601‬‬

‫‪Page 2 of 2‬‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪33910 :‬‬

‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬
‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬
27/08/2020

TAX CARD - ‫ﺑﻄﺎﻗﺔ ﺿﺮﻳﺒﻴﺔ‬

The General Tax Authority of Qatar certifies that the ‫ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﻀﺮاﺋﺐ ﻓﻲ دوﻟﺔ ﻗﻄﺮ أن‬
entity is registered as per the following details: :‫اﻟﺠﻬﺔ أدﻧﺎه ﻣﺴﺠﻠﺔ ﺣﺴﺐ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ‬

TIN Number 5000385419 ‫رﻗﻢ اﻟﺘﻌﺮﻳﻒ اﻟﻀﺮﻳﺒﻲ‬

‫اﻟﺮاﺋﺪه ﻟﻠﺨﺪﻣﺎت اﻟﻬﻨﺪﺳﻴﻪ واﻟﺼﻨﺎﻋﻴﻪ‬ :‫إﺳﻢ اﻟﻤﻜﻠﻒ‬


Taxpayer Name:
Al Raeda for Engineering and Industrial
Commercial ‫رﻗﻢ اﻟﺴﺠﻞ اﻟﺘﺠﺎري اﻟﻘﻄﺮي‬
33910
Registration Number
Address Zone: 24 :‫ ﻣﻨﻄﻘﺔ‬Building: 503 :‫اﻟﻤﺒﻨﻰ‬ ‫اﻟﻌﻨﻮان‬

[Headquarter]: Street: ‫ ﺣﻄﻴﻦ‬:‫ﺷﺎرع‬ :(‫)اﻟﻤﺮﻛﺰ اﻟﺮﺋﻴﺴﻲ‬


Qatar - ‫ﻗﻄﺮ‬
:‫اﻟﻨﺸﺎط اﻟﺮﺋﻴﺴﻲ‬
Main Activity: 452100 - (‫ﻣﻘﺎوﻻت ﻋﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻲ )اﻻﻧﺸﺎات اﻟﻌﺎﻣﺔ ﻟﻠﻤﺒﺎﻧﻰ‬
452100-General contracts for buildings (public
construction of buildings)
:‫اﻟﺸﻜﻞ اﻟﻘﺎﻧﻮﻧﻲ‬
Legal Form: ‫ﺷﺮﻛﺔ ذات ﻣﺴﺆوﻟﻴﺔ ﻣﺤﺪودة‬
Limited Liability Company
Activity Commencement :‫ﺗﺎرﻳﺦ ﺑﺪئ اﻟﻨﺸﺎط‬
26/06/2013
Date:
Number of Branches: 0 :‫ﻋﺪد اﻟﻔﺮوع‬

Registered taxes : : ‫اﻟﻀﺮاﺋﺐ اﻟﻤﺴﺠﻠﺔ‬

Income Tax REGISTERED - 26/06/2013 - ‫ﻣﺴﺠﻞ‬ ‫اﻟﻀﺮﻳﺒﺔ ﻋﻠﻰ اﻟﺪﺧﻞ‬

‫ﻫﺬه اﻟﻮﺛﻴﻘﺔ ﻣﺴﺘﺨﺮﺟﺔ ﻣﻦ اﻟﻨﻈﺎم اﻵﻟﻲ و ﻟﻴﺲ ﻣﻦ اﻟﻀﺮوري اﻟﺘﻮﻗﻴﻊ ﻋﻠﻴﻬﺎ‬

This is a system generated document and does not require to be signed.


9-Material Catalogue
PRODUCT
CATALOGUES
STORAGE AND
HANDLING
INSTRUCTIONS
INSTRUCTION FOR SITE STORAGE REQUIREMENT

INTRODUCTION:

This manual describes recommended methods of handling and storage and safety of JASH equipment at site
before installation.

During manufacture and assembly, great care is taken to ensure (joints) flatness of mating seat facings on the
gate frame and shutter in gate fully closed position. Unless the gate is carefully installed free from distortion,
maintaining (joints) flatness of mating seat facings on the gate frame and shutter as ensured at factory, the
gate will leak excessively.

JASH equipment are custom made equipment, comprising of many parts, components and accessories viz.
Gate assembly: comprising of frame, shutter, logs, lifting beam, side and top - bottom wedges etc, Wall
thimble and Lifting mechanism: comprising of operating headstock, lifting rod/spindle/stem, coupling, stem
guide bracket, etc. Being custom equipment made to order on an individual basis, complete inter-changeability
of all parts is not possible and hence replacements and fitments, if necessary involve substantial time and
delays. It is, therefore, essential that the equipment is carefully handled during transit, unloading, storage and
installation to avoid damage and it should be ensured that no pilferage of components take place. All
components are tagged to identify their respective gate/log as per the gate tag number / serial number etc.
inspected and certified complete at our factory before packing and shipment.

This manual furnishes information and procedures only as a recommendation for the proper handling, storage,
of JASH equipment. Technical details, data and sketches given in this manual are of a general nature and may
vary from the exact equipment supplied due to project specific requirements or due to the constant learning
and upgrading. JASH endeavor’s to be the leader in our field and tries to keep our products and designs the
best available.

JASH assumes no liability expressed or implied for the interpretation of this instruction manual or the faulty
handling, storage, installation or commissioning of the gates supplied. Responsibility of JASH is restricted to
manufacturing defects only and does not extend to improper installation, adjustments and related problems
subsequent to manufacturing.

UNLOADING AND UNPACKING:

While taking delivery from the Carriers, before unloading packing cases / material from the vehicle, check
the packing cases for apparent damage from outside during transit. Also check unpacked or partially packed
items, if any, for damage or pilferage during transit. In case of any damage or shortage, obtain carrier’s
certificate at the time of taking delivery and report to the Manufacturer and the Insurer immediately.

Before commencement of unloading verify the weight of the packing cases / material for proper selection of
lifting equipment. This can be done by checking the weight of packing cases / material from the packing list.
In case this information is not available or in case there is any confusion on this matter then contact!
Manufacturer immediately, to know the weight or to clarify the doubts.
The lifting capacity of slings, chains, tackles, hoist, crane etc to be used for unloading and subsequent handling
should be atleast 50% more than the weight of the heaviest packing case / material to be handled, and
remember any excessive out-reach could cause dangerous problems.

Before commencement of unloading also ensure that a leveled, firm and compacted elevated platform
approximately 300 mm (12”) higher than the surrounding area {refer figure ( b )} is ready for keeping
unloaded packing cases / material. The floor area of this platform should be 2 times the floor area of all the
packing cases / material to be unloaded.

Always sling the cases and heavier parts while unloading. Do not drop the cases and the parts on floor from a
height. Do not lift/lower any case containing gate assembly on to its sides and do not put it upside down. Refer
to instructions shown on the packing case showing where the slings should be used, which side the material
is up and how to store the boxes. Refer figure (a) above to understand how to handle packing cases. DO NOT
WALK UNDER RAISED PACKING CRATES!

Open the cases immediately on unloading / receipt and check for any damage or pilferage during
transportation. Take care to see that no parts are damaged while opening the cases. Check the consignment
according to packing list enclosed. Report any shortages or complaints to the Manufacturer and the Insurer
immediately.

HANDLING AND STORAGE:

The Gate should be carefully handled with proper lifting tackles and slings to avoid injury to persons, breakage
and damage to the gate assembly and its components and other parts and accessories. During storage the
equipment should be placed on wooden planks (not spaced more than 600 mm (24”) over an even compacted
surface so as to keep them off the ground and prevent bending and distortion. Refer figure (b) above.

Ferrous contamination, if any, taking place in our plant during manufacturing is eliminated by pickling and
passivation of all stainless steel items before packing and dispatch. To avoid ferrous contamination of stainless
steel components at site please ensure that no stainless steel items come in direct contact with chains and
handling accessories made of carbon steel, as this results into ferrous pickup / contamination and subsequent
corrosion on stainless steel items in places which have come in contact with carbon steel. JASH will not be
held responsible for ferrous contamination of stainless steel items taking place at site due to handling and
storage in improper manner.

Stacking of large and heavy gates should be avoided as far as possible. If gates are sent stacked from the
factory then no further material should be stored over this stack after unloading. In case where storage space
is limited for the number of gates involved and if stacking is badly necessary it should be limited to only four
gates and heavy wooden planks of even thickness should be placed in between the gates to prevent damage
to the stacked gates. If gates are sent stacked from the factory then no further material should be kept
over this stack after unloading.

Gate assembly, lifting rod and lifting mechanisms have precisely machined and finished surfaces and hence
should be protected from damage during handling as well as storage.

Main gate assembly comprises of gate frame fitted with shutter in its guides. This assembly is factory
assembled and tested and hence should not be dismantled or disturbed. The shutter is locked in position
at its top with the help of lock plates / transit stop (painted red) bolted to the frame. These lock plates prevent
the vertical movement of shutter in the frame. Lock plates / transit stop should not be removed until the gate
is installed and is to be initially operated. Refer figure ( c ) above to understand location of transit stop / lock
plate.

Shutter should never be taken out from the frame during handling, storage or installation. Adjustment of
wedge block bolts, when provided should not be disturbed. Care should be taken to avoid damage to the
wedges and wedge adjustment bolts while slinging and handling.

Utmost care should be taken to avoid bending of lifting rods (spindle) while handling. The threaded portion
of a spindle is applied with grease and is wrapped with thin polyethylene sheet and Hessian cloth wrapped
and tied over it. The threads should be checked for any damage during transit. They should remain greased
and should be kept wrapped up as described above until the spindle is needed for installation.
The spindle of self-contained / closed top frame gates {refer figure (m) to understand what is a self-contained
/ closed top frame gate} are sent assembled on to the gate assembly.

Spindles of gates which are not self-contained type / open top frame gates {refer figure ( o ) to understand
what is a non self- contained / open top frame gate} are sent separately. Whether a gate is self-contained /
closed top frame or not self-contained / open top frame can be verified from the respective approved GA
drawing.

For spindles of open top frame gates ensure the following:

 Ample care should be taken to protect the threading on lifting rods for the ends to be connected with
couplings, if any.
 Rod coupling, when supplied are threaded and pinned on the end of lifting rod and are ready to be fitted
with the threaded end of other rod to be coupled. Ensure that the pins on couplings do not get loosened
and lost.
 Stop Nut is kept threaded on to the spindle threads and is kept fixed with a set screw. Ensure that it does
not get loosened and lost.
 Spindles or lifting rods should be supported over their entire length with a view to prevent bending. They
should be carefully stored on even surfaces off the ground and in a clean and dry area.

During storage care should be taken to cover the equipment to protect seat facings, seals and other machined
surfaces from scratches, dents, rusting etc. and from other foreign matter. The cover should be of material,
which is resistant to water and should cover the entire case from top to bottom.

Packing cases containing operating mechanism (manual operating headstocks / electric actuators / pneumatic
actuators etc) and small parts and anchor bolts / fasteners should be preferably kept in store room to prevent
damage from environmental causes like dirt, dust, sunlight and rain and also with a view to prevent chances
of pilferage.

In case of any doubt pertaining to handling/storage of supplied material refer to the manufacturer.

WARNING:

Follow appropriate safety measures/laws and working conditions as applicable for your project or as
applicable in your Country while unloading, handling, installation and commissioning of this
equipment. Take due care to avoid ferrous contamination on stainless steel items while handling,
storage and installation of supplied products.

JASH assumes no liability for accidents or damages taking place during the process of handling,
storage, installation or commissioning of the gates supplied.

--------------------------------------------------------------------------------------------------------------------------
INSPECTION TEST
PLAN
QUALITY ASSURANCE PLAN

PRODUCT: STAINLESS STEEL FRAME, STAINLESS STEEL LOG


CLIENT :- Al Raida Engineering & Industrial Services WLL Ref: -ITP/STOP LOG/QA-35/001 -
PROJECT :- D-RING ROAD IMPROVEMENT WORKS (PROJECT ID: PA 2019 C 109 G) Rev-0 date: 09/12/2021
Sr. Component Testing / Inspection Reference Acceptance Format SCOPE
Characteristics
No. & Check Type Quantum Document Norm record J C T
MATERIAL Reports
Chemical
Composition Test Report /
ASTM A240 ASTM A240
& Mechanical Document Test
a) Frame R R R
Properties Review Per heat Certificate
EN10088-2 EN10088-2
3.1
Chemical Test Report /
ASTM A240 ASTM A240
Composition Document Test
b) Stop Log R R R
& Mechanical Review Per heat Certificate
EN10088-2 EN10088-2
Properties 3.1
Test Report /
Polymer Approved G.A. Approved G.A. Test
c) Rubber Seals Physical 100% R R R
Identification Drawing Drawing Certificate
2.2
SHOP TESTS: Fabrication Shop
Procedure and Welding strength &
Document EN 15614 / EN 15614 / WPS/PQR/W
a) welder welder’s ability to 100% P R R
review AWS D1.6 AWS D1.6 PQR
qualification perform

SHOP TESTS: Final Assembly Shop


Approved Approved G.A. Inspection
a) Dimensional Overall dimensions Measurement 100%
Report
P R R
G. A. Drawing Drawing
Gap between < 0.004 Inch ( Inspection
b) Seat clearance Measurement 100% Jash Standard P R R
sealing face 0.10 MM ) Report
Smooth
Movement of stop Inspection
c) Movement Visual 100% Jash Standard Interference
Report
P R R
log between guide
free movement

Document Approved Approved G.A. Inspection


d) Overall Report - - P R R
Dossier G. A. Drawing Drawing Report

NOTE: –
1. We reserve our right to conduct check test at external lab if the test certificate not provided by vendor.
2. Equivalent material grades of EN/ASTM standard ,shall be used for fabrication
3. Movement test can be carried out on Test bench or shop floor - with dummy or lifting beam under supply.
4. We do not undertake to conduct additional testing other than those stated above.
5. If Client / Representative / Inspection Agency - need to witness the shop test - The quantum will be one per lot
per type.& size.
6. Height restriction on test bench for leakage test 2000 mm max.

LEGENDS – P : Perform R : Review W : Witness J: JASH C : Client T : Third party inspection Agency

Amit Paul
Prepared By: Jash Approved By: Rohit RATHI

Ref: -ITP/STOP LOG/QA-35/001 - Rev-0 date: 09/12/2021


INSTALLATION/
OPERATION AND
MAINTENANCE
INSTRUCTIONS
JASH ENGINEERING LIMITED
31, SECTOR ‘C’, INDUSTRIAL AREA, SANWER ROAD,
INDORE 452 015 (M.P.) INDIA
PH: 0091-731-4232900, 2720143
FAX: 0091-731-2720499
E-mail: info@jashindia.com
Website: www.jashindia.com

INSTALLATION, OPERATION AND MAINTENANCE MANUAL


FOR
SIDE WALL EMBEDDED ‘JASH’ SECTIONAL STOPLOGS
(Aluminum / Stainless Steel / Composite)

Manual Code: SIOM-SSL-SWE-002


(Revision-0, Date-01.08.2016)

CLIENT: SAMPLE

-0-
INSTALLATION, OPERATION AND MAINTENANCE
MANUAL FOR SIDE WALL EMBEDDED
‘JASH’ STOPLOGS

INDEX

SR. DESCRIPTION PAGE NOS.


NO.
1. INDEX 01

2. INTRODUCTION, UNLOADING AND UNPACKING, HANDLING 02 – 04


AND STORAGE

3. INSTALLATION PROCEDURE FOR FRAME OF STOPLOGS 05 – 11

4. OPERATION OF STOPLOGS 12 – 17

5. MAINTENANCE INSTRUCTIONS (DO’S & DON’TS) 18 – 19

6. TROUBLE SHOOTING 20 – 21

-1-
INSTRUCTION MANUAL FOR JASH STOPLOGS

INTRODUCTION:

This manual describes recommended methods of handling and storage, installation, initial operation,
precautions for maintenance and safety of JASH Stoplogs (Stainless steel / Carbon steel / Aluminum
/ Composite).

During manufacture and assembly, great care is taken to ensure (joint) flatness of mating sealing
faces on the stoplog frame and sectional logs. Unless the stoplog is carefully installed free from
distortion, maintaining (joint) flatness of mating sealing faces on the stoplog frame and sectional
logs as inspected and tested at our factory, the stoplogs will leak excessively.

A stoplog is custom made equipment comprising of a number of parts, components and accessories
viz. stoplog frame, sectional stoplogs, sealing arrangement, lifting beam etc. Being custom
equipment made to order on an individual basis, complete inter-changeability of all parts is not
possible and hence replacements and fitments, if necessary involve substantial time and delays. It is,
therefore, essential that the equipment is carefully handled during transit, unloading, storage and
installation to avoid damage and it should be ensured that no pilferage of components take place. All
components are tagged to identify their respective assembly as per the stoplog tag number / serial
number, etc. inspected and certified complete at our factory before packing and shipment.

This manual furnishes information and procedures only as a recommendation for the proper
handling, storage and installation of JASH Stoplogs. Technical details, figures and sketches given in
this manual are of general nature and may vary from the exact equipment supplied due to project
specific requirement or due to constant upgradation in product design.

JASH assumes no liability expressed or implied for the interpretation of this instruction manual or
the faulty handling, storage, installation or commissioning of the supplied products. Responsibility
of JASH is restricted to manufacturing defects only and does not extend to improper installation,
adjustments and related problems subsequent to manufacturing.

UNLOADING AND UNPACKING:

While taking delivery from the Carriers, before unloading packing cases / material from the vehicle,
check the packing cases for apparent damage from outside during transit. Also check unpacked or
partially packed items, if any, for damage or pilferage during transit. In case of any damage or
shortage, obtain carrier’s certificate at the time of taking delivery and report to the Manufacturer
and the Insurer immediately.

Before commencement of unloading verify the weight of the packing cases / material for proper
selection of lifting equipment. This can be done by checking the weight of packing cases / material
from the packing list. In case this information is not available or in case there is any confusion on
this matter then contact! the manufacturer immediately to know the weight or to clarify the doubts.
The lifting capacity of slings, chains, tackles, hoist, crane etc. to be used for unloading and
subsequent handling should be atleast 50% more than the weight of the heaviest packing case /
material to be handled, and remember any excessive out-reach could cause dangerous problems.

-2-
Before commencement of unloading also ensure that a leveled, firm and compacted elevated
platform approximately 300 mm (12”) higher than the surrounding area {refer figure ( b )} is ready
for keeping unloaded packing cases / material. The floor area of this platform should be 2 times the
floor area of all the packing cases / material to be unloaded.

Figure (a) Figure (b)

Always sling the cases and heavier parts while unloading. Do not drop the cases and the parts on
floor from a height. Do not lower the case containing stoplog assembly on to its sides and do not put
it upside down. Refer to instructions shown on the packing case showing where the slings should be
used, which side the material is up and how to store the boxes. Refer figure ( a ) above to understand
how to handle packing cases. DO NOT WALK UNDER RAISED PACKING CRATES!

Open the cases immediately on unloading / receipt and check for any damage or pilferage during
transportation. Take care to see that no parts are damaged while opening the cases. Check the
consignment according to packing list enclosed. Report any shortages; or complaints to the
Manufacturer and the Insurer immediately.

HANDLING AND STORAGE:

The Stoplog should be carefully handled with proper lifting tackle and slings to avoid injury to
persons, breakage and or damage to the stop log assembly and its components and other parts and
accessories. During storage the equipment should be placed on wooden planks (not spaced more
than 600 mm (24”) apart) over an even compacted surface so as to keep them off the ground and
prevent bending and distortion. Refer figure ( b ) above.

Ferrous contamination, if any, taking place in our factory during manufacturing is eliminated by
pickling and passivation of all stainless steel items before packing and dispatch. To avoid ferrous
contamination of stainless steel components at site please ensure that no stainless steel items come in
direct contact with chains and handling accessories made of carbon steel as this results into ferrous
pickup / contamination and subsequent corrosion on stainless steel items in places which have come
in contact with carbon steel. Jash will not be held responsible for ferrous contamination of stainless
steel items taking place at site due to handling and storage in an improper manner.

-3-
Stacking of large and heavy stoplogs should be avoided as much as possible. If stoplogs are sent
stacked from the factory then no further material should be stored over this stack after unloading.
Stoplog assembly and lifting beams have precisely machined and finished surfaces and hence should
be protected from damage during handling as well as storage.

Utmost care should be taken to avoid bending of stoplog frame, sectional logs and lifting beam while
handling. They should be carefully stored on even surfaces off the ground and in a clean and dry
area. During storage, care should be taken to cover the equipment to protect seat facings, seals and
other machined surfaces from scratches, dents, rusting etc. and from other foreign matter. The tarp
cover should be of a material which is resistant to water and should cover the entire case from top to
bottom.

Packing cases containing operating mechanism, small parts and anchor bolts / fasteners should be
preferably kept in a store room to prevent damage from environmental causes like dirt, dust,
sunlight, rain and also with a view to prevent chances of pilferage.

In case of any doubt pertaining to handling / storage of supplied material refer to the manufacturer.

WARNING:

Follow appropriate safety measures / laws and working conditions as applicable for your
project or as applicable in your Country while unloading, handling, installation and
commissioning of this equipment. Take due care to avoid ferrous contamination on stainless
steel items while handling, storage and installation of supplied products.

JASH assumes no liability for accidents or damages taking place during the process of
handling, storage, installation or commissioning of the equipment supplied.

-------------------------------------------------------------------------------------------------------------------------

-4-
INSTALLATION PROCEDURE FOR STOPLOG FRAMES

Verify from the manufacturers drawing whether the stop log frame assembly is multi-piece bolted
construction or single piece welded construction. Multi-piece bolted construction is provided when
the length of frame is longer or when the width of stoplog is more than 2200 mm (86”) or when the
stoplog frame is to be air freighted for urgent delivery.

If the stoplog frame assembly is multi-piece construction then the two vertical side members would
be in multi-piece bolted construction and are delivered to be bolted to the bottom sill member.

If the stoplog frame assembly is a single piece construction then the two vertical side members
would be in single piece and are delivered welded / bolted to the bottom sill member.

Based on whether the stop log frame is in multi-piece construction or single piece construction
minor changes in installation procedure has to be carried out as detailed herein under.

Before commencement of installation, check the site civil conditions for correctness of all
dimensions as shown in the GA Drawing / Civil Block out drawing furnished by JASH for the
stoplog being installed. Specially check whether the invert level of stoplog opening and invert of
platform is as per drawing, check whether the size of the opening for wall mounting stoplog or
whether the groove provided in parallel side walls or distance between the parallel walls and groove
provided in bottom for flush bottom stoplog is of the correct size and depth.

Also specifically check whether enough gap is available between civil structure and lifting pin of
stoplog to enable interference free movement of the stoplogs and lifting arrangement after
installation. Check for the sufficient head room space to be available above the installation area at
the site for proper handling and movement of the frames.

Proceed only if all the dimensions are CORRECT or else first rectify the civil mistakes so that there
are no subsequent problems.

(A) INSTALLATION PROCEDURE FOR A STOPLOG FRAME EMBEDDED IN


GROOVES IN SIDE WALLS AND FLOOR (INVERT) OF A CHANNEL

1. Before the stoplog is taken up for installation, check for the correctness of civil works. Check
that the grooves / recesses as shown in the GA drawing are made in the sidewalls and bottom
floor of the channel. It should be ensured that the grooves provided on the sidewalls are parallel
to each other and square with respect to bottom of channel. Also check the distance between the
bottom of channel to the top of the operating platform. If any discrepancy is observed then
suitable corrections should be carried out before proceeding further. Refer to figure ( c1 & c2 )
below showing cross section of stoplog frame embedded in grooves in side walls.
In case a slab is used to cover the channel then check whether sufficient clearance is available in
the opening provided in the slab for insertion and removal of stoplogs. Ideally the opening
provided in the slabs should be wider by 400 mm than the width of opening provided on the wall
for stoplog and at least 400 mm across to enable in and out movement of stoplog with lifting
beam.

-5-
Figure (c1)

2. If everything is as required then ensure that the groove faces of the first stage grout are
roughened for better adhesion with the second stage grout.

3. If the frames are supplied in multiple pieces than follow the procedure as explained at the end of
this section (B).

Figure (c2)

-6-
4. In case of single-piece frame, lift the stoplog frame assembly comprising of two side vertical
members and bottom sill member and then carefully lower the assembly into the grooves of the
sidewall.

If frame height is more than 3 meters then it is possible that frames are supplied in multiple
pieces / segments for ease in transportation and ease at site handling.

In case of a multi-piece frame, remove the bottom most frame segments {Segment I (Right) and I
(Left)} from the packing and check their correctness as per the drawing. Thereafter pre-assemble
the bottom sill member with 1st segment of vertical side members (Left side as well as Right
side). The vertical side segments and bottom sill members are marked for ease in identification
and assembly.

After the side segments are bolted and dowelled to the bottom sill member, tie the top end of the
side segments using a removable tie bar (painted red) on to the top of vertical 1st segment. Refer
figure ( d ) showing use of tie bar in installation of frame. Lift this assembled 1st segment frame
and put in place in the groove.

Figure (d)

5. After fully lowering the frame assembly in the groove ensures that the bottom sill is flush with
the floor of channel. Also ensure that the side guides of the frame are at an equal distance from
the face of the side walls of the channels.

Figure (e1)
-7-
Figure (e2)

6. Check the horizontal plane of the entire face of the bottom sill using straight edge / bubble level
and if the plane is not correct then use the 6 nos. M10 tapped holes given on the bottom sill to
bring the sill in plane. Refer to figure ( e1 & e2 ) above showing cross section of bottom member
for Stainless steel frame & Aluminum frames and leveling provision on this member. For jacking
the sill member use temporary M10 bolts (not provided by us) which should be flushed by
cutting or grinding with the surface after grouting in case these are projecting above the channel
invert. The entire face of the bottom sill should be in a perfect horizontal plane to minimize the
leakage from between the bottom sill face and the bottom seal of log no. 1.

Figure (f1)

Figure (f2)

-8-
7. Check the vertical plane of the entire face of the side members using bubble level and if the
plane is not correct then use the M10 tapped holes given on the vertical side members to bring
the vertical side members in vertical plane. Refer to figure ( f1 & f2 ) above showing cross
section of vertical side member for Stainless steel frame & Aluminum frame and leveling
provision on this member. For jacking the vertical side member use temporary M10 bolts (not
provided by us).

8. Generally during manufacturing of aluminum stoplogs the clearance between the frame and the
log segments is maintained 4 mm minimum on each side & 8 mm maximum on each side. In
case of Stainless steel / Composite stoplogs this gap is maintained 8 mm minimum on each side
& 12 mm maximum on each side depending upon the log width and overall height of the frame.
Check GA drawing to see the exact clearance provided in your ordered stoplogs. While installing
the frame ensure that the entire frame height is in plumb within 2 mm from top to bottom so as to
avoid any interference during log up and down movement.

9. In case of stoplogs provided with frame mounted side seals, the side rubber seal is kept 1 to 2
mm longer than the frame segment length. During installation this side seal should be suitably
sized by carefully cutting and matched with the corresponding side seal mounted on the lower
frame portion so that no gap exists at the joint in the seal. This joint should then be glued
together using adhesive (like Loctite-495 or similar adhesive) so as to offer a continuous joint
free seal from bottom to top of frame.

10. Once the entire frame assembly is placed in position then after thoroughly cleaning the stoplog
frame assembly, unpack the stoplogs and clean them from any dirt / dust which may have
entered the packing. Thoroughly clean the mating faces of stoplogs which will come in contact
with sealing arrangement in the frame assembly.

11. Now bring a log segment and move it within the frame from top to bottom to check for
interference free smooth movement. This should be done a few times to verify correctness of
frame position. For this check, the log can either be manually handled or handled using a lifting
beam, if provided. To understand the procedure for use of lifting beam refer to “Operation of
Stoplogs” given later in this manual.

12. If interference free smooth movement from top to bottom of log frame is not observed then it
means that frame position needs to be corrected.

13. Check the squareness between the bottom sill and side segments of frame, check the plumb of
the side segments and also the distance between the side segments.

14. Once interference free movement is achieved then only proceed with the grouting.

15. Shutter up the gap between the side walls and either sides of the side frame segments along the
two vertical walls of the channel and on either side of the bottom sill and the floor of the channel.

16. Carefully pour high precision, non-shrink, quick setting fluid grout in the gaps between the
groove and stoplog frame ensuring that the gap is totally filled. While pouring the grout ensure
that no grout goes inside C-portion of the side segments where rubber seals are mounted. Allow
grout to cure thoroughly, usually allowing at least six clear days for proper curing. Clean off any
excess grout material.

-9-
In case of a multi-piece frame, grouting on sides should not be done up to the top end of the side
segments. A distance of at least 300 mm (12”) from the top end of the side segment should be
left un-grouted to enable removal of tie bar and fitment of subsequent side segment number II.

17. After the grout is set, remove the tie bar (painted red) fixed to the top of side segments no. I and
also remove all the bracing support flats as well as the shuttering.

18. Recheck the plumb and alignment of the grouted segments to confirm that the initial setting is
correct. If it is observed that the plumb and alignment got disturbed during grouting then break
open the fresh concrete to remove the segments. Thereafter once again carry out the above
mentioned procedure and get the correct installation of segments.

19. If the setting is correct allow sufficient days for the grout to cure thoroughly.

With the above procedure, installation of single-piece frame in grooves provided in wall is complete.
-------------------------------------------------------------------------------------------------------------------------

(B) INSTALLATION PROCEDURE FOR FRAME IN GROOVES IF SUPPLIED IN


MULTIPLE PIECES

However for multi-piece frame of stoplog following additional processes needs to be carried out.

1. Commence with the next stage of installation in which side segments no. II (L&R) are to be
mounted on the grouted side segments no. I (L&R).

2. For this remove the side segments no. II from its packing box and check their correctness from
the drawing.

3. Thereafter fasten side segments no. II (L&R) on top of side segment no. I (L&R) ensuring that
tongue and groove are properly seated. In case of stoplogs provided with frame mounted side
seals, the side rubber seal is kept 1 to 2 mm longer than the frame segment length. During
installation this side seal should be suitably sized by carefully cutting and matched with the
corresponding side seal mounted on the lower frame portion so that no gap exists at the joint in
the seal. This joint should then be glued together using adhesive so as to offer a continuous joint
free seal from bottom to top of frame.

4. After the side segments are bolted up, tie the top ends of the right and left side segments no. II
using the tie bar (painted red).

5. Check the plumb of the side segments no. II as well as the distance between the side segments.

6. Follow procedure described in point 6 and 14 as above.

7. Follow the procedure described above for fastening all the balance side segments over each
other.

8. Once all the side segments i.e. from segments I (L&R) to segments topmost segment are grouted
then check for correctness of alignment and verticality of all the segments.

9. Clean all the segments from any concrete or grout adhering to it.

- 10 -
10. Remove the masking tape from the sealing face of the rubber seal and clean the rubber seal.

With the above procedure installation of multi-piece frame in grooves provided in wall is complete.
-----------------------------------------------------------------------------------------------------------------------

WARNING:

Each stoplog assembly is tested for non-acceptance of 0.1 mm thick feeler gauge between mating
sealing faces of sectional stoplogs and stoplog frame before dispatch from plant. Stoplogs are
dispatched only when they meet the seal clearance criteria specified in applicable standard /
specification and as accepted by JASH during the finalization of order. Improper installation
may result into deterioration in stop log seal clearance criteria and thereby affect leakage
performance for which JASH cannot be held responsible.

Hence JASH assumes no liability for leakage performance and interference free movement
of stoplogs if the entire installation has not been done under the supervision of a competent
Engineer following JASH instructions.
-----------------------------------------------------------------------------------------------------------------------

- 11 -
OPERATION OF STOPLOGS

The supplied stoplogs can be lifted or lowered in its frame by (A) using mechanized hoisting
arrangement and a Lifting Beam, or (B) manually using Lifting Rods. Please verify from the
approved GA drawing the type of arrangement offered for lifting / lowering of stoplog in the
stoplog frame. After ascertaining this, follow the installation procedure (A) or (B) as given
hereunder.

(A) USING MECHANIZED HOISTING ARRANGEMENT AND A LIFTING BEAM :

To check whether the stoplog frame assembly is correctly installed and to check for unobstructed
and smooth operation of sectional stoplogs in frame assembly, the first stoplog should be lowered
from top to bottom and then lifted back from bottom to top a few times using lifting beam. Adopt the
procedure as given below for this:

1. Pickup the lifting beam using a hoist / crane provided for this purpose.

2. Bring lifting beam above the log placed on the floor / storage rack and lower it on the log so
as to engage the hook provided on lifting beam with the log pins. Refer figure ( g ).

Figure (g)

3. When the lower tapered portion of the hook touches the lifting pin of the log, the hook
assembly moves apart and allows it to engage with the stoplog pins. Hence engagement of
lifting beam to log is automatic. Refer figure ( k ).

Figure (k)

- 12 -
4. Once this is done, the stoplog can be lifted along with the lifting beam. Take the lifting beam
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l1 ) to understand the sealing arrangement provided on sides and bottom in
case of frame mounted seals.

Figure (l1)

Refer figure ( l2 ) to understand the sealing arrangement provided on sides and bottom in
case of log mounted seals.

Figure (l2)

5. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
- 13 -
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.

6. Subsequently raise the stoplog along with the lifting beam till the top of the frame assembly
while simultaneously checking for non-acceptance of 0.1 mm thick feeler gauge between
mating sealing faces of sectional stoplogs and stoplog frame at various points
7. Once all the checks as well as down and upwards movements are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs. To do this the first
stoplog has to be re-lowered to the bottom most position.

Figure (m)
8. When the log reaches the bottom most position then further lowering of the lifting beam will
allow the hooks to go below the pins of the log. To take the hook away from the pin and
disengage the lifting beam from the log, pull the nylon rope provided at the center of the
lifting beam. Refer figure ( m ).

9. Keeping the nylon rope taut, lift the lifting beam using the hoist.

10. Remove the lifting beam from the frame assembly and engage it with the subsequent log.

11. Repeat the procedure 2 to 10 for further installation of logs into the frame.

12. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.

(B) MANUALLY USING LIFTING RODS:

The lifting rod pickup arrangement is suitable where the log weight is low, the log width is less
and the installation depth is less i.e. in all those cases where the logs can be easily lifted
manually. The lifting rod arrangement are of two types (i) suitable for engaging with lifting pins
provided on sides of the stoplogs, (ii) suitable for engaging with dovetail slot provided on top of
the logs. (Only in case of Aluminum Logs)

Depending upon the type of lifting rod arrangement provided follow any of two procedures
given hereunder :

- 14 -
(i) Using lifting rod suitable for engaging with lifting pins provided on sides of the stoplogs :

1. Bring the lifting rods above the log placed on the floor and lower it on the log so as to engage
the hook provided on lifting rod with the log pins. Refer figure ( n ).

Figure (n)

2. Once this is done the stoplog can be lifted along with the lifting rods. Take the lifting rods
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l ) to understand the sealing arrangement provided on sides and bottom.

3. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.

4. Subsequently raise the stoplog till the top of the frame assembly while simultaneously
checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing faces of
sectional stoplogs and stoplog frame at various points.

5. Once all the checks as well as down and upward movement are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs.

6. Repeat the procedure 1 to 5 for further installation of logs into the frame.

7. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.

(ii) Using lifting rod suitable for engaging with dovetail slot provided on top of the stoplogs :
- 15 -
1. Bring the lifting rods above the log placed on the floor and engage them with the log. To
engage, insert the lifting rod in to the dovetail slot provided on the top of the log by keeping
the lifting rod in position as shown in figure ( o ). Thereafter rotate the lifting rod by 90°.
This will allow the rod to get engaged with the dovetail slot of the log. Refer figure ( p ).

Figure (o)

2. Once this is done the stoplog can be lifted alongwith the lifting rods. Take the lifting rods
with the log to the installed frame location and lower the assembly into the frame groove.
Keep on checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing
faces of sectional stoplogs and stoplog frame at various points while lowering of stoplogs.
Refer figure ( l1 & l2 ) to understand the sealing arrangement provided.

Figure (p)

3. Once the stoplog comes to a rest at the bottom portion of the frame then check for non-
acceptance of 0.1 mm thick feeler gauge between mating sealing faces provided at bottom of
sectional stoplogs and the bottom member of stoplog frame at various points across the
width.

4. Subsequently raise the stoplog till the top of the frame assembly while simultaneously
checking for non-acceptance of 0.1 mm thick feeler gauge between mating sealing faces of
sectional stoplogs and stoplog frame at various points.

5. Once all the checks as well as down and upward movements are found satisfactory then the
frame assembly is ready for insertion of balance sectional stoplogs.

6. To disengage lifting rod from the stoplog rotate the lifting rod by 90° and pull the rods out of
stoplog dovetail slot.
- 16 -
7. Repeat the procedure 1 to 6 for further installation of logs into the frame.

8. After inserting all the sectional stoplogs, recheck the seat clearance on the sides, bottom
invert and between two sectional stoplogs. Once this is found OK then the installation is
ready for water leakage testing and thereafter for commissioning.

---------------------------------------------------------------------------------------------------------------------

- 17 -
MAINTENANCE INSTRUCTIONS:

“DO’S”

1. Before Stoplogs are put into regular service or after being left in storage for considerable length
of time, each stop log should be raised and all foreign matter carefully removed from the mating
sealing faces on stop log sides as well as on the top. Also the sealing face of the bottom seals
should be cleaned and checked for damage if any during storage.

2. The nuts of all constructional and foundation bolts should be checked for tightness every twelve
months.

3. If the stoplogs are installed in situations where debris or foreign matter can build up then it is
recommended that the stop log frame grooves be periodically cleaned out of any debris so that
when the stoplogs are to be inserted in an emergency the operator faces minimum problems.

4. The protective paint on all painted items should be examined every six months for signs of
damage.

5. ALL LIFTING EQUIPMENT, lifting beams, lifting poles, lifting slings, shackles etc. must be re
tested in accordance with in Country standards for this type of equipment. ALWAYS wash off
with clean water after use, grease moving parts and CHECK for any visually check for damage.

6. MAKE SURE! The surrounding access area around any stop log frame, log insertion point is free
from clutter; one small mistake can injure or cause a life threatening event.

7. Treat this equipment with respect and it will perform to your expectations.

- 18 -
“DON’TS”

“DON’TS”

1. Do not store stoplogs in a way that these are exposed to sunlight as this would reduce the age of
the log seals.

2. Do not store stoplogs in a way that they get twisted over prolonged storage periods.

3. Do not store stoplogs in a way that the invert seals or side seals (if provided) remain
continuously pressed as this would reduce the effectiveness of the log invert seals.

4. Do not sling or handle the stoplogs, while transporting from storage to installation site or from
installation site to storage area, in a way that the log invert seals or the mating sealing area on
sides of logs gets damaged by slings or tackles used in handling.

5. NEVER use stoplogs designed for another application in a different location, they may be under
designed for that application.

6. NEVER WALK UNDER ELEVATED STOPLOGS, THEY MIGHT FALL.

7. If in doubt please ASK.

-------------------------------------------------------------------------------------------------------------------------

- 19 -
TROUBLE SHOOTING AT SITE

There are a number of problems that can arise with stoplogs at site. We are giving some of these
problems and the methods of repair. Hence before requesting a site visit of the manufacturer’s
representative, the contractor should check the problem faced and carryout trouble shooting as
per guidance given hereunder.

(A) Tight movement or jam in movement of stoplog:

Jash stoplogs are supplied duly factory tested for movement. Hence if movement problem is
encountered then possibly it is outcome of faulty installation at site. JASH cannot be held
responsible for any faulty installation by client / contractor. The reasons attributing for this problem
are as under

- Twisted or distorted frame installation.


- Non parallel frame installation.
- Due to improper joining of frame segments during installation. (In case frames are supplied
in multi piece).
- Due to improper joining of frame rubber seals. (In case frames are supplied in multi piece).

Before final installation of the frame & pouring the second stage grout, checking for the interference
free movement of the stoplog in the frame is most important activity. If the interference free
movement is not observed at that point then do rectify this as at a later stage this becomes a very
laborious work. Once this problem is observed then verify where the movement of stoplog is
affected. Check as to whether any adjustment in frame can be done in this area. If no adjustment can
be done then only option is left is to remove the installed frame and reinstall strictly in line with
procedure given under chapter “INSTALLATION PROCEDURE FOR STOPLOG FRAMES”.

(B) Leakage:

Leakage is the problem that is most often encountered. However some leakage is permissible for this
product and hence do not expect zero leakage. Hence before requesting a site visit, the contractor
should check the quantum of leakage. Please verify the permissible leakage norms as per the
standard / technical specifications against which the supply is made or verify from QAP /
contract documents the agreed permissible leakage norms. If the leakage is observed to be
within permissible limits then there is no need for a site visit.

Leakage at site is mostly a result of improper erection (installation) or damage to the sealing
arrangement. If the erection has been done correctly, without twisting and distorting the frame or
face wall anchored stoplogs and if the sealing arrangement is not damaged then excessive leakage is
generally not observed.

If the leakage is way above the permissible limits then the contractor should carry out further checks
as follows:

1. Check for any damage to sealing arrangement. If seals are found damaged then replace them.

2. In case of multipiece stoplogs when seal joints of frame mounted side seals are not correctly
joined and glued then there is fair possibility of leakage from this joint. Under sized cutting
of side seals at joint can result into gap in the seal leading to leakage and over size cutting of

- 20 -
side seals at joint can result in to bulging of seals also leading to leakage. Undersized cut seal
joints have to be replaced and oversized cut seal joint has to be recut properly.

3. Check for concrete or paint or other foreign substance on the sealing area. It is not difficult to
get paint or foreign substance on the sealing area even in the shop and hence in the field it is
very difficult to prevent paint, concrete or other foreign substance from getting on to the
sealing area. This can happen during installation of stoplogs or while carrying out subsequent
civil work around the stoplogs installation, and during carrying out painting after installation
of the stoplogs.

First remove the stoplogs and check the mating sealing area on the stoplogs. If there is paint
or other foreign substance on the sealing faces of frame and logs then this should be cleaned
by scraping and removing the same without damaging the surfaces.

4. Leakage from the bottom sill area at channel invert can be on account of collection of
concrete or asphalt on the top of bottom sill member on which the bottom most stop log rests.
The solution is to scrape and remove this foreign material without damaging the seal while
doing so. To do so the stoplogs have to be lifted for access to top portion of bottom sill
member.

(C) Stoplogs will not operate or operate with difficulty:

This is another category which can involve a number of problems.

1. The stoplogs will not close all the way. The most obvious problem would be an obstruction
beneath the stop log at the invert level due to debris. Hence cleaning of this debris is required
to be done to enable the stop log to close.

2. Difficulty in lowering or lifting stoplogs or jamming of stoplogs in the grooves during lifting
or lowering is encountered. This is mostly on account of improper balancing of stop log
lifting arrangement resulting into unbalanced movement of stoplogs in grooves.

_________________________________________________________________________________
END OF MANUAL

- 21 -
10-Country of Origin
COUNTRY OF
ORIGIN
(SAMPLE)
1. Goods consigned from (Exporter's business name, address. country)
*"""::;,o&l=LJo[,E,*
JASH ENGINEERING LIMII I D I
(NON PREFERENTIAL)
Plot No. M-19, lndore Special Icorrorrric Zo{c, (Combined Declaration and Certificate)
Phase-tl, Misc. Zorte, Pithampur-'1i;d77'j lssued in lndia
Madhya Pradesh lndia I

GSTIN:23AAACJ7699F3ZA I

2. Goods consigned to (Consignee's name, address. pountry)


AL RATDA TNGINEERING & INDUSTRIAL sr.t{licrs w.L.L
ESTD: 1929
oFFlcE-503, 5TH FtooR, BU I LDING'4 n trr f, Ht s l-ltt': F'T" s3

ZONE'24, tvIUNTAZAH,DOHA DOHA -1.,,,[n The Memon


Dolra Qat.rr
Phone: 44329001 Fax: I

I
Chamber of Commerce
Email:Chetlran.Noronha@alraida.conr I Patharia Palace, 75, Mohammedali Road,
MUMBAI - 400 003. (rNDrA)
fel:2342 1109 . Fax:2341 3661
E-mail : info@memonchamber.com
3. Means of transport and route (as far as known)- 4. For Otficial use
RY S[A
Port of Loatlinn: l(HAVA Sl'IEVA ll'lDlA
PoIt of Dis(lrarge: 'D0llA,QAlAit

5. ltem 6. Marks and 7. Number and kird of packages, 8. Origin . Gross weight 10. Number and
No. numbers of description rf goods criteria or other quantity date of invoices
packages

02 PACKAGE I

wHoLl.y PRoDucro ,"]lorurnarutl:D lr; rNDIA IN DlA GROSSJ W'i.


CASE NO rrc (HS ) e *,* cootl :- 73089090 1060.00 ls
kcq
sEZOT/07 I
TO Gato Assv FG /r11 3 2hXl4,Electrif 2 336.90
sEz 02/o2 ss pENST,C* ,,rn,rull* 6CC {}l) l'11'^ i "1OS iBS
I
Garo A!sv FG /r113 d,lX24.{:lcclri( NF.I Y/T
PUNCH SEAI sS PENSTocK : 600 il/v) x {-r00 (H} r\4M 1 NoS 840 00
KGS
I

JASH.PI H sPARE PARTS Foti.GhTE i oll l.o(1


THRL]ST NUT-' n,O' I LBS
I
I
SPARt pAnls r'-:n-car[
sr AL Krr to,.,
^crurlto,,
. ', *ct C Certilied tha the goods specifle
here in are o 'lndian Original
f' and not of Israeli
Manufacturt
Origin manu lacture not do i rIeJ
11. Certification Y"A'^l-11"t"'tlA*' i i the exporter

V
It is hereby certified,on the basis of control carriecl out, that the declaration by the I The undersig ned hereby declares that the

M
exporter is correct I above details and statements are correct and
r

ply with the origin requirements

ffi l:
I

I lmporting Co ;id,

nt-.-. 't I t t:"


Ul.iLielri r'\. irlc,ll( I
::t: n
11-Test Reports
FINAL INTERNAL INSPECTION REPORT
JASH Engineering Ltd. Cover Page
R:08:05:01:08:01
FIR No JAE-QA-35/I/2022
SOS No JAE-QA-35
Client: Al Raida Engineering & Industrial Services WLL

Customer: -

Consultant: -

Project: D-RING ROAD IMPROVEMENT WORKS (PROJECT ID: PA 2019 C 109 G)

PO No: REISCO-JAS/21/011-120

Product: SS FRAME 1000 {W) x 1550 {H) , STOP LOG SHUTTER 1134 {W) x 334 {H)

Quantity: 01 SET + 01 SET (03 Nos/ Set)


Enclosures:
S No Description For Distinctive No No of pages
SS BS EN 10088-2
GRADE JEL-JRD/QA/2021-
1 Frame 01
1.4401 / 1.4404 (SS 22/DOM/01098209
TYPE 316 / 316L)
SS BS EN 10088-2
GRADE JEL-JRD/QA/2021-
2 Stop Log 01
1.4401 / 1.4404 (SS 22/DOM/01098209
TYPE 316 / 316L)

040/20-21
3 EPDM ASTM D2000 Rubber Seal 02
201/21-22

Name HIREN PANDYA


Department Head- Quality Control
Date 16.02.2022
FINAL INTERNAL INSPECTION REPORT
JASH Engineering Ltd. R:08:05:01:08:02
FIR No JAE-QA-35/I/2022
SOS No JAE-QA-35
Type of Product S.S FRAME WITH S.S STOP LOGS Size/ Model Ø1000 mm
Approved Data sheet
Approved GA Drg No GA-A-QTN-1210002452001 R0 NA
Ref. No
ITP/STOP LOG/QA-35/001 -
QAP Ref No: Quantity 1 SET
Rev-0 date: 09/12/2021
A. DIMENSIONAL REQUIREMENTS
Observed
Specified
S. No. Description TAG NO.
Sizes in mm
JASH SR. NO
1 Stop log frame dimension 202112001

a) Opening width 1000 1000

b) Total width of frame 1176 APPX. 1175

c) Total height of frame assembly 1550 APPX. 1550

2 Stop log Dimension LOG 1 LOG 2 LOG 3

a) Height of stop log 334 335 334 335

b) Length of stop log 1134 1135 1136 1135

c) Log width 116 115 116 115

d) Pin c/c 550 550 551 551

B. TEST REQUIREMENT
S. No. Description Specified Observed

0.10 mm feeler
1 Seat clearance gauge should not CONFIRM --- ---
Pass through out

Smooth Interference
2 Movement CONFIRM --- ---
free movement
Approved By Inspected By

Name HIREN PANDYA Name KRISHNA RAJAK


DH- Quality Control SH- Quality Control
Date 16.02.2022 Date 16.02.2022
12-Sample with material, company
and country details
SAMPLE NAME
PLATE
13-Spare Parts
SPARE PARTS
LIST
SPARE PARTS LIST FOR STOPLOG

Contractor: AL JABER ENGINEERING WLL.

Project: CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT DOHA NORTH STW


PACKAGE 3 – C823/3
Client: PUBLIC WORK AUTHORITY ASHGHAL – (PWA)

Manufacture: JASH ENGINEERING LIMITED - INDIA

Supplier AL RAIDA ENGINEERING AND INDUSTRIAL SERVICES WLL.

Item
Description of Goods Unit Qty
No.

MANUFACTURER RECOMMENDED SPARE PARTS LIST FOR TWO YEARS OPERATION

SIDE RUBBER SEAL Set 4


1
FOR STOP LOG GUIDE FRAMES 5 Mtrs. in 1 Set

31, SECTOR ‘C’, INDUSTRIAL AREA, SANWER ROAD, INDORE 452 015 (M.P.) INDIA
PH: 0091-731-4232900, 2720143 / FAX : 0091-731-2720499
E-mail : info@jashindia.com / Website : www.jashindia.com
14-Warranty Certificate
SAMPLE
WARRANTY
CERTIFICATE
15-Valid ISO and other
management certificates (9001,
14001 & 18001)
ISO
CERTIFICATES
ISO CERTIFICATES
FOR SUPPLIER
Thi
sist
ocer
ti
fythatt
he
Qual
it
yManage
me ntSys
temof

ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR

hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof

I
SO9001:
2015
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.

Cert
if
icat
eNo. :
BQSR15382
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025

-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)

Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
Thi
sistoc
ert
ifyt
hatthe
Env
ironment
alManagementSys
temof

ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR

hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof

I
SO14001:
2015
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.

Cert
if
icat
eNo. :
BQSR15383
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025

-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)

Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
Thisi
stoc
ert
if
ythatt
he
Oc
cupat
ionalHealt
h&Safe
tyManageme
ntSy
ste
mof

ALRAI
DAENGI
NEERINGANDINDUSTRI
AL
SERVI
CESW.L.
L
P
.O.BOXNO:24875,DOHA,QATAR

hasbe
enas
ses
sedandf
oundt
oconf
ormt
other
equi
reme
ntsof

I
SO45001:
2018
Thi
sCe
rti
fi
cat
eisv
ali
dfort
hef
oll
owi
ngs
cope
:
•GENERALCONTRACTSFORBUI LDINGSANDBUI LDINGMATERI ALS
•WORKSCONNECTEDTOTHEWATERLI NESANDNETWORKS
•SEWAGECONTRACTS
•TRADINGOFPROFESSI ONALCLOTHES,MECHANI CALTOOLS,
ALARMSANDFI REEXTI NGUI
SHING& SAFETYEQUI PMENTSAND
DEVICES,PI
PES,FITTINGSANDPI PEACCESSORIES,WATERMETERS,
PAI
NTS& COATI NGS,VALVES,FUSES,TAPSINDUSTRIALVALVES,
FLOW CONTROLEQUI PMENT,AIRPURI FI
CATIONEQUIPMENT,
MEASUREMENTI NSTRUMENTS,CONTROLDEVI CESANDEQUI PMENT.

Cert
if
icat
eNo. :
BQSR15384
Regi
str
ationDate :
14/
05/
2022
Is
sueDate :
17/
05/
2022
Expi
ryDat e :
13/
05/
2023
Rece
rti
fic
ationDate :
13/
05/
2025

-
Di
rec
tor
BQSRQUALI
TYASSURANCEPVT.
LTD.
KeyLo c
ati
on:
183Br o
adway,
Ste210Hi c
ksvil
le,
NewYo rkNY11801, USA
Ope
rat
ionsOff
ic
e:D303,104-
108,Nis
argPlaza
,Wa kad,Pune-411057.|Web:www.
bqs
rce
rt.
com
Accr
edit
edbyIAS(0360Sat
urnStre
et,Sui
te100,Brea
,Ca l
if
orni
a92821U.S.
A.)

Fo
rv e
rif
ic
ati
ona ndupda
tedinf
ormati
onconce
rni
ngthepre
sentce
rti
fi
cat
e,pl
eas
evi
si
twww.bqs
rcer
t.
com TheCe
rti
fi
cat
eisval
idf
orpe
rio
do f3year
ssubj
ectt
o
sa
tis
fac
toryannuals
urvei
ll
anceaudi
t.Thi
sCert
if
ic
atei
sthepro
pert
yo fBQSRQuali
tyAs
suranc
ePvt.Ltd.
&shal
lberet
urnedi
mmediat
elywhe
nde ma
nded.
ISO CERTIFICATES
FOR
MANUFACTURER
JASH ENGINEERING LIMITED

HEAD OFFICE : PLOT NO. 31, SECTOR ‘C’, INDUSTRIAL AREA, SANWER ROAD,
INDORE – 452 015, MADHYA PRADESH, INDIA.
This is a multi-site certificate, additional site(s) are listed on the next page(s)

Bureau Veritas Certification Holding SAS – UK Branch certifies that the Management
System of the above organization has been audited and found to be in accordance
with the requirements of the Management System standards detailed below.

Standards

ISO 9001:2015, ISO 14001:2015 &


ISO 45001:2018
Scope of certification

CONSOLIDATED SCOPE: DESIGN, MANUFACTURE AND DESPATCH OF WATER


CONTROL EQUIPMENT, SCREENING EQUIPMENTS, SCREENING CONVEYING
AND WASHING EQUIPMENTS, KNIFE GATE VALVES, VALVES FOR ISOLATION &
METERING OF BULK SOLIDS, WATER HAMMER CONTROL VALVES, ENERGY
DISSIPATING VALVES, SCREW TURBINES AND PUMPS, SCREW CONVEYORS,
WATER & WASTE WATER PROCESS EQUIPMENT OF ALL TYPES
AND CI CASTINGS

Original cycle start date for ISO 9001: & ISO 14001: 20 March 2018
Original cycle start date for ISO 45001: 10 April 2020
Expiry date of previous cycle: 19 March 2021
Recertification Audit date: 31 December 2020
Recertification cycle start date: 17 March 2021
Subject to the continued satisfactory operation of the organization’s Management System,
this certificate expires on: 16 March 2024

Certificate No. IND.21.1893/IM/U Version : 1 Revision date: 17 March 2021

Signed on behalf of BVCH SAS – UK Branch


Jagdheesh N. MANIAN
Head – CERTIFICATION, South Asia
0008
Commodities, Industry & Facilities Division
Certification body 5th Floor, 66 Prescot Street, London, E1 8HG, United Kingdom.
address:
Local office: Bureau Veritas (India) Private Limited (Certification Business)
72 Business Park, Marol Industrial Area, MIDC Cross Road "C", Pg 1 of 2
Andheri (East), Mumbai – 400 093, India.
Further clarifications regarding the scope of this certificate and the applicability of the
management system requirements may be obtained by consulting the organization.
To check this certificate validity please call +91 22 6274 2000.
JASH ENGINEERING LIMITED

Standards

ISO 9001:2015, ISO 14001:2015 &


ISO 45001:2018
SITE ADDRESS SCOPE

PLOT NO. 31, UNIT 1 (SANWER ROAD): DESIGN, MANUFACTURE AND


JASH SECTOR ‘C’.INDUSTRİAL AREA, DESPATCH OF WATER CONTROL EQUIPMENT, SCREENING
ENGINEERING SANWER ROAD, EQUIPMENTS, SCREENING CONVEYING AND WASHING
LIMITED- INDORE – 452 015, EQUIPMENTS, KNIFE GATE VALVES, VALVES FOR
SANWER ROAD MADHYA PRADESH, INDIA. ISOLATION & METERING OF BULK SOLIDS AND
CI CASTINGS.

UNIT 2 (BARDARI): MANUFACTURE AND DESPATCH OF


SURVEY NO. 74,GRAM
JASH WATER CONTROL EQUIPMENT, SCREENING EQUIPMENT,
BARDARI,NEAR SANWER ROAD,
ENGINEERING SCREENING CONVEYING AND WASHING EQUIPMENT,
TEHSIL SANWER,
LIMITED- WATER HAMMER CONTROL VALVES, SCREW TURBINES
INDORE – 453 111,
BARDARI AND PUMPS, SCREW CONVEYORS, WATER & WASTE
MADHYA PRADESH, INDIA.
WATER PROCESS EQUIPMENT OF ALL TYPES.

UNIT 3 (SEZ): MANUFACTURE AND DESPATCH OF WATER


SEZ:- PLOT NO. M-11, PHASE CONTROL EQUIPMENT, SCREENING EQUIPMENT,
JASH
II,SEZ, PITHAMPUR – 454 775, SCREENING CONVEYING AND WASHING EQUIPMENT,
ENGINEERING
DISTRICT DHAR, KNIFE GATE VALVES, ENERGY DISSIPATING VALVES,
LIMITED-SEZ
MADHYA PRADESH, INDIA. SCREW CONVEYORS, VALVES FOR ISOLATION & METERING
OF BULK SOLIDS.

UNIT 4 (SEZ): MANUFACTURE AND DESPATCH OF WATER


JASH
SEZ :-PLOT NO M 19 PHASE II , CONTROL EQUIPMENT, SCREENING EQUIPMENT,
ENGINEERING
SEZ, PITHAMPUR – 454 775, SCREENING CONVEYING AND WASHING EQUIPMENT,
LIMITED-
DISTRICT DHAR, MADHYA KNIFE GATE VALVES, ENERGY DISSIPATING VALVES,
SEZ(RODENY
PRADESH , INDIA. SCREW CONVEYORS, VALVES FOR ISOLATION & METERING
HUNT)
OF BULK SOLIDS.

Certificate No. IND.21.1893/IM/U Version: 1 Revision date: 17 March 2021

Signed on behalf of BVCH SAS – UK Branch


Jagdheesh N. MANIAN
Head – CERTIFICATION, South Asia
0008
Commodities, Industry & Facilities Division
Certification body 5th Floor, 66 Prescot Street, London, E1 8HG, United Kingdom.
address:
Local office: Bureau Veritas (India) Private Limited (Certification Business)
72 Business Park, Marol Industrial Area, MIDC Cross Road "C", Pg 2 of 2
Andheri (East), Mumbai – 400 093, India.
Further clarifications regarding the scope of this certificate and the applicability of the
management system requirements may be obtained by consulting the organization.
To check this certificate validity please call +91 22 6274 2000.
NSF
CERTIFICATES
CE
CERTIFICATES
TO THE MACHINERY DIRECTIVE – 98/37/EC

Project No.: DL05000034-71Q


Type of Product: SLUICE GATES
Document holder: JASH ENGINEERING LIMITED
31, SECTOR ’C’ INDUSTRIAL AREA SANWER ROAD INDORE – 452 015 (M.P) INDIA
Manufacturer: JASH ENGINEERING LIMITED
31, SECTOR ’C’ INDUSTRIAL AREA SANWER ROAD INDORE – 452 015 (M.P) INDIA
Type designation: PLEASE SEE ANNEXURE

Trademark: -

This Notice of Presumption of Conformity has been based on the following:

• Safety test report issued by Intertek with reference number DL05000034-001


• Applicable standard: EN 982, BS 7775
• Other info: Manufacturer’s Technical File
• Manufacturer ensures that the manufactured products will be identical to the samples evaluated

We confirm that the samples evaluated, according to our review of the above test reports and with our
complementary evaluation, without any reasonable doubt will fulfil the requirements according to following
mentioned standards

The product was found to contain the required items for CE Markings according to:
• Machinery Directive – 98/37/EC
• EN 982
• BS 7775

Note: Products entering the European Union are subject to the requirements set forth in the European Directives. It is the responsibility of the
person placing the product on the European market to ensure compliance with applicable Directives. Our services are intended to provide you
with the data needed to determine compliance, but the person placing the product on the European market still has the responsibility to ensure
each product complies with the applicable Directives. Our report under this investigation will not imply that ETL SEMKO has Listed, Verified, or
Recognized the product, nor does it authorize the use of Listing or Verification Marks or other reference to ETL SEMKO, on or in connection with
the product.

Intertek Testing Services India Pvt. Limited Anirban Bhattacharya


52, Okhla Industrial Estate, Phase III, New Delhi – 110 020, India Authorised Signatory
Tel: + 91 (0)11 5159 5400 Fax: +91 (0)111 5159 5475 September 20, 2006
http://www.intertek-etlsemko.com

This certificate may only be reproduced in its entirety and without any change.

Page 1 of 2
ANNEXURE

NO. CONSTRUCTION TYPE OF GATE TYPE OF MOUNTING MODEL NUMBER

1 Cast Iron Flat / Flange Back Frame Sluice Gate Thimble Mounted C-FSG-TM

2 Cast Iron Flat / Flange Back Frame Sluice Gate Face Wall Mounted C-FSG-WM

3 Cast Iron Spigot Back Frame Sluice Gate Face Wall Mounted C-SSG-WM

4 Cast Iron Open Channel Sluice Gate Channel Mounted C-OCG-CM

5 Cast Iron Downward Opening Weir Gate Face Wall Mounted C-DWG-WM

6 Cast Iron Downward Opening Weir Gate Thimble Mounted C-DWG-TM

7 Cast Iron Flap Gate / Valve Thimble Mounted C-FG-TM

8 Cast Iron Flap Gate / Valve Face Wall Mounted C-FG-WM

9 Co-Plastic Flat Back Frame Slide Face Wall Mounted CP-FSG-WM

10 Co-Plastic Open Channel Sluice Gate Channel Mounted CP-OCG-CM

11 Co-Plastic Open Channel Sluice Gate Face Wall Mounted CP-OCG-WM

12 Co-Plastic Downward Opening Weir Gate Face Wall Mounted CP-DWG-WM

13 Fabricated Flat / Flange Back Frame Slide Gate Face Wall Mounted F-FSG-WM

14 Fabricated Open Channel Sluice Gate Channel Mounted F-OCG-CM

15 Fabricated Open Channel Sluice Gate Face Wall Mounted F-OCG-WM

16 Fabricated Downward Opening Weir Gate Face Wall Mounted F-DWG-WM

17 Fabricated Stop Logs Channel Mounted F-SL-CM

19 Fabricated Stop Logs Face Wall Mounted F-SL-WM

19 Co-Plastic Stop Logs Channel Mounted CP-SL-CM

20 Co-Plastic Stop Logs Face Wall Mounted CP-SL-WM

Page 2 of 2
TO THE MACHINERY DIRECTIVE – 98/37/EC

Project No.: DL05000034-71Q


Type of Product: SLUICE GATES
Document holder: JASH ENGINEERING LIMITED
31, SECTOR ’C’ INDUSTRIAL AREA SANWER ROAD INDORE – 452 015 (M.P) INDIA
Manufacturer: JASH ENGINEERING LIMITED
31, SECTOR ’C’ INDUSTRIAL AREA SANWER ROAD INDORE – 452 015 (M.P) INDIA
Type designation: PLEASE SEE ANNEXURE

Trademark: -

This Notice of Presumption of Conformity has been based on the following:

• Safety test report issued by Intertek with reference number DL05000034-001


• Applicable standard: EN 982, BS 7775
• Other info: Manufacturer’s Technical File
• Manufacturer ensures that the manufactured products will be identical to the samples evaluated

We confirm that the samples evaluated, according to our review of the above test reports and with our
complementary evaluation, without any reasonable doubt will fulfil the requirements according to following
mentioned standards

The product was found to contain the required items for CE Markings according to:
• Machinery Directive – 98/37/EC
• EN 982
• BS 7775

Note: Products entering the European Union are subject to the requirements set forth in the European Directives. It is the responsibility of the
person placing the product on the European market to ensure compliance with applicable Directives. Our services are intended to provide you
with the data needed to determine compliance, but the person placing the product on the European market still has the responsibility to ensure
each product complies with the applicable Directives. Our report under this investigation will not imply that ETL SEMKO has Listed, Verified, or
Recognized the product, nor does it authorize the use of Listing or Verification Marks or other reference to ETL SEMKO, on or in connection with
the product.

Intertek Testing Services India Pvt. Limited Anirban Bhattacharya


52, Okhla Industrial Estate, Phase III, New Delhi – 110 020, India Authorised Signatory
Tel: + 91 (0)11 5159 5400 Fax: +91 (0)111 5159 5475 September 20, 2006
http://www.intertek-etlsemko.com

This certificate may only be reproduced in its entirety and without any change.

Page 1 of 2
ANNEXURE

NO. CONSTRUCTION TYPE OF GATE TYPE OF MOUNTING MODEL NUMBER

1 Cast Iron Flat / Flange Back Frame Sluice Gate Thimble Mounted C-FSG-TM

2 Cast Iron Flat / Flange Back Frame Sluice Gate Face Wall Mounted C-FSG-WM

3 Cast Iron Spigot Back Frame Sluice Gate Face Wall Mounted C-SSG-WM

4 Cast Iron Open Channel Sluice Gate Channel Mounted C-OCG-CM

5 Cast Iron Downward Opening Weir Gate Face Wall Mounted C-DWG-WM

6 Cast Iron Downward Opening Weir Gate Thimble Mounted C-DWG-TM

7 Cast Iron Flap Gate / Valve Thimble Mounted C-FG-TM

8 Cast Iron Flap Gate / Valve Face Wall Mounted C-FG-WM

9 Co-Plastic Flat Back Frame Slide Face Wall Mounted CP-FSG-WM

10 Co-Plastic Open Channel Sluice Gate Channel Mounted CP-OCG-CM

11 Co-Plastic Open Channel Sluice Gate Face Wall Mounted CP-OCG-WM

12 Co-Plastic Downward Opening Weir Gate Face Wall Mounted CP-DWG-WM

13 Fabricated Flat / Flange Back Frame Slide Gate Face Wall Mounted F-FSG-WM

14 Fabricated Open Channel Sluice Gate Channel Mounted F-OCG-CM

15 Fabricated Open Channel Sluice Gate Face Wall Mounted F-OCG-WM

16 Fabricated Downward Opening Weir Gate Face Wall Mounted F-DWG-WM

17 Fabricated Stop Logs Channel Mounted F-SL-CM

19 Fabricated Stop Logs Face Wall Mounted F-SL-WM

19 Co-Plastic Stop Logs Channel Mounted CP-SL-CM

20 Co-Plastic Stop Logs Face Wall Mounted CP-SL-WM

Page 2 of 2
16-Copy of Valid Certificate/Approval of
the firm (manufacturer/Supplier) from
concerned government department
REFERENCE
LIST
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN

QATAR

GATE SIZE QTY. TYPE DETAIL’S OF CONTRACTOR & PROJECT YEAR


600 x 600 2 Manually Operated Dutco Tennant LLC, Dubai 2004
S.S Sluice Gate
Project: Al Udeid Water Reservoir, Ministry of Defence,
Qatar Armed Forces, Doha, QATAR.
Consultants: Qatari Engineer & Associates, Doha,
QATAR

1000 x 1350 2 Manually Operated Rentech Environment Protection Technology LLC, 2004
Al. Open Channel gate Dubai-UAE.
300 x 300 4 Al. handstop
Project: 20 Mld UASB STP at Ras Al Khaimah , UAE.
Consultants: EarthCAD Inc.

1000 x 300 2 Manually Operated Cast Star Steel International LLC, Dubai 2008
750 x 750 2 Iron Sluice Gate
750 x 750 2 Project: Rebar Mill, Dubai.
650 x 650 2 Consultants: MECON
600 x 600 4
300 x 300 4

2000 x 2650 2 Aluminium Stop logs, Degremont 2008


2000 x 2530 5
2000 x 2650 5 Project: Palm water for Jumeirah Golf Srates Sewage
1300 x 2450 6 Treatment Plant, DUBAI
1800 x 3600 5 Consultants: KEO International Consultant
2000 x 2580 8
2000 x 1740 16
1800 x 2750 8
2000 x 5600 16
2000 x 4270 3
4000 x 8830 2
2000 x 3800 1
2000 x 300 4

DN 350 2 CI Flap Gate Dutco Tennant LLC, Dubai 2008

1000 x 1000 2 Manually operated Cast Global Engineering Systems FZ, Sharjah, UAE 2009
Iron Open Channel gates

1000 x 1350 4 Manually operates Lutz-Jesco Middle East FZE, Sharjah, U. A. E. 2009
Aluminium open channel
gates

700 x 700 2 Manually operated Cast Global Engineering Systems FZC, Sharjah, UAE 2009
600 x 600 1 Iron Penstocks
Project: 7097, Falcon City, Dubai

Page 1 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
1000 x 1000 2 Manually operated Cast Global Engineering Systems FZ, Sharjah, UAE 2009
Iron Open Channel gates

600 x 700 2 Cast Iron Sluice Gate Al Raida Engineering & Industrial Services WLL / 2011
800 x 800 4 QATAR PETROLEUM, QATAR
1000 x 1000 1
150 x 250 1 Project: EPIC FOR WET UTILITIES DISTRIBUTION
300 x 450 1 NETWORK FOR SUPPORT SERVICE AREA PHASE I
300 x 450 1 & II AND MAINS NETWORK FOR ONGOING
300 x 450 1 DEVELOPMENT AT WEST END EXTENSION, RAS
400 x 600 1 LAFFAN (GT09111200)
400 x 600 1 Consultants: Penspen International Ltd
300 x 450 1
150 x 250 1
200 x 300 1
200 x 300 1
200 x 300 1
300 x 450 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
250 x 350 1
200 x 300 1
250 x 350 1
200 x 300 1
200 x 300 1
200 x 300 1
200 x 300 1
300 x 450 1
300 x 450 1
300 x 450 1
1500 x 1200 1 FRP Open Channel Gate Davidsons Oilfield & Industrial Supplies-F.Z.E., UAE 2011

250 x 250 1 SS Sluice Gate Al Jassar LLC 2012


500 x 500 2
600 x 600 1 Project: Pump Station Waq-6
300 x 300 1 SS Sluice Gate CELAR Water Equipment Company LLC, UAE 2012

1000 x 1000 4 CI Sluice Gate GEA Polacel Cooling Towers FZCO, UAE 2013

1000 x 1000 3 CI Sluice Gate GEA Polacel Cooling Towers FZCO, DUBAI 2014
2000 x 4000 3 Wire mesh Coarse Screen
2000 x 2000 3 Coarse Bar Screen Project: Email Based
DN 150 2 CI Knife Gat Valve Fouress Equipment Trading LLC, Dubai 2014
Manual
DN 200 2 CI Knife Gate Valve Project:
electric

Page 2 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
7100 x 400 12 Super Duplex Stainless PLS, France 2015
Steel Weir gates
1000 x 1000 2 Project: Mirfa IWPP B-000660
Contractor: Degremont SA, France
Consultant: Hyundai Engineering & Construction Co.
Ltd.
520 x 520 3 CI Open channel gate INL General Trading LLC, Sharjah, UAE 2015
420 x 520 1
Project: Port of Fujairah
Consultants: ALT Engineering Consultants FZE, UAE
400x400 2 FRP Sluice Gate METITO OVERSEAS LIMITED, UAE 2015
Project: Zubair Oil Field Development
300x300 2 SS Sluice Gate TAYBAH STEEL PROJECT & CONSULTANCY JLT, 2015
UAE
Project: Steel Melt Shop, UAE
500x500 2 FRP Sluice Gate METITO OVERSEAS LIMITED, UAE 2015
Project: Umm Al Wu'al Phosphate Project, UAE
Dia. 500 2 Stainless Steel Penstocks METITO OVERSEAS LTD., UAE 2017
600X600 2 Stainless Steel Open Project: Sumial Industrial Estate
500X500 2 Channel Gate
1000X1000 1
300X300 2 Stainless Steel Penstocks L&T Metallurgical and Material Handling, UAE Project: 2017
240,000 TPA LSAW PIPE MILL PROJECT KIZAD ABU
DHABI
400X400 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2017
1000X1000 2 Project: Construction of deep trunk sewer Ashghal Chamber
1200X1200 1 across to HIA SWTP
1000X1000 5 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2017
Project: Pumping Station PS 34
1000 X 1000 2 Stainless Steel Penstocks Al Raida Engineering & Industrial Services W.L.L., Qatar 2017
1000 X 1000 2 Stainless Steel Penstocks Project: Al Dhakira Sewage Treatment Works, Qatar
1200 X 1600 2 Stainless Steel Penstocks
1150 X 2000 1 Stainless Steel Penstocks
1200 X 1300 6 Stainless Steel Open Channel.
Penstock Stainless Steel Open
800 X 1500 6 Channel. Penstock Stainless
Steel Stop Log Frame
1000 X 3058 2 Stainless Steel Log Segments
Carbon Steel Lifting Beam
1000 X 2400 1
Stainless Steel Open Channel.
1000 X 3058 1 Penstock

900 X1300 2 Stainless Steel Penstocks

Stainless Steel Stop Log


800 X 1500 2 Frame
Stainless Steel Log Segments
1000 X 3058 1 Carbon Steel Lifting Beam

1000 X 2400 1 Stainless Steel Open Channel.


Penstock
1000 X 3058 1

Page 3 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
Stainless Steel Stop Log
900 X1300 2 Frame

FRP Log Segments Carbon


1200 X 4899 1 Steel Lifting Beam
Stainless Steel Stop Log
Frame
1200 X 1500 1 Stainless Steel Log Segments
Carbon Steel Lifting Beam
1200 X 1500 1
1 Stainless Steel Open Channel.
2000 X 1755 1 Penstock Stainless Steel
Penstocks Stainless Steel
2000 X 900 1 Weir Penstocks
Stainless Steel Penstocks
2000 X 900 1 Stainless Steel Penstocks
Stainless Steel Penstocks
1400 X 700 2 Stainless Steel Penstocks
Stainless Steel Open Channel
1200 X 1200 4 Penstocks
1500 X 1300 4 Stainless Steel Open Channel.
Penstock Stainless Steel
1000 X 1000 8 Penstocks Stainless Steel
1500 X 1500 2 Weir Penstocks
450 X 450 12
1500 X 1500 5 Stainless Steel Penstocks
1195 X 1345 4 Stainless Steel Penstocks
Stainless Steel Penstocks
1000 X 1000 2 Stainless Steel Penstocks
1000 X 1000 1 Stainless Steel Open Channel
1000 X 1000 2 Penstocks
400 X 400 2 Stainless Steel Penstocks
1500 X 1500 2 Stainless Steel Penstocks
Dia. 800 2 Stainless Steel Penstocks
1000 X 1000 1 Stainless Steel Penstocks
700 X 700 2 Stainless Steel Penstocks
700 X 700 2 Stainless Steel Penstocks
1000 X 1000 2 Stainless Steel Penstocks
1000 X 1000 2 Stainless Steel Penstocks
1000 X 1000 2 Stainless Steel Penstocks
1000 X 1000 1 Stainless Steel Penstocks
800 X 800 1 Stainless Steel Penstocks
Stainless Steel Penstocks
Stainless Steel Penstocks
Stainless Steel Penstocks
400X400 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services W.L.L., Qatar 2017
300X300 6 Project: IA 14/15 CO53ST, West Al Meshaf Pkg.3
300X300 2
400X400 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services W.L.L. 2017
500X500 1 Project: CP654NEW PS 16N
800X800 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018*
800X800 1 Project: West Al Meshaf (Package-1)

Page 4 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
1200X1200 2 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 201
Project: Pumping Station PS 34 T
400X400 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
800X800 1 Stainless Steel Penstocks Project: OBK Storm Water PS, Qatar
500X1000 2 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
Projects: QEZ-1-RAS BUFONTAS, WORKERS
ACCOMODATION-PARCEL B, Qatar
450X450 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
Project: C806 C 2017/76, Mesaimeer Graveyard, Qatar
2068X4474 2 Stainless Steel Frame for Severn Glocon FZE, UAE 2018
2068X5071 2 Stop Logs Project: Jebel Ali STP.
2068X4380 2

800 X 800 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
800 X 800 1 Project: AL WAKRAH LOGISTICS PARK PHASE-1
1100 X 1100 1 (WLP-A), Qatar
1100 X 1100 1
500 X 500 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
Project: IA 12/13/C058 ST, ATTENUATION TANK
WORKS, Qatar
500 X 500 1 Stainless Steel Penstocks Al Raida Engineering & Industrial Services WLL, Qatar 2018
500 X 500 1 Project: DOHA PORT REDEVELOPMENT PROJECT,
400 X 400 1 Qatar
500 X 500 1
20684704 2 Stainless Steel Stop Logs Severn Glocon FZE, UAE 2018
2068X4032 2 Stainless Steel Stop Logs Project: Jebel Ali STP,
2068X1550 1 Stainless Steel Lifting Beam
2068X4704 2 Stainless Steel Storage
2068X4032 2 Racks
Stainless Steel Storage
Racks

800 X 800 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
Project: AL RAYYAN STADIUM SC2022 SUPPORT
WORKS, Qatar
400 X 400 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2018
700 X 700 1 Project: Project No.: 1325-17 -Affordable Housing
Accomodation, Qatar
800 X2400 1 Stainless Steel Frame for Al Raida Engineering & Industrial Services WLL, Qatar 2018
Stop Logs Project: Al Dhakira Sewage Treatment Works
800X2000 1 Composite Stoplogs
800x2000 1 Carbon Steel Lifting Beam

600X1000 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Stainless Steel Sluice Gates Project: AL KHOR EXPRESSWAY, QATAR
1000X1000 1
1000X1000 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project: AL KHOR EXPRESSWAY, QATAR
Dia.700 1 Cast Iron Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project: Pre-Contract Services Infrastructure & Highway
Dia. 600 1

Page 5 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
Dia. 600 1 For Qetaifan Island, Qatar
Dia. 400 1
Dia. 700 1
Dia. 600 1
Dia. 600 1
Dia. 600 1
Dia. 600 1
Dia. 600 1
Dia. 600 1
Dia. 600 1
Dia. 400 1
200X200 1 Stainless Steel Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project: Shield 5 Program - Site 1/4A, Qatar
200X200 1
200X200 1
450X450 1 SS Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
Project : Mesaimeer Graveyard, Qatar
1400X1400 1 SS Sluice Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019*
SS Sluice Gates Project : (QS049-P03) - AL MESHAF-PKG3, Qatar
1100X1100 2
800X800 3 SS Sluice Gates Al Raida Engineering & Industrial Services WLL. Qatar 2019
Project : EZ03-CW05-CON-16-UM AL HOUL PKG 3.3,
800X800 1 SS Sluice Gates Qatar
800X800 2 SS Sluice Gates
800X800 3 SS Sluice Gates
800X800 2 SS Sluice Gates
800X800 1 SS Sluice Gates
800X800 1 SS Sluice Gates
1200X1200 1 SS Sluice Gates SS Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2019
Gates Project : CP02 & CP03 at Um Alhoul Economic Zone -
600X600 2 QEZ3, Qatar
4000X4290 1 Stainless Steel Roller Gates Al Raida Engineering & Industrial Services WLL, Qatar 2019
2400X4632 2 Stainless Steel Roller Gates Project : Doha South Terminal Pumping Station Pumping
Stainless Steel Roller Gates Station and Regional Odor Control Works C834, Qatar
2400X4851 2 Stainless Steel Slide Gates
1600X1600 2 Stainless Steel Frame for
2400X6000 2 Stop Logs Stainless Steel
Stop Logs
Stainless Steel Frame for
2400X4000 2 Stop Logs
2400X7000 2 Stainless Steel Stop Logs
2400X5000 2 Stainless Steel Frame for Al Raida Engineering & Industrial Services WLL, Qatar 2019
Stop Logs Stainless Steel Project : Doha South Terminal Pumping Station Pumping
2400X12000 1 Station and Regional Odor Control Works C834, Qatar
Stop Logs
2400X9200 1
Lifting Beam for Stop Logs
2400X4000 1
400X400 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2020
Project : 10 AL SADD HEALTH CENTER BA 2017 C

Page 6 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
010 G,
Qatar
250X250 2 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2020
Project : Design and Construction of Al Bustan Street
250X250 4 SS 316 Penstock Actuator North (P007 C7 P2), Qatar
1 Spare
900X900 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2020
Project: Roads and Infrastructure in Semaisma – P
1200X1200 2 SS 316 Penstock
1000X1000 3 SS 316 Penstock
300X300 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2020
Project: Qatar Entertainment City – Primary Infrastructure,
500X500 1 SS 316 Penstock Package – 2
600X600 1 SS 316 Penstock
700X700 1 SS 316 Penstock
800X800 1 SS 316 Penstock
500X500 1 SS 316 Penstock
500X500 1 SS 316 Penstock
500X500 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2020
Project: D-Ring Road Improvement Works (Project ID:
900X900 1 SS 316 Penstock PA 2019 C 109 G)
250X250 1 SS 316 Sluice Gate Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: FALCON 3 FACILITIES AND
INFRASTRUCTURE - PHASE 2)
300X300 3 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: NPP/0050-QENFB Infrastructure and Utility
1250X1400 2 SS 316 Penstock Buildings
350X350 1 Stainless-Steel Sluice Gate Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: PA 2019 C 097 G & AL KHOR EXPRESSWAY
450X450 1 Stainless-Steel Sluice Gate LINK ROAD 6 EMIRI GUARDS CAMP IN LUSAIL

400X400 1 SS 316 Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: CONSTRUCTION OF SITE 21 - AL WAKRAH
BUS DEPOT, AL WAKRAH
2000X2000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: (PWA/GTC/15/2019) DUHAIL SOUTH &
LEKHBA (ZONE 30 & 31) PKG 1

1000X1000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: AA/DOM/13-14/M/1591-4.07 /G - SR-124 -
1300X1300 1 AZIZIYA UNDERGROUND STORAGE TANK
Stainless-Steel 316 Sluice
gate

300X300 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: ENERGY CENTRE AND CAR PARK

600X600 2 SS 316 Sluice Gate Al Raida Engineering & Industrial Services WLL, Qatar 2021
Project: FIFA Readiness Project, Qatar
600 x 600 3 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: DOHA SOUTH STW PHASE 4 EXTENSION
800 x 800 7

Page 7 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
1100 x 800 4

1000 x 1000 1 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: Al Leabaib
1200 x 1200 1
1500 x 1500 1
800 x 900 3 Stainless-Steel 316 Sluice Al Raida Engineering & Industrial Services WLL, Qatar 2021
gate Project: BARWA STPS
300 x 300 2
600 x 600 1
1100 x 1100 2
1000 x 1000 2
400 x 400 2
900 x 900 2
1600 x 1600 2
1000 x 1695 1 Frame stainless steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
1000 x 1695 3 Stoplog stainless steel 316 Project: D-Ring Road Improvement Works (Project ID:
stop Log PA 2019 C 109 G)

1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: PA 2019 C 066 G - UMM SLAL MOHAMMED
PHASE 02 PACKAGE 1
300 x 300 2 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: Construction of Site 22 - Bus Depot in Al
Industrial Area & Construction of Site 23 - Bus Depot in
Al Rayyan
300 x 300 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2021
Penstock Project: UM ALHOUL (QEZ3) ECONOMIC ZONE
600 x 600 1
Stainless Steel 316
Penstock
1500 x 1000 4 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022
Penstock Project: NFE0SA104 - NORTH FIELD EAST PROJECT,
550 x 550 1 QATAR
450 x 450 1 Stainless Steel 316
Penstock
350 x 350 1
Stainless Steel 316
Penstock
Stainless Steel 316
Penstock

450 X 450 6 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: EPIC for Ground Water Drainage system in
400 X 400 2 Mesaieed ( Phase 1) Qatar Petroleum
400 X 800 4 Stainless Steel 316
Penstock
680 X 680 2
Stainless Steel 316
350 X 350 2 Penstock
Stainless Steel 316
Penstock

Page 8 of 9
JASH ENGINEERING LIMITED
31, Sector ‘C’, Industrial Area, Sanwer Road, INDORE 452 015 (M.P.) INDIA
Tel: 91-731-2720034 / 2720143 / 2721143 / 2722566 Fax: 91-731-2720499
E-mail: info@jashindia.com Website: http://www.jashindia.com

DETAILS OF EXPORT ORDERS EXECUTED UNDER INTERNATIONAL / INDIAN CONTRACTORS


IN
Stainless Steel 316
Penstock

600 X 600 2 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022
Penstock Project: SEWAGE PUMPING STATION PS 25/9A (N)
IN KATARA - C818,-PROJECT ID: PA2020 C 0651

1500 X 1500 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: AL KHARATIYAT & IZGAWA PHASE 1,
PACKAGE 01

1000 X 1000 3 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: FLOOD PREVENTION SCHEME FOR DOHA
SOUTH AREA FPS PHASE 3- CSS0/2

1000 X 1000 3 HDPE Penstock Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Project: Golden Gate Terminal

200 x 200 3 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: GEWAN ISLAND PACKAGE 2:
400 x 400 2 INFRASTRUCTURE WORKS
Stainless Steel 316
Penstock

1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 034 FPS - FIFA READINESS
1000 x 1000 1 PROJECT FRP-07 AL ONIAZA AND MARKHIYA
Stainless Steel 316
Penstock

400 x 400 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 097 G & Al Khor Expressway Link
Road 6 Emiri Guards camp in Lusail

1800 x 1800 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: PA 2019 C 097 G & Al Khor Expressway Link
Road 6 Emiri Guards camp in Lusail

200X200 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: MVL-TRANS REGIONAL LOGISTICS
COMPLEX AL UDEID AIR BASE (TRLC)

3000X3000 1 Stainless Steel 316 Al Raida Engineering & Industrial Services WLL, Qatar 2022*
Penstock Project: Central Doha Beautification Project, Qatar

Page 9 of 9
17-List of Projects (completed and
ongoing) / copy of approval
PREVIOUS
APPROVAL
IN QATAR
18-Copy of previous ASHGHAL approval
GA
DRAWINGS
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

COMPRESSION
12

3~5 SEAL
PRIMARY
CONCRETE

REQUIRED HEADROOM CLEARANCE 2.8 M


1
14 SECONDRY 07 09
GROUT

04
DETAIL 1

450

222
PRIMARY
3~5 SEAL CONCRETE
COMPRESSION

=560 C/C= 06 10 SECONDRY


1376 PLATFORM GROUT
EL. 29.0 M
02

225

450
F F MAX. MAX.
WATER EL. WATER EL. 13

225
200

260 05

30575 HEIGHT OF TRACK PLATE SECTION C-C DETAIL 2


SIDE SEALING
60
122
260
11
SECTION F-F
45°
08
SECONDRY
GROUT
2
32575 TOTAL FRAME HEIGHT

100

200
PRIMARY
32575

CONCRETE

354

450
ISOMETRIC VIEW
SECTION E-E
SECTION D-D TOP SEALING
BOTTOM SEALING
=560 C/C= DIRECTION DIRECTION
OF FLOW OF FLOW
2000 HEIGHT GUIDE FRAME

E 14 LIFTING BEAM
03 1376 WIDTH OF LOG
STAINLESS STEEL BS EN 10088-2 GRADE
13 TOP SEAL RETAINER 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
1000 WIDTH OF OPENING
1000 HEIGHT OF STOP LOG OPENING

C C CERTIFIED
E 12 SIDE SEAL RETAINER
B B
1125 HEIGHT OF LOG

BOTTOM SEAL
11 RETAINER
10 TOP RUBBER SEAL
01
9 SIDE RUBBER SEAL EPDM ASTM D2000
BOTTOM RUBBER
8 SEAL
D 7 SIDE SEAL BEARING HDPE
BLOCK
INVERT EL.
SHUTTER SIDE
-3.575 M 6 GUIDE
1384 FRAME INSIDE TO INSIDE
5 TOP SEAL PAD
SECTION B-B TABLE 'A' STAINLESS STEEL BS EN 10088-2 GRADE
4 SIDE SEAL PAD 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
D A 254 SR. NO. DESCRIPTION QTY. CERTIFIED
3 STOP LOG SHUTTER
1000 WIDTH OF STOP LOG OPENING 450 STOP LOG FRAME
01 02 Nos.
1000(W) X 32575 (H) 2 GUIDE ANGLE
1410 WIDTH OF FRAME
STOP LOG SHUTTER 02 SET
SECTION A-A 02 1000(W) X1000(H) (01 No/SET)
1 STOP LOG FRAME
FRONT VIEW
03 LIFTING BEAM 01 No. Sr. NO. DESCRIPTION MATERIAL
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
DESIGN DATA TABLE:
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. ALLOWABLE DEVIATION FOR DIMENSIONS WITHOUT SPECIFIED TOLERANCES TO BE AS PER ISO : 2768. DOHA NORTH STW PAKAGE 3
1. DESIGN HEAD 32.3 M. TAG No. & SL-0111/ SCREEN CHAMBER-1 INLET STOP LOG
2. ALL FASTENERS (NUT, BOLTS AND WASHERS) FOR STOP LOG ASSEMBLY, FASTENERS FOR RUBBER
FRON INVERT LOCATION : SL-0211/ SCREEN CHAMBER-2 INLET STOP LOG
SEAL & FRAME ASSEMBLY STAINLESS STEEL TYPE 316 . QTY. SEE TABLE 'A'
3. PAINT FOR LOG, FRAME AND LIFTING BEAM ASSLY.- 2. OPENING WIDTH 1000 PROJECTION
ALL STAINLESS STEEL FABRICATED PARTS TO BE ACID WASH PASSIVATED.
J A S H
4. WEIGHT OF EACH STOP LOG SHUTTER 300 Kg. APPX.
3. OPENING HEIGHT 1000
5. SEALING ARRANGEMENT PROVIDED ON FOUR SIDES i.e. TWO VERTICAL SIDES, ONE TOP SIDE & ONE BOTTOM FACE. JASH ENGINEERING LTD.
INDORE (M.P.)
4. IL TO PL 32575 SCALE - NTS DATE 14.10.2022
GENERAL ARRANGEMENT DETAILS
OPERATING LIFTING
FOR INSTALLATION OF SIDE WALL APPD. BY VV
5.
ARRANGEMENT BEAM
EMBEDDED STOP LOG SIZE 1000 (W)x CHKD. BY VS
1000 (H) TO COVER CLEAR OPENING DRWN. BY VA
DESIGN REV. CHD. DATE OF 1000 (W) x 1000 (H) AND FRAME TO
6. IS:5620 REV. DESCRIPTION DRG. NO. REV.
STANDARD BY BY
SUIT 1000 (W) x 32575(H).
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION. REVISIONS GA-A-JAE-QA-00054007 R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

1520

225

450
225

425
260 1000 260

TOP VIEW
32575

450
260 1000 WIDTH OF OPENING 260
H
H
1000 HEIGHT OF OPENING

SECTION H-H
100

100

1000 WIDTH OF CIVIL OPENING 450

1520
ISOMETRIC VIEW

CIVIL BLOCKOUT SIDE VIEW

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. FOR GENERAL ARRANGEMENT PLEASE REFER DRAWING No. GA-A-JAE-QA-00054007. DOHA NORTH STW PAKAGE 3
TAG No. & SL-0111/ SCREEN CHAMBER-1 INLET STOP LOG
LOCATION : SL-0211/ SCREEN CHAMBER-2 INLET STOP LOG
QTY. SEE TABLE 'A'

PROJECTION
J A S H

JASH ENGINEERING LTD.


INDORE (M.P.)
SCALE - NTS DATE 14.10.2022
CIVIL BLOCK OUT DETAILS FOR
INSTALLATION OF SIDE WALL APPD. BY VV
EMBEDDED STOP LOG SIZE - 1000 CHKD. BY VS
(W)x 1000 (H). DRWN. BY VA
DRG. NO. REV.

THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION.
GA-A-JAE-QA-00054007A R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

05

04

01

03

02 ISOMETRIC VIEW

= 560 C/C =
140
1376

FRONT VIEW SIDE VIEW

05 LIFTING CABLE STEEL CORE

STAINLESS STEEL BS EN 10088-


04 AXLE FOR HOOK JACKET 2 GRADE 1.4404 (SS TYPE 316L)

03 LIFTING GUIDE STAINLESS STEEL BS EN


TOP VIEW 10088-2 GRADE
02 HOOK JACKET 1.4401/1.4404 (S.S. TYPE 316
/ 316L) DUAL
01 MAIN STRUCTURE CERTIFIED
Sr. NO. DESCRIPTION MATERIAL
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. ALLOWABLE DEVIATION FOR DIMENSIONS WITHOUT SPECIFIED TOLERANCES TO BE AS PER ISO : 2768. DOHA NORTH STW PAKAGE 3
2. ALL FASTENERS (NUT, BOLTS AND WASHERS) FOR LIFTING BEAM ASSEMBLY TO BE OF STAINLESS STEEL 304 . TAG No. & SL-0111/ SCREEN CHAMBER-1 INLET STOP LOG
LOCATION : SL-0211/ SCREEN CHAMBER-2 INLET STOP LOG
3. PAINT FOR LIFTING BEAM.- QTY. 01 No.
i) ALL STAINLESS STEEL FABRICATED PARTS TO BE ACID WASH PASSIVATED.
PROJECTION
J A S H

JASH ENGINEERING LTD.


INDORE (M.P.)
SCALE - NTS DATE 14.10.2022
GENERAL ARRANGEMENT
DETAILS OF LIFTING BEAM FOR APPD. BY VV

LOG SIZE - 1000 (W) x 1000 (H). CHKD. BY VS


DRWN. BY V.A.
REV. CHD. DATE DRG. NO.
REV. DESCRIPTION REV.
BY BY
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION. REVISIONS GA-A-JAE-QA-00054007B R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

COMPRESSION
A 12

3~5 SEAL
PRIMARY

REQUIRED HEADROOM CLEARANCE 2.8 M


CONCRETE

1
14
SECONDRY 07 09
GROUT

04
DETAIL 1

450

222
PRIMARY
3~5 SEAL CONCRETE
COMPRESSION

=560 C/C= 06 10 SECONDRY


1376 PLATFORM GROUT
EL. 29.0 M
02

225

450
F F 13
MAX. MAX.

225
200
WATER EL. WATER EL.
260 05

30825 HEIGHT OF TRACK PLATE SECTION C-C DETAIL 2


SIDE SEALING
60
122
260
11
SECTION F-F
45°
08
SECONDRY
GROUT
2
32825 TOTAL FRAME HEIGHT

100

200
PRIMARY
32825

CONCRETE

354

450
ISOMETRIC VIEW
SECTION E-E
SECTION D-D TOP SEALING
BOTTOM SEALING
=560 C/C= DIRECTION DIRECTION
OF FLOW OF FLOW
2000 HEIGHT GUIDE FRAME

14 LIFTING BEAM
E
1376 WIDTH OF LOG
03 STAINLESS STEEL BS EN 10088-2 GRADE
13 TOP SEAL RETAINER 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
1000 WIDTH OF OPENING
CERTIFIED
1000 HEIGHT OF STOP LOG OPENING

C C 12 SIDE SEAL RETAINER


E
B B BOTTOM SEAL
1125 HEIGHT OF LOG

11 RETAINER
10 TOP RUBBER SEAL

01 9 SIDE RUBBER SEAL EPDM ASTM D2000


BOTTOM RUBBER
8 SEAL
SIDE SEAL BEARING
D 7 BLOCK HDPE

INVERT EL. SHUTTER SIDE


6
-3.825 M GUIDE
1384 FRAME INSIDE TO INSIDE
5 TOP SEAL PAD

A SECTION B-B TABLE 'A' STAINLESS STEEL BS EN 10088-2 GRADE


4 SIDE SEAL PAD 1.4401/1.4404 (S.S. TYPE 316 / 316L) DUAL
CERTIFIED
D 254 SR. NO. DESCRIPTION QTY.
3 STOP LOG SHUTTER
STOP LOG FRAME
1000 WIDTH OF STOP LOG OPENING 450 01 02 Nos.
1000(W) X 32825 (H) 2 GUIDE ANGLE
1410 WIDTH OF FRAME STOP LOG SHUTTER 02 SET
SECTION A-A 02 1000(W) X1000(H) (01 No/SET)
1 STOP LOG FRAME
FRONT VIEW
03 LIFTING BEAM 01 No. Sr. NO. DESCRIPTION MATERIAL
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
DESIGN DATA TABLE:
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. ALLOWABLE DEVIATION FOR DIMENSIONS WITHOUT SPECIFIED TOLERANCES TO BE AS PER ISO : 2768. DOHA NORTH STW PAKAGE 3
1. DESIGN HEAD 32.3 M. TAG No. & SL-0112/ SCREEN CHAMBER-1 OUTLET STOP LOG
2. ALL FASTENERS (NUT, BOLTS AND WASHERS) FOR STOP LOG ASSEMBLY, FASTENERS FOR RUBBER
FRON INVERT LOCATION : SL-0212/ SCREEN CHAMBER-2 OUTLET STOP LOG
SEAL & FRAME ASSEMBLY STAINLESS STEEL TYPE 316 . QTY. SEE TABLE 'A'
3. PAINT FOR LOG, FRAME AND LIFTING BEAM ASSLY.- 2. OPENING WIDTH 1000 PROJECTION
ALL STAINLESS STEEL FABRICATED PARTS TO BE ACID WASH PASSIVATED.
J A S H
4. WEIGHT OF EACH STOP LOG SHUTTER 300 Kg. APPX.
3. OPENING HEIGHT 1000
5. SEALING ARRANGEMENT PROVIDED ON FOUR SIDES i.e. TWO VERTICAL SIDES, ONE TOP SIDE & ONE BOTTOM FACE. JASH ENGINEERING LTD.
INDORE (M.P.)
4. IL TO PL 32825 SCALE - NTS DATE 17.10.2022
GENERAL ARRANGEMENT DETAILS
OPERATING LIFTING
FOR INSTALLATION OF SIDE WALL APPD. BY VV
5.
ARRANGEMENT BEAM
EMBEDDED STOP LOG SIZE 1000 (W)x CHKD. BY VS
1000 (H) TO COVER CLEAR OPENING DRWN. BY VA
DESIGN REV. CHD. DATE OF 1000 (W) x 1000 (H) AND FRAME TO
6. IS:5620 REV. DESCRIPTION DRG. NO. REV.
STANDARD BY BY
SUIT 1000 (W) x 32825(H).
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION. REVISIONS GA-A-JAE-QA-00054008 R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

1520

225

450
225

425
260 1000 260

TOP VIEW
32825

450
H
260 1000 WIDTH OF OPENING 260
H
1000 HEIGHT OF OPENING

SECTION H-H
100

100

1000 WIDTH OF CIVIL OPENING 450

1520
ISOMETRIC VIEW

CIVIL BLOCKOUT SIDE VIEW

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. FOR GENERAL ARRANGEMENT PLEASE REFER DRAWING No. GA-A-JAE-QA-00054008. DOHA NORTH STW PAKAGE 3
TAG No. & SL-0112/ SCREEN CHAMBER-1 OUTLET STOP LOG
LOCATION : SL-0212/ SCREEN CHAMBER-2 OUTLET STOP LOG
QTY. SEE TABLE 'A'

PROJECTION
J A S H

JASH ENGINEERING LTD.


INDORE (M.P.)
SCALE - NTS DATE 17.10.2022
CIVIL BLOCK OUT DETAILS FOR
INSTALLATION OF SIDE WALL APPD. BY VV
EMBEDDED STOP LOG SIZE - 1000 CHKD. BY VS
(W)x 1000 (H). DRWN. BY VA
DRG. NO. REV.

THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION.
GA-A-JAE-QA-00054008A R0
A2
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE. SOS. NO. : JAE-QA-00054

05

04

01

03

02 ISOMETRIC VIEW

= 560 C/C =
140
1376

FRONT VIEW SIDE VIEW

05 LIFTING CABLE STEEL CORE

STAINLESS STEEL BS EN 10088-


04 AXLE FOR HOOK JACKET 2 GRADE 1.4404 (SS TYPE 316L)

03 LIFTING GUIDE STAINLESS STEEL BS EN 10088-


TOP VIEW 2 GRADE
1.4401/1.4404 (S.S. TYPE 316 /
02 HOOK JACKET 316L) DUAL
CERTIFIED
01 MAIN STRUCTURE
Sr. NO. DESCRIPTION MATERIAL
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. CLIENT : AL RAIDA ENGINEERING & INDUSTRIAL SERVICES W.L.L.
PROJECT : CONSTRUCTION OF TERMINAL SEWAGE PUMPING STATION AT
NOTES:- 1. ALLOWABLE DEVIATION FOR DIMENSIONS WITHOUT SPECIFIED TOLERANCES TO BE AS PER ISO : 2768. DOHA NORTH STW PAKAGE 3
2. ALL FASTENERS (NUT, BOLTS AND WASHERS) FOR LIFTING BEAM ASSEMBLY TO BE OF STAINLESS STEEL 304 . TAG No. & SL-0112/ SCREEN CHAMBER-1 OUTLET STOP LOG
LOCATION : SL-0212/ SCREEN CHAMBER-2 OUTLET STOP LOG
3. PAINT FOR LOG, FRAME AND LIFTING BEAM ASSLY.- QTY. 01 No.
ALL STAINLESS STEEL FABRICATED PARTS TO BE ACID WASH PASSIVATED.
PROJECTION
J A S H

JASH ENGINEERING LTD.


INDORE (M.P.)
SCALE - NTS DATE 17.10.2022
GENERAL ARRANGEMENT
DETAILS OF LIFTING BEAM FOR APPD. BY VV

LOG SIZE - 1000 (W) x 1000 (H). CHKD. BY VS


DRWN. BY V.A.
REV. CHD. DATE DRG. NO.
REV. DESCRIPTION REV.
BY BY
THIS DRAWING IS THE PROPERTY OF JASH ENGINEERING LTD., INDORE & SHOULD NOT BE REPRODUCED OR COPIED WITHOUT OWNER'S PERMISSION. REVISIONS GA-A-JAE-QA-00054008B R0
A2