Activity Tracker for MOM ( CDF PROJECT Fit-

out scope and IT scope )


01/02/2024
Activity STATUS DATE key

review the CCTV distribution to confirm blind


CCTV Comkrafts
areas and resubmit.

Show quantities for each system components in


Shop drawing Comkrafts
the drawings' legend.
Wi-Fi and public address horn or speaker to be Saria confirmed for the 1st
Comkraft+ Saria
added in the outdoor area(in shop drawings). fix
Provide separate as-built drawings for each
system in the drawings(WIFI , DATA , ACCESS
As-Built hand over Comkrafts
CONTROL , CCTV , Booking SYSTEM each in
separate layout for example not for counting ).

Specify the placement of the access control panel


Access control Comkrafts
and the number of doors will be controlled.

Fix dimensions for each screen in booking or other


AV Devices systems on walls; print specs (H, W, thickness with Comkrafts
brackets) on each screen's location.

Specify AV specs and cabinet placement for the


Comkrafts
main meeting room or board meeting.

Determine the height for booking system screens


booking system Comkrafts
in the shop drawings.

Data Room

Fire alarm panel To be shifted outside the data room 04-Feb-24 Saria confirmed

Ensure no water pipes exist in the data center


water insulation 5-Feb-24 Saria CONFIRMED
(DC).

Saria confirmed to
coordinate with Comkrafts
Include a 50KVA UPS in the data center layout, to be 1 UPS 50KVA,
UPS Comkrafts+Saria
replaced to the 40KVA in the BOQ. CONKRAFTS To coordinate
with KAFD for the additional
40 kva of the load

Saria will Provide the panel


for the UPS but with cable
UPS panel Plan for an electrical panel in the data center. Comkrafts+Saria
4*10mm the new cable for
50KVA its Comkrafts scope

Heat calculation to be attached for review and


AC Comkrafts
approval.
Activity Tracker for MOM ( CDF PROJECT Fit-
out scope and IT scope )
01/02/2024

Descopping
To descope the Firefighting system for the DC (to
Data center fire This Is included with Saria
be approved ) CDF-Saria-Comkrafts
fighting system scope
To descope the Raised floor for the DC (to be This Is included with Saria
Raised floor CDF-Saria-Comkrafts
approved) scope
To provide us the specs of Access Control/CCTV
IT specs screens in replacement of the workstation 24” CDF-Comkrafts
screens