You are on page 1of 4

please arrange fence material for FS-321 as much as possible, not affecting movement of rig.

pleasDear Sir,

Good morning.

I would like to inform you that, Our HSE Advisor Mr. Bipin need to proceed for emergency leave due
to his father serious sickness. Currently, his presence is highly important.

During his absence our HSE Advisor Mr. Faizal ( previously he worked 4 years with CCED for long term
and acts as a Leave Reliver for Mr. Anil ).

Please approve his emergency leave for 10 days.

e First offal apologies for delay response.

Please find the response as below in yellow colour.

arrange fence material for FS-321, not affecting movement of Rig.

Dear Madam,
Your prompt attention to this matter is highly appreciated.

This is for your kind information that, as you know Mr. Masood Ahmed (Grader Operator)
going to annual vacation. He already left to Muscat from faraha today 7 AM, and the flight
will be on tomorrow. Dear Sir,

As per the list following employees are presently working in the FARAHA. Kindly advise for
the further plan. Today As discussed with you please confirm the actual list so after that we can
terminate hire staff as trialing email. First of all sorry to hear about your father health condition

As per my discussion with our HR,Could you please share any medical reports & up and down tickets
to Ms. Maryam .

You can travel for one week .. Dear sir,


This is my request letter to allow me to go vacation on 04.02.2024 to 18.02.2024 for my
marriage purpose. Please note that from 18.02.2024 to 03.03.2024 is my normal shift vacation. I can
rejoin to the duty on 03.03.2024. Kindly requesting you to allow me to go vacation on the mentioned
date.

Dear P&E Team,

Please note that today in Farha one of our tipper was about to rollover due to sudden failure of
battery. The vehicle went off to the edge of the road but fortunately avoided major
accident(Rollover). The workshop team has rectified the issue temporarily and vehicle has been sent
to Farha camp. Please stop the vehicle immediately until complete rectification has been done to
avoid any future incidents.

Attached pictures for you reference.

Your concerns are genuine and well received. I do agree that managing the site QC works with only 1
QC Engineer is difficult. That’s why we have 2 QC Engineers along with 1 QC inspector and 2 Lab
Technicians until last week when 2 of our QC staff caught up in emergencies.

As you know that Oman Labour Law does not allow a company to stop any employee from leaving
during emergency situations. Unfortunately for us, 2 of our QC staff had emergencies at the same
time so they had to leave immediately. Mr. Venkatesh left first and when Mr. Tanveer wanted to leave,
we tried to delay his leave until Mr. Venkatesh return. But he left the site without informing to anyone
and directly approached our HR with a threatening tone. His mental situation was also distressing. So
our HR department did not want to take any chance and released him immediately.

However, I have shortlisted another candidate who is available to join immediately. I will interview him
today and if found suitable, would propose him for your assessment soon.

Moreover, I would like to recall similar situation which occurred last year when Mr. Sandeep left the
site and Mr. Rohit was left alone to handle the daily QC activities along with 2 Lab Technicians. It was
then, when we decided to deploy an additional QC at site to act as a reliever in emergencies. However,
this is one such situation where we do not have any option.
Hopefully, you would understand the situation and provide your support as I am trying to bring in
another QC staff at the earliest.

Thank you for your understanding and cooperation.

We urgently require the planned date of arrival for the replacement Quality Control Inspector (QCI).
Additionally, we need a comprehensive plan for QC monitoring and control during the specified
period until the shortage of QC manpower in the site is resolved.

It is crucial to note that CCED QCD cannot accept the continued normal progression of work with
only one Quality Control Engineer (QCE) overseeing all Jalmood construction activities in both blocks.
Your swift attention to this matter is highly appreciated.

Dear Sir,

Your comments are well noted.

I will make sure the replacement QCI is arranged at the earliest (preferably within this week itself).
Until then, we will need your support and cooperation to run the project works smoothly.

Dear Sir,

Please be informing you that I am Moving for my Short Vacation from 08/01/2024. In my absence
below will take care of my Responsibilities. You are requested to please contact them for any kind of
assistance require in my absence. Below is the contact details for him:-

(1) Mr. Bilal Ahmad (+968-94390171)(Site Manager)


(2) Mr. Selva Kumar(+968-78476435)(Planning Engineer)

Kindly address all your concerns to my email id as usual.

You all know about my family problems for past 2 years, and now I have to appear in court as part of
the case. If I do not appear personally, this time there is possibility of filing case against my family. So
please consider this email as my emergency leave request and allow me to go home immediately to
solve the issues.

Hopping to get all issues resolved very soon and come back as soon as possible. Attached is order
from the advocate is for your kind reference and further support.

Dear Mr. @sk.singh@jalmoodnational.com,


First of all a very happy new year to whole Jalmood team.

Secondly, we are getting repeated push from AHPS on non-availability of fronts to complete the
approach piping.
The plan was to complete the civil works by end of December 23 and we are being charged with
standby /idling charges of crew from AHPS since then.

We are running a week late and need a confirmation on the completion date.
What is the update for the above mentioned subject? Your prompt constructive deed is necessary
since the said work is urgent.

You might also like