INSTITUTIONAL ASSESSMENT
In
Masonry Technology I
(CET 315)
Date:__________________________
MULTIPLE CHOICE: Read each questions carefully and chose your best answer.
Encircle the letter of your choice.
1. Bars spliced by non-contact lap splices shall not be spaced transversely farther
apart than _______ the required length of lap nor more than 8 inches.
o A. 1/5
o B. 1/8
o C. 1/4
o D. 3/8
3. Control joints provide for movement of a wall in contraction and can have some
solid masonry or grout in the joint.
o A. True
o B. False
4. For low-lift grouting, grout shall not be poured until the mortar has set _____ to
adequately withstand the pressure of the grout.
o A. At least 16 hrs. past final set
o B. A sufficient time
o C. To full strength
Republic of the Philippines
o D. A minimum of 24 hrs
6. When ambient temperature is between 40°F and 32°F, _____ shall be heated to
produce mortar between 40°F and 120°F.
o A. Concrete sand
o B. Drinking water
o C. Mortar sand or mixing water
o D. Mortar sand and mixing water
7. The maximum tie spacing may not exceed 16 longitudinal bar diameters,
__________ tie diameters, or the least column dimensions.
o A. 12
o B. 16
o C. 24
o D. 48
8. In order to obtain a 28 day grout compressive strength of 2,000 psi, the seven
day test, if taken, should be at least _______psi.
o A. 1000
o B. 1200
o C.1500
o D. 2000
o B. Anchored
o C. Coordinated
o D. Separated
11. When the outside air temperature is less than 20°F, ___________ shall be
provided to maintain the air temperature above 32°F.
o A. Mason jackets
o B. Heated mortar boards
o C. Enclosures or auxiliary heat
o D. Enclosures and auxiliary heat
13. Special grout lifts of 12.67 feet maximum are permitted when ________.
o A. Masonry has cured for at least 4 hours
o B. Grout slump is between 10 and 11 inches
o C. There are no intermediate reinforced bond beams
o D. All of the above
o D. 2500
15. Masonry walls that are covered with plastic or canvas should cover the top of the
wall and hang over at least _________ on the face.
o A. 12"
o B. 2'
o C. 3'
o D. 4'
16. The maximum spacing of cleanouts in a solid grouted system shall not exceed
_________ inches.
o A. 8
o B. 24
o C. 32
o D. 48
17. According to ASTM C 476, grout prepared at the jobsite shall be mixed for a
minimum of ___________minutes.
o A. 1
o B. 3
o C. 5
o D. 10
18. The temperature of masonry units shall not be less than _____ when laid in
masonry.
o A. 10°F
o B. 20°F
o C. 30°F
o D. 40°F
19. When applicable, prisms shall be grouted not less than __________, nor more
than ___________ after construction of the prism.
o A. 6 hours /12 hours
Republic of the Philippines
o B. 1 day/ 2 days
o C. 1 day/ 3 days
o D. 2 days/ 3 days
22. If the mean daily air temperature is 20°F, or below, the masonry temperature is
____________.
o A. To be maintained below 20°F
o B. To be maintained at 20°F or above
o C. To be maintained at 32°F
o D. To be maintained above 32°F
24. When installing control joints, the mortar joint should be raked _________ inch
deep.
o A. ½
o B. 1
Republic of the Philippines
o C. 5/8
o D. 3/4
25. The minimum grout space dimension for AAC masonry units shall be _______ or
a 3 inch diameter cell.
o A. 2” x 2”
o B. 2 ½” x 2 ½”
o C. 3” x 3”
o D. 3 ½” x 3 ½”