Professional Documents
Culture Documents
Promote economic growth and social well-being within the community, by also introduceing a wide variety of land uses as
shown below
Objectives
· The planning, design and construction managment for the external and internal bulk electrical
infrastrcture and telecoms for the phase 2 tasez development.
· Develop connection from the Waltoo 132Kv supply substation and transform into 11KV at
consumer distribution then to mini substations for factory sites and residentional areas.
· Provision of services related to all financial matters including aspects such ad quantity
calculation, cost estimates, cost control and procurement process.
· Ensure all designs will be aligned with latest approved SDP at time of appointment, so as to co-
ordinatw with all relevant stakeholders and to ensirure all final designs meet the required
stanards to cater for the phase 2 of the project.
· Liasing with City of Tshwane (COT) and Eskom during project lifecycle and scope of work.
Project timeline