CUSTOMER : M/S RASHTRIYA ISPAT NIGAM LIMITED VSP DOC. NAME MASTER DOCUMENT LIST
CONSULTANT : - MECON LIMITED DOC. NO. VSP/GAJA-AQUA/123K/X/80/S2/SE13/701
CONTRACTOR : GAJA ENGINEERING PRIVATE LTD., DOC. REV. NO: 2
PROJECT : EFFLUENT TREATMENT PLANT AUGMENTATION DATE 16.03.2020
Target Date for
SNo. Description GAJA Drawing / Document Number Submission Category Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev.05
Submission
DT. OF SUBMISSION / COMMENTS / STATUS
I GENERAL DOCUMENT
18.02.2019 26.03.2019 17.04.2019 26.10.2019
26.02.2019 30.03.2019 11.11.2019
1 MASTER DOCUMENT LIST VSP/GAJA-AQUA/123K/X/80/S2/SE13/701 11.03.2019 Approval
All commnt not Approved with
Commented App.AsNoted
incorporated minor comments
II PROCESS DOCUMENT/ DRAWING LIST
BASIC ENGINEERING PACKAGE VSP/GAJA-AQUA/123K/X/80/S2/SE13/702 12.03.2019 25.04.2019 15.06.2019 26.06.2019
1 13.03.2019 Approval 19.03.2019 13.05.2019 17.06.2019 26.06.2019
Commented Commented Commented Approved
27.03.2019 (Cooling
tower, Tar Stg 11.04.2019 04.05.2019
12.03.2019
Tank, Sludge (Cool.Tower) (Cool.Tower)
Thick.)
30.03.2019 17.04.2019 08.05.2019
19.03.2019
(SludeThick.) (Cool.Tower) (Cool.Tower)
Commented App.AsNoted App.AsNoted Approved
02.04.2019 22.04.2019 17.05.2019
(Cool.Tower) (SludeThick.) (SludeThick.)
PIPING & INSTRUMENTATION DIAGRAM- 4 sheets (Cooling tower, Tar Settelling Tank, Discussed in meeting
2 VSP/GAJA-AQUA/123K/X/80/S2/SE13/703 13.03.2019 Approval Approved on
Sludge Thick, Filter press) Commented on 03.05.19 Gaja to
24.05.2019
revise/resubmit
04.05.2019 (Tar Stg.
04.04.2019 (TST) 17.05.2019 (TST)
Tank)
08.05.2019 (Tar Stg. Approved on
Commented
Tank) 24.05.2019
04.09.2019 16.10.2019
22.05.2019 (SDP)
(SDP) (SDP)
27.06.2019 18.09.2019 23.10.2019
Commented App.AsNoted Approved
12.03.2019 25.06.2019 23.09.2019
3 EQUIPMENT LAYOUT VSP/GAJA-AQUA/123K/X/80/S2/SE13/704 13.03.2019 Approval 19.03.2019 02.07.2019 09.10.2019
App.AsNoted App.AsNoted Approved
21.05.2019 01.07.2019
18.09.2019
(SludeThick., TST) (SludeThick.)
4 HYDRAULIC FLOW DIAGRAM VSP/GAJA-AQUA/123K/X/80/S2/SE13/705 30.03.2019 Approval 10.07.2019
AAN 27.09.2019
(SludeThick.)
App.AsNoted Approved
18.05.2019 19.07.2019 07.09.2019
5 PIPING LAYOUT VSP/GAJA-AQUA/123K/X/80/S2/SE13/706 22.04.2019 Approval 23.05.2019 26.07.2019 19.10.2019
Commented Commented App.AsNoted
09.05.2019 23.05.2019 07.06.2019
6 PUMP PRESSURE DROP CALCULATION VSP/GAJA-AQUA/123K/X/80/S2/SE13/707 22.04.2019 Approval 21.05.2019 24.05.2019 07.06.2019
Commented App.AsNoted Approved
13.05.2019 10.07.2019 21.08.2019
7 VALVE SCHEDULE VSP/GAJA-AQUA/123K/X/80/S2/SE13/708 30.03.2019 Approval 23.05.2019 15.07.2019 21.08.2019
Commented App.AsNoted App.AsNoted
20200316-Status+MDL-SE-13 1 Aquadesigns
MASTER DOCUMENT LIST
CUSTOMER : M/S RASHTRIYA ISPAT NIGAM LIMITED VSP DOC. NAME MASTER DOCUMENT LIST
CONSULTANT : - MECON LIMITED DOC. NO. VSP/GAJA-AQUA/123K/X/80/S2/SE13/701
CONTRACTOR : GAJA ENGINEERING PRIVATE LTD., DOC. REV. NO: 2
PROJECT : EFFLUENT TREATMENT PLANT AUGMENTATION DATE 16.03.2020
Target Date for
SNo. Description GAJA Drawing / Document Number Submission Category Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev.05
Submission
06.06.2019 29.06.2019 31.08.2019
9 DATASHEET FOR TAR SETTLING TANK VSP/GAJA-AQUA/123K/X/80/S2/SE13/710 25.03.2019 Approval 15.06.2019 01.07.2019 31.08.2019
Commented App.AsNoted Approved
16.05.2019 24.06.2019 04.07.2019 31.08.2019
10 DATASHEET FOR SLUDGE THICKENER VSP/GAJA-AQUA/123K/X/80/S2/SE13/711 25.03.2019 Approval 22.05.2019 25.06.2019 11.07.2019 31.08.2019
Commented App.AsNoted App.AsNoted Approved
23.04.2019 14.06.2019 04.07.2019 03.09.2019
Informed on
11 DATASHEET FOR FILTER PRESS VSP/GAJA-AQUA/123K/X/80/S2/SE13/712 25.03.2019 Approval 13.05.2019 28.06.2019 to revise 05.07.2019 04.09.2019
as per revised BEP
15 DISTRIBUTION PIPING GENERAL ARRANGEMENT FOR COOLING TOWER VSP/GAJA-AQUA/123K/X/80/S2/SE13/716 30.03.2019 Information
16 HOT EFFLUENT DISTRIBUTION NOZZLE AND DETAILS FOR COOLING TOWER VSP/GAJA-AQUA/123K/X/80/S2/SE13/717 30.03.2019 Information
18 C.S AND LONGITUDINAL SECTION DRAWING OF COOLING TOWER VSP/GAJA-AQUA/123K/X/80/S2/SE13/719 30.03.2019 Approval
18.03.2019
1 CIVIL DESIGN BASIS REPORT VSP/GAJA-AQUA/123K/X/80/S2/SE13/733 22.03.2019 Approval 19.03.2019
Approved
29.04.2019 04.05.2019 06.06.2019
2 CIVIL GA DRAWING FOR COOLING TOWER STRUCTURE ALONG WITH BASIN VSP/GAJA-AQUA/123K/X/80/S2/SE13/734 30.03.2019 Approval 01.05.2019 08.05.2019 06.06.2019
Commented Commented Approved
10.07.2019 20.07.2019 03.08.2019 08.11.2019
3 VSP/GAJA-AQUA/123K/X/80/S2/SE13/735 15.04.2019 Approval 24.07.2019 09.08.2019 16.11.2019
CIVIL GA DRAWING FOR TAR SETTLING TANK FOUNDATION. Commented Commented App.AsNoted Approved
19.03.2019 04.05.2019 04.06.2019
4 VSP/GAJA-AQUA/123K/X/80/S2/SE13/736 29.03.2019 Approval 24.03.2019 04.05.2019 04.06.2019
CIVIL GA DRAWING FOR SLUDGE THICKNER. Commented App.AsNoted Approved
19.03.2019 25.06.2019 10.07.2019 19.07.2019 03.08.2019 08.11.2019
24.03.2019 04.07.2019 15.07.2019 23.07.2019 09.08.2019 16.11.2019
5 VSP/GAJA-AQUA/123K/X/80/S2/SE13/737 26.03.2019 Approval
Comments not
Commented Commented App.AsNoted App.AsNoted Approved
CIVIL GA DRAWING FOR SUMP. incorporated
11.07.2019 05.08.2019 05.09.2019
6 VSP/GAJA-AQUA/123K/X/80/S2/SE13/738 07.04.2019 Approval 23.07.2019 09.08.2019 12.09.2019
CIVIL GA DRAWING FOR FILTER PRESS BUILDING. Commented App.AsNoted Approved
23.04.2019 29.04.2019 07.06.2019
7 CIVIL DESIGN CALCULATION FOR COOLING TOWER STRUCTURE ALONG VSP/GAJA-AQUA/123K/X/80/S2/SE13/739 26.04.2019 Approval 24.04.2019 01.05.2019 07.06.2019
WITH BASIN Commented Commented Approved
10.07.2019 20.07.2019 03.08.2019
24.07.2019 09.08.2019
8 VSP/GAJA-AQUA/123K/X/80/S2/SE13/740 05.05.2019 Approval
Drg.updated by
Commented Approved
CIVIL DESIGN CALCULATION FOR TAR SETTLING TANK FOUNDATION. Gaja
02.05.2019 04.05.2019 07.06.2019
9 VSP/GAJA-AQUA/123K/X/80/S2/SE13/741 26.04.2019 Approval Drawing discused 04.05.2019 07.06.2019
in meeting App.AsNoted Approved
CIVIL DESIGN CALCULATION FOR SLUDGE THICKNER.
25.06.2019 10.07.2019 19.07.2019 03.08.2019
10 VSP/GAJA-AQUA/123K/X/80/S2/SE13/742 30.04.2019 Approval 04.07.2019 15.07.2019 23.07.2019 09.08.2019
CIVIL DESIGN CALCULATION FOR SUMP. Commented Commented App.AsNoted Approved
11.07.2019 05.08.2019 05.09.2019
11 VSP/GAJA-AQUA/123K/X/80/S2/SE13/743 07.05.2019 Approval 23.07.2019 09.08.2019 12.09.2019
CIVIL DESIGN CALCULATION FOR FILTER PRESS BUILDING. Commented Approved Approved
30.09.2019 04.11.2019
12 CIVIL GA DRAWING FOR COOLING WATRE FEED PUMP,FILTER PRESS FEED VSP/GAJA-AQUA/123K/X/80/S2/SE13/744 18.05.2019 Approval 14.10.2019 08.11.2019
PUMP FOUNADTION. Commented Approved
20200316-Status+MDL-SE-13 3 Aquadesigns
MASTER DOCUMENT LIST
CUSTOMER : M/S RASHTRIYA ISPAT NIGAM LIMITED VSP DOC. NAME MASTER DOCUMENT LIST
CONSULTANT : - MECON LIMITED DOC. NO. VSP/GAJA-AQUA/123K/X/80/S2/SE13/701
CONTRACTOR : GAJA ENGINEERING PRIVATE LTD., DOC. REV. NO: 2
PROJECT : EFFLUENT TREATMENT PLANT AUGMENTATION DATE 16.03.2020
Target Date for
SNo. Description GAJA Drawing / Document Number Submission Category Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev.05
Submission
13 NA NA NA
GA OF DRAWING FOR PILE DETAILS.
IV ELECTRICAL DRAWINGS:
20200316-Status+MDL-SE-13 5 Aquadesigns
MASTER DOCUMENT LIST
CUSTOMER : M/S RASHTRIYA ISPAT NIGAM LIMITED VSP DOC. NAME MASTER DOCUMENT LIST
CONSULTANT : - MECON LIMITED DOC. NO. VSP/GAJA-AQUA/123K/X/80/S2/SE13/701
CONTRACTOR : GAJA ENGINEERING PRIVATE LTD., DOC. REV. NO: 2
PROJECT : EFFLUENT TREATMENT PLANT AUGMENTATION DATE 16.03.2020
Target Date for
SNo. Description GAJA Drawing / Document Number Submission Category Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev.05
Submission
Commented Approved Re-Approved
24.05.2019 10.06.2019 04.09.2019
04.06.2019 13.06.2019 04.09.2019
22 LIGHTNING PROTECTION LAYOUT VSP/GAJA-AQUA/123K/X/80/S2/SE13/772 25.04.2019 Information
Commented Commented Retained for Reference
27.08.2019 04.09.2019
23 VENDOR DRAWING:- SLD,GA,BOM & CONTROL SCHEMATIC OF LDB,SLDB etc,, VSP/GAJA-AQUA/123K/X/80/S2/SE13/773 28.05.2019 Approval 31.08.2019 04.09.2019
Commented Approved
16.05.2019 19.07.2019 04.09.2019
24 GA SCHEMATIC DRAWING & BOM OF LCS VSP/GAJA-AQUA/123K/X/80/S2/SE13/774 28.05.2019 Approval 04.06.2019 29.07.2019 04.09.2019
Commented Commented Approved
17.05.2019
24.05.2019
25 DATA SHEET & GA OF POWER & CONTROL JUNCTION BOXES VSP/GAJA-AQUA/123K/X/80/S2/SE13/775 15.05.2019 Information
Retained for
Reference
07.06.2019 02.08.2019 04.09.2019
26 DATA SHEET FOR LIGHTING FIXTURES VSP/GAJA-AQUA/123K/X/80/S2/SE13/776 25.04.2019 Information 13.06.2019 13.08.2019 04.09.2019
Commented Commented Approved
17.05.2019 20.09.2019 11.10.2019
05.06.2019 27.09.2019 11.10.2019
27 DATA SHEET FOR CABLE TRAYS VSP/GAJA-AQUA/123K/X/80/S2/SE13/777 28.03.2019 Information
Retained for
Commented Retained for Reference
Reference
20.05.2019 28.09.2019 04.10.2019
03.06.2019 01.10.2019 10.10.2019
28 DATA SHEET FOR SAFETY ITEMS INCLUDES MATS Etc.. VSP/GAJA-AQUA/123K/X/80/S2/SE13/778 02.04.2019 Information
Commented Commented Retained for Reference
21.09.2019 28.09.2019
LIST OF COMMISSIONING SPARES 27.09.2019 01.10.2019
29 VSP/GAJA-AQUA/123K/X/80/S2/SE13/779 10.05.2019 Information
INDICATOR PANEL Retained for
Commented
Reference
LIST OF SPARE PARTS(Indication Lamp(Each colour 10 Nos),Power Contractor Each 26.09.2019 28.09.2019
27.09.2019 30.09.2019
30 rating 10%,Control Contractor Each rating 10%,MCCB Each rating 10%) VSP/GAJA-AQUA/123K/X/80/S2/SE13/780 10.05.2019 Information
Retained for
LIGHTING TRANSFORMER Commented
Reference
Submission is done
2 QUALITY ASSURANCE PLAN FOR CIVIL VSP/GAJA-AQUA/123K/X/80/S2/SE13/791 30.03.2019 Approval partwise as
equipment
asseblies and
3 QUALITY ASSURANCE PLAN FOR INSTRUMENTS VSP/GAJA-AQUA/123K/X/80/S2/SE13/792 30.03.2019 Approval
approved
accordingly
4
QUALITY ASSURANCE PLAN FOR ELECTRICAL VSP/GAJA-AQUA/123K/X/80/S2/SE13/793 30.03.2019 Approval
VII MANUALS
DETAILED ERECCTION SCHEDULE AND MANUALS, ASSEMBLY DRAWINGS,
1 VSP/GAJA-AQUA/123K/X/80/S2/SE13/794 21.06.2019 Information
ERECTION SEQUENCE
20200316-Status+MDL-SE-13 7 Aquadesigns
MASTER DOCUMENT LIST
CUSTOMER : M/S RASHTRIYA ISPAT NIGAM LIMITED VSP DOC. NAME MASTER DOCUMENT LIST
CONSULTANT : - MECON LIMITED DOC. NO. VSP/GAJA-AQUA/123K/X/80/S2/SE13/701
CONTRACTOR : GAJA ENGINEERING PRIVATE LTD., DOC. REV. NO: 2
PROJECT : EFFLUENT TREATMENT PLANT AUGMENTATION DATE 16.03.2020
Target Date for
SNo. Description GAJA Drawing / Document Number Submission Category Rev. 00 Rev. 01 Rev. 02 Rev. 03 Rev. 04 Rev.05
Submission
App.AsNoted Approved Re-Approved
GA of Steam Trap VSP/GAJA-AQUA/123K/X/ 80/S2/ SE13/708-A 24.10.2019 17.12.2019
14.11.2019 18.12.2019
Retained for
Commented
Reference
MECHANICAL GA DRAWING OF SLUDGE SUMP(SH-2 of 2) VSP/GAJA-AQUA/123K/X/ 80/S2/ SE13/732 15.06.2019 21.06.2019
17.06.2019 25.06.2019
Commented Approved
Pipe Schedule VSP/GAJA-AQUA/123K/X/ 80/S2/ SE13/706, Sh.10 of 18.09.2019 25.09.2019 04.10.2019 12.11.2019
10 20.09.2019 25.09.2019 04.10.2019 13.11.2019
Retained for Retained for
Commented Retained for Reference
Reference Reference