You are on page 1of 21

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE NO. VII
CEBU 4TH DISTRICT ENGINEERING OFFICE
POBLACION, DALAGUETE, CEBU

C.Y. 2023 PROJECT


DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF
WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS SYSTEMS,
CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY EL PARDO,MUNICIPALITY OF BOLJOON,
PROVINCE OF CEBU

2 UNIT - 16.00 KW SOLAR POWER SYSTEM


2 UNIT - 64.00 CU.M. RESERVOIR (4.0M x 4.0M x 4.0M)

SUBMITTED: RECOMMENDED: APPROVED:

LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL


OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE DATE DATE


INDEX OF DRAWINGS
SHEET NO. SHEET CONTENTS
1 COVER SHEET

2 INDEX OF DRAWINGS

3 LOCATION PLAN, KEY MAP; LOCATION MAP; VICINITY MAP

4 SUMMARY OF QUANTITIES

5-7 GENERAL NOTES

8-9 STRUCTURAL NOTES


RESERVOIR TANK ELEVATION VIEW; ISOMETRIC VIEW; WATER LEVEL
10
INDICATOR DETAILS; AND OVERFLOW PIPE DETAILS

SLAB MAIN BAR REINFORCEMENT DETAIL, FOUNDATION PLAN, L - BAR DETAIL,


11
TANK FOUNDATION BLOW-UP DETAIL

DRAIN BOX SPOT DETAIL, DRAIN BOX BLOW-UP DETAIL


12
DRAIN BOX ELEVATION DETAIL
EXTERIOR LADDER DETAILS; MANHOLE DETAILS; WALL REINFORCEMENT
13
DETAILS AND DRAIN BOX DETAILS
STANDARD ARRAY PV MODULE SUPPORT LAYOUT, STANDARD ARRAY PV SIDE
14 VIEW DOUBLE ROW VERTICAL SOLAR PANEL CONCRETE PEDESTAL DETAILS
PRESSING / PRESSURE BLOCK
FLOOR PLAN, FOUNDATION PLAN, ROOF FRAMING PLAN, ELEVATION VIEW,
15
COLUMN & FOOTING DETAIL, WALL FOOTING DETAIL, BEAM DETAIL
ON ROOF PV SOLAR PANEL PLAN, CONNECTION DETAIL,
16
AND MOUNTING BRACKET DETAILS
17 - 18 SINGLE LINE DIAGRAM

19 BACK - UP AND QUANTITY CALCULATION

20 DEMOUNTABLE PROJECT ENGINEER'S FIELD OFFICE

21 STANDARD DPWH PROJECT BILLBOARD, STANDARD COA PROJECT BILLBOARD

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 2
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
INDEX OF DRAWINGS PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
Luzon
Strait
N

South
China
Luzon
PROPOSED TANK 2 / SOLAR Sea
Philippine
Sea
PANEL ARRAYS No.2

Mindoro

THIS SITE
Samar
REGION VII
Panay
Leyte
Palawan Cebu
Negros

N Bohol
Sulu Sea

Mindanao

KEY MAP

Cebu

tal
rien
Bohol

sO
gro
Ne
THIS SITE
Siquijor

REGION VII MAP

LOCATION MAP

NANGKA

EL PARDO

SAN ANTONIO BACLAYAN

SITE LOCATION
( BARANGAY EL PARDO )
ARBOR

)
AD
RO
UTH
SO
POBLACION

BU
UPPER BECERRIL

(CE
VE.
LUNOP
PROPOSED TANK 1 / SOLAR

OA
LOCATION PLAN
LOWER BECERRIL

ALS
BAC
1 PANEL ARRAYS No.1

LIO
TA
NA
03 SCALE NTS GRANADA

GRANADA SOUTH

BOLJOON MAP

BOLJOON VICINITY MAP

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII
C.Y. 2023 PROJECT LOCATION PLAN ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /
KEY MAP 3
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON,
LOCATION MAP ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU VICINITY MAP CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
SUMMARY OF QUANTITIES

PLEASE BE NOTED THAT THE QUANTITIES ARE SUBJECT TO


INCREASE OR DECREASE AS PER ACTUAL ACCOMPLISHMENT

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 4
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SUMMARY OF QUANTITIES PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
G E N E R A L N O T E S
GENERAL ABBREVIATIONS
LOCAL WATER UTILITIES ADMINISTRATION LWUA JOINT JT.
AND & OR KILOMETER KM.
AT @ MANHOLE MH
APPROXIMATE APPROX. MANUFACTURERS MFR'S
ASBESTOS-CEMENT PRESSURE PIPE ACPP MAXIMUM MAX.
ASSEMBLY ASSY. MECHANICAL MECH.
STEEL WOOD ROUGH CONCRETE EARTH GRAVEL
(SECTION) ADJACENT ADJ. METER M.
AIR VACUUM AND RELEASE VALVE AV/ARV MILD STEEL M.S.
PLYWOOD BENCH MARK BM MILLIMETER mm.
BLOW-OFF B.O. MINIMUM MIN.
SECT. BOULEVARD BLVD. MISCELLANEOUS MISC.
PLAN
BUILDING BLDG. MONUMENT MON.
ELEV. BUTTERFLY B'FLY MOTOR CONTROL CENTER MCC
CENTER TO CENTER C TO C NATURAL NAT.
WOOD-FINISH BRICKS-C.H.B. ROCK SAND CONC. C.H.B. CENTERLINE CL NORTH N
CENTIMETER cm. NOT TO SCALE N.T.S.
COLUMN COL. NUMBER NO OR #
CONCRETE CONC. ON CENTER O.C.
CONCRETE HOLLOW BLOCKS C.H.B. OUTSIDE DIAMETER O.D.
CONTINUED CONT. PAVEMENT PAVMT.
COUPLING CPLG. PLATEPLAN PL
GENERAL LEGEND CUBIC METER CU.M. POLYETHYLENE PIPE PEP
CYLINDER CYL. POLYVINYL CHLORIDE PVC
CLEARANCE CL. POWER POLE PP
EXISTING CURB AND GUTTER ANY OTHER WIRE FENCE CHLORINE CL2 PROPERTY LINE P.L.
CONCRETE BOX CULVERT C.B.C. REINFORCING REINF.
EXISTING SIDEWALK CENTER LINE OF CONSTRUCTION DETAIL DET. REINFORCED CONCRETE R.C.
CENTER LINE OF RIGHT OF WAY DIAMETER DIA. OR Ø REINFORCED CONCRETE PIPE RCP
EXISTING WATER PIPES W CENTERLINE OF ROADWAY DIMENSION DIM. REQUIRED REQ'D
DRAWING DWG REVISION OR REVISED REV.
PROPOSED WATER LINE W AIR RELEASE AND AIR VACUUM ASSY. EACH E.A. RIGHT-OF-WAY R/W
EACH FACE E.F. RIGID STEEL CONDUIT RSC
PROPOSED DRAINAGE LINE D HOSE BIBB PLAN ELEV. EAST E ROAD RD.
ELBOW EL. ROUND BARS RB.
EXISTING TOP OF CUT OR FILL OF SLOPE BUTTERFLY VALVE EQUIPMENT EQUIP. REINFORCED CONCRETE BOX CULVERT RCBC
EXISTING EXIST. SECTION SECT.
PROPOSED TOP OF CUT OR FILL OF SLOPE PRESSURE GAUGE WITH PET COCK EXTERIOR EXT. SHEET SHT.
FINISH FIN. SOUTH S
PROPOSED FINISH GRADE 60 UNION FINISH GRADE F.G. SPECIFICATIONS SPECS.
FINISH SURFACE F.S. STANDARD STD.
EXISTING GRADE 60 PERCENTAGE FIRE HYDRANT F.H. STEEL STL.
FLANGE FLG. STREET ST.
FH-
EXISTING FIRE HYDRANT PLUG VALVE FLOOR FLR. TELEPHONE POLE T.P.
FLANGEDLWUA FLGD. THICK JT. THK.
FH-
PROPOSED FIRE HYDRANT STRAINER FLOOR DRAIN F.D. TYPICAL KM. TYP.
GALVANIZED IRON PIPE G.I.P. VALVE OR VOLT V
BOV-
PROPOSED BLOW-OFF VALVE ASSEMBLY CANAL GATE VALVE G.V. VERTICAL VERT.
GRADE ACPP GR. WEST OR WATTS ORWATER OR WIDE FLANGE W
BOV-
EXISTING BLOW-OFF SLEEVE TYPE COUPLING HIGHWAYASSY. HWY WITH MECH. w/
HORIZONTAL HORZ. GALVANIZED STEEL PIPE GSP
PERMANENT BENCH MARK MECHANICAL TYPE COUPLING HORSE POWER H.P. REINFORCED CONCRETE DRAIN PIPE RCDP
BM
SURVEY MONUMENT HOSE BIBB H.B. STAINLESS STEEL SS
REDUCER INSIDE DIAMETER I.D. NOT INCLUDE IN CONTRACT N.I.C.
TEMPORARY BENCH MARK NATURAL GRADE LINE NGL
SURVEY MONUMENT TBM ANGLE

POWER POLE PP TWO ANGLES

TELEPHONE POLE TP CHANNEL

CHECK VALVE WELDED

MANHOLE MH WELDED ALL AROUND

GATE VALVE WELDED BOTH SIDE

FENCE (MASONRY)

PROPERTY LINE
RIGHT-OF-WAY LINE RESERVOIR TANK

WATER SOURCE S

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / GENERAL NOTES 5
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER (LEGENDS & ABBREVIATIONS)
PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
G E N E R A L N O T E S
c. EPDM RUBBER FOR BONNET AND RUBBER MANCHETTE; AND NBR FOR STEM SEALING WIPER
I. GENERAL REQUIREMENTS RING AND O-RING FOR INSIDE BEARING. H. PRODUCT WARRANTY
6. THE MAXIMUM ALLOWABLE DEPTH OF CUTS, SCRATCHES OR GOUGES ON THE
1. ALL WORKS SHALL COMPLY WITH THE FOLLOWING: d. COMPONENTS THAT MIGHT BE MADE OF BRASS OR BRONZE SHALL BE TO ASTM OR COPPER EXTERIOR OF THE PIPE IS 5 PERCENT OF WALL THICKNESS. THE INTERIOR PIPE
1. THE MANUFACTURER/DEALER SHALL GUARANTEE THE PURCHASER THAT THE
- DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS, VOLUME III DEVELOPMENT ASSOCIATION (CDA) RECOGNIZED ALLOY SPECIFICATIONS. ALL BRONZE PARTS SURFACE SHALL BE FREE OF CUTS, GOUGES OR SCRATCHES. SECTIONS OF PIPE
HDPE PIPES AND ALL OTHER ITEMS/APPURTENANCES FURNISHED ARE NEW
- DPWH STANDARD SPECIFICATIONS 2013 EDITION SUBJECT TO WETTING BY LINE CONTENT SHALL BE GRADE A, D, OR E AND SHALL NOT CONTAIN WITH CUTS, SCRATCHES OR GOUGES EXCEEDING 5 PERCENT OF THE PIPE WALL
AND OF CURRENT MANUFACTURE, FREE FROM DEFECTS IN MATERIALS DESIGN
MORE THAN 8 PERCENT LEAD (US SAFE DRINKING WATER ACT AMENDMENTS OF 1986). THICKNESS SHALL BE REMOVED COMPLETELY AND THE ENDS OF THE PIPELINE
AND WORKMANSHIP AND SHALL WORK BEST WITHIN A MINIMUM PERIOD OF
2. UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE EXPRESSED IN MILLIMETER WHILE REJOINED.
ONE (1) YEAR STARTING FROM THE DATE OF ACCEPTANCE OF THE PRODUCTS
DISTANCES AND ELEVATIONS ARE IN TERMS OF METER. e. WEDGE NUT SHALL BE MADE OF DEZINCIFICATION RESISTANT BRASS, CZ 132 TO BS 2874 WHILE BY THE PURCHASER, DURING THE WARRANTY PERIOD. IF THE HDPE PIPES OR
THRUST COLLAR SHALL BE DEZINCIFICATION RESISTANT BRASS, CZ 132 TO BSA 2872. 7. PIPE SHALL BE LAID TO LINES AND GRADE SHOWN ON THE DRAWINGS WITH BEDDING
OTHER ITEMS FURNISHED ARE FOUNT TO BE DEFECTIVE DUE TO MATERIALS,
3. FIELD DATA OF THIS PROJECT IS BASED ON THE ACTUAL SURVEY CONDUCTED ON AND BACKFILL AS SHOWN ON THE DRAWINGS.
DESIGN AND WORKMANSHIP UNDER NORMAL CONDITION, OPERATION AND
FEBRUARY 2019 BY THE SURVEY TEAM OF THE DPWH CEBU 4TH ENGINEERING f. COATING SHALL BE ELECTRONICALLY APPLIED EPOXY RESIN TO DIN 30677-INTERNALL AND USE, THE MANUFACTURER/DEALER NAT HIS OWN OPTION SHALL EITHER
OFFICE EXTERNALLY. 8. WHEN LAYING IS NOT IN PROGRESS, INCLUDING LUNCH TIME, THE OPEN ENDS OF THE
REPLACE OR REPAIR THE DEFECTIVE PRODUCT/S TO ITS ORIGINAL CONDITION.
PIPE SHALL BE CLOSED BY FABRICATED PLUGS, OR BY OTHER APPROVED MEANS
A CERTIFICATE OF WARRANTY IS REQUIRED TO THIS EFFECT.
4. AS-STAKED PLAN SHALL BE PREPARED BY THE WINNING CONTRACTOR BASED ON 2. CAST IRON FITTINGS SHALL BE ACCORDANCE WITH ANSI/AWWA C 110-93 (AMERICAN NATIONAL
THE PRE-CONSTRUCTION SURVEY JOINTLY CONDUCTED BY THE CONTRACTOR, STANDARD FOR GRAY-IRON AND DUCTILE-IRON FITTINGS FOR WATER AND LIQUIDS). FITTINGS 9. GOOD ALIGNMENT SHALL BE PRESERVED DURING INSTALLATION. DEFLECTION OF THE
I. PRODUCT WARRANTY
IMPLEMENTING OFFICE AND CONSTRUCTION SUPERVISION CONSULTANTS (CSC) SHALL BE CAST FROM GRAY-IRON IN ACCORDANCE WITH ASTM A 126, CLASS B OR ASTM A 48, PIPE SHALL OCCUR ONLY AT THOSE PLACES ON DESIGN DRAWINGS AND AS
SERVICES / CONTRACTS. CLASS 40 AND SHALL BE LINED WITH CEMENT MORTAR IN ACCORDANCE WITH ANSI/AWWA C APPROVED BY THE ENGINEER.
1. THE MANUFACTURER SHALL FURNISH THE PURCHASER WITH AN AFFIDAVIT
104-95. STATING THAT THE HDPE PRESSURE PIPES AND ALL OTHER
5. IN ACCORDANCE WITH DEPARTMENT ORDER NO. 28 SERIES OF 2015, UPON THE 10. ALL HDPE PIPES MUST BE AT THE TEMPERATURE OF THE SURROUND SOIL AT THE
ITEMS/APPURTENANCES USED IN THE CONSTRUCTION CONFORM TO ALL
ISSUANCE BY THE DPWH OF THE NOTICE TO PROCEED (NTP), THE IMPLEMENTING 3. FIRE HOSE OUTLETS NOZZLE THREADS SHALL BE CONFORM TO THE NATIONAL AMERICAN TIME OF BACKFILLING AND COMPACTION.
APPLICABLE REQUIREMENTS AND SPECIFICATIONS AND THAT ALL TEST
OFFICE SHALL PROVIDE THE CONTRACTOR AN EDITABLE ELECTRONIC COPY OF THE STANDARD FIRE HOSE COUPLING SCREW THREADS. SPECIFIED HEREIN HAVE BEEN PERFORMED AND ALL TEST REQUIREMENTS
APPROVED PLANS FOR THE PROJECT TO FACILITATE THE PREPARATION BY THE B. JOINING METHOD
HAVE BEEN MET.
CONTRACTOR OF THE AS-STAKED PLAN. ANY DISPARITY BETWEEN THE AS-STAKE 4. HYDRANTS SHALL BE PAINTED IN ACCORDANCE WITH THE SPECIFICATIONS. COLOR SHALL BE
PLANS MAY SERVE AS THE BASIS FOR INITIAL VARIATION ORDER. YELLOW UNLESS OTHERWISE DIRECTED BY THE SUPERVISING ENGINEER. 1. THE PIPE SHALL BE JOINED BY THE METHOD OF THERMAL BUTT FUSION. ALL JOINTS
SHALL BE MADE IN STRICT COMPLIANCE WITH THE MANUFACTURER;S
6. "AS-STAKED" SHALL BE NEW SET OF PLANS DEPICTING THE ACTUAL FIELD RECOMMENDATIONS. A FACTORY QUALIFIED JOINING TECHNICIAN AS DESIGNATED BY
REQUIREMENT, IN ADDITION, STANDARD DRAWING AND OTHER DRAWINGS WITHOUT PIPE MANUFACTURER OR EXPERIENCED, TRAINED TECHNICIAN SHALL PERFORM ALL
CHANGES NEED NOT BE REDRAWN IN THE PREPARATION OF AS-STAKED PLANS. A C. PRODUCTION INSPECTION HEAT FUSION JOINTS IN THE PRESENCE OF THE INSPECTOR.
COPY OF THE APPROVED ORIGINAL DESIGN PLAN SHALL BE INCLUDED IN THE III. GENERAL REQUIREMENTS
SUBMISSION OF THE "AS-STAKED" TO FACILITATE THE REVIEW, EVALUATION AND 1. WHEN PLANT INSPECTION IS SPECIFIED, THE MANUFACTURER SHALL PROVIDE THE PURCHASER 2. LENGTHS OF PIPE SHALL BE ASSEMBLED INTO THE SUITABLE INSTALLATION LENGTHS
APPROVAL OF THE LATTER. WITH ADEQUATE NOTICE OF WHEN AND WHERE PRODUCTION OF ORDERED MATERIALS WILL 1. ALL HDPE PIPE AND FITTINGS SHALL HAVE A MINIMUM HYDROSTATIC DESIGN BY THE BUTT FUSION PROCESS. ALL PIPES SO JOINED SHALL BE MADE FROM THE
START. THE MANUFACTURER SHALL SUBMIT IN WRITING TO DPWH THE COMPLETE DESCRIPTION BASIS (HDB) OF 1.160 PSI SAME CLASS AND TYPE OF RAW MATERIAL MADE BY THE SAME MATERIAL SUPPLIER.
7. PRIOR CLEARANCE OR AUTHORITY SHALL BE SECURED FROM THE DISTRICT OF THE HDPE 100 RAW MATERIALS PARTICULARLY THE VIRGIN COMPOUNDS AT LEAST 15 PIPE SHALL BE FURNISHED IN STANDARD LAYING LENGTHS NOT TO EXCEED 50 FEET
ENGINEER FOR PORTIONS INVOLVING MAJOR CHANGES THAT WOULD ENTAIL / CALENDAR DAYS PRIOR TO START OF PRODUCTION. 2. VALVES SHALL BE DESIGNED FOR A MINIMUM WORKING PRESSURE OF 10 BARS AND NO SHORTER THAN 20 FEET.
SURMOUNT TO CERTAIN CHANGES ON THE ORIGINAL ITEMS OF WORK. = 145 PSI (1.0 MPA)
2. THE DPWH REPRESENTATIVE OR INSPECTOR SHALL HAVE FREE ACCESS TO THOSE PART OF A 3. ALL BOLTS FOR FLANGE ADAPTER ASSEMBLIES SHALL BE TIGHTENED TO THE
8. POTABILITY TEST FOR THE PIPELINES SHALL BE CONDUCTED BY ANY DEPARTMENT MANUFACTURER'S PLANT THAT ARE NECESSARY TO ASSURE THAT PRODUCTS COMPLY WITH ALL 3. CAST-IRON FITTINGS SHALL BE DESIGNED FOR A MINIMUM WORKING MANUFACTURER'S SPECIFIED TORQUES. BOLTS SHALL BE TIGHTENED
OF HEALTH (DOH) ACCREDITED TESTING LABORATORY TO VERIFY COMPLIANCE IN REQUIREMENTS. PRESSURE OF 250 PSI (1.72 MPA) ALTERNATIVELY AND EVENLY.
THE PARAMETERS SET FOR DRINKING WATER BY PHILIPPINE NATIONAL STANDARDS
(PNS). 4. THE REPETITIVE SURGE PRESSURE ALLOWANCE IS ONE HALF THE PRESSURE
D. MATERIAL QUALITY ASSURANCE CLASS OF THE PIPE, AND THE OCCASIONAL SURGE PRESSURE ALLOWANCE IS C. CLEANING
9. IF DURING COMMISSIONING, THE SYSTEM OR ANY POSITION / APPURTENANCE EQUAL TO THE PRESSURE CLASS OF THE PIPE (PER AWWA C906).
THEREOF FAILS TO DELIVER THE REQUIRED OUTPUT, THE CONTRACTOR SHALL BEAR 1. ALL HDPE 100 RAW MATERIALS SHALL BE INSPECTED BY THE DPWH REPRESENTATIVE/S PRIOR TO 1. AT THE CONCLUSION OF THE WORK, THOROUGHLY CLEAN ALL OF THE NEW PIPE
THE COST IN TAKING CORRECTIVE AVTIONS OR TO INSTALL APPURTENANCE START OF COMPOUNDING ACTIVITY. THEREIN, ALL RAW MATERIALS IN THEIR ORIGINAL PACKING 5. ALLOWABLE TOTAL PRESSURE DURING RECURRING SURGE CONDITION LINES TO REMOVE ALL DIRT, STONES, PIECES OF WOOD OR OTHER MATERIAL WHICH
NECESSARY TO PRODUCE THE REQUIRED PERFORMANCE, VOLUME, AND QUALITY OF SHALL BE INSPECTED, MARKED AND SIGNED WITH INDELIBLE PEN ON THE SEALED PORTION OF EQUALS 1.5 TIMES THE PIPE'S PRESSURE CLASS MAY HAVE ENTERED DURING THE CONSTRUCTION PERIOD BY FORCING A CLEANING
THE WATER AND THE SYSTEM ITSELF. THE CONTAINER WHEREIN IT WILL BE RECORDED IN THE MANIFEST THAT SHALL BE SIGNED BY SWAB THROUGH ALL MAINS 4" OR GREATER. FLUSHING VELOCITIES SHALL BE A
BOTH THE INSPECTOR ANHD PERSONNEL IN-CHARGE OF THE RAW MATERIAL STORAGE. 6. ALLOWABLE TOTAL PRESSURE DURING OCCASIONAL SURGE CONDITION MINIMUM OF 2.5 FEET PER SECOND.
EQUALS 2.0 TIMES THE PIPE'S PRESSURE CLASS
II. SPECIFICATIONS
E. PRODUCT SAMPLING AND TESTING 7. AVERAGE DAILY DEMAND FOR THE CENTRAL SECTION AND MEDIA ONCE ARE D. TESTING
5.300.7 CU.M./D. AND 250.1 CU.M./D. BASED ON 2019 SERVED POPULATION AND
A. DESCRIPTION 1. THE PIPES SHALL BE SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS AND WATER DEMAND 1. PRESSURE TESTING SHALL BE CONDUCTED AS APPROVED BY THE ENGINEER.
METHODS PRESCRIBED IN PNS ISO 4427:2002; PWWA NM 201:2002, LATEST EDITION, WITH THE
THIS ITEM SHALL CONSIST OF FURNISHING ALL MATERIALS, TOOLS, EQUIPMENT AND PRESENCE OF QUALITY CONTROL INSPECTOR/S LABORATORY TESTS SHALL BE CONDUCTED BUT 8. BEARING AREAS OF THRUST BLOCKS ARE BASED ON AN ASSUMED SOIL 2. ALL HDPE WATER MAINS SHALL BE DISINFECTED PRIOR TO PRESSURE TESTING
FIXTURES REQUIRED AS SHOWN ON THE PLANS FOR THE SATISFACTORY OF THE ENTIRE NOT LIMITED TO THE FOLLOWING. BEARING PRESSURE OF 96 KPA (2000 PSF) AND ON INTERNAL PRESSURE OF
PLUMBING SYSTEM INCLUDING INSTALLATION IN ACCORDANCE WITH THE LATEST EDITION 106 MPA (150 PSI). 3. ALL HDPE MAINS SHALL BE FIELD-TESTED. CONTRACTOR SHALL SUPPLY ALL LABOR,
OF THE NATIONAL PLUMBING CODE, AND THIS SPECIFICATION. a. DIMENSIONAL AND OTHER PHYSICAL TEST f. HEAT REVERSION TEST EQUIPMENT, MATERIAL, GAGES, PUMPS, METERS AND INCIDENTALS REQUIRED FOR
b. IMPACT TEST g. ACETONE TEST 9. CONCRETE FOR THRUST BLOCK SHALL BE 20.68 MPA (3000 PSI) TESTING. EACH MAIN SHALL BE PRESSURE TESTED UPON COMPLETION OF THE PIPE
B. MATERIAL REQUIREMENTS c. 100% FLATTENING/COMPRESSION TEST h. SHORT TERM HYDROSTATIC TEST LAYING AND BACKFILLING OPERATIONS.
d. BENDING TEST i. LONG TERM HYDROSTATIC TEST
ALL PIPING MATERIALS, FIXTURES AND APPLIANCES FITTING ACCESSORIES WHETHER e. TENSION OR ELONGATION TEST j. BURST PRESSURE TEST 4. ALL MAINS SHALL BE TESTED AT 150% OF THE OPERATING DESIGN PRESSURE OF THE
SPECIFICALLY MENTIONED OR NOT BUT NECESSARY THIS ITEM SHALL BE FURNISHED AND PIPE UNLESS OTHERWISE APPROVED BY THE ENGINEER.
INSTALLED. 2. VALVE SHALL BE TESTED FOR: IV. SPECIFICATIONS
5. IF THERE ARE NO VISUAL LEAKS OR SIGNIFICANT PRESSURE DROPS DURING THE
C. WATER SUPPLY PIPES AND FITTINGS · DESIGN TESTING FINAL TEST PERIOD, THE INSTALLED PIPE PASSES THE TEST.
a. HYROSTATIC TEST c. LEAKAGE TEST A. INSTALLATION
1. PIPES b. TORQUE TEST d. PRESSURE TEST 6. IF ANY TEST OF PIPE LAID DISCLOSED LEAKAGE SIGNIFICANT PRESSURE DROP
PIPES SHALL BE GALVANIZED IRON PIPE SCHEDULE 40 CONFORMING TO SPECIFICATION 1. HDPE DENSITY POLYETHYLENE (HDPE) PIPE SHALL BE INSTALLED AS SHOWN GREATER THAN THE MANUFACTURER'S RECOMMENDED LOSS, THE CONTRACTOR
REQUIREMENTS DEFINED IN ASTM 8-29. · PRODUCTION TESTING ON THE DRAWINGS AND AS SPECIFIED HEREIN. SHALL, AT HIS/HER OWN EXPENSE, LOCATE AND REPAIR THE CAUSE OF LEAKAGE AND
a. OPERATION TEST c. SEAL TEST RETEST THE LINE.
FITTINGS SHALL BE MALLEABLE IRON TYPE-II, GALVANIZED IRON CONFORMING TO b. SHELL TEST 2. HDPE SHALL BE INSTALLED BY OPEN TRENCH CONSTRUCTION.
SPECIFICATION REQUIREMENTS DEFINED IN ASTM A338. 7. ALL VISIBLE LEAKS SHALL BE REPAIRED REGARDLESS OF THE AMOUNT OF LEAKAGE.
F. DELIVERY 3. CARE SHALL BE TAKEN IN LOADING, TRANSPORTING AND UNLOADING TO
2. VALVES PREVENT DAMAGE TO THE PIPE. PIPE OR FITTING SHALL NOT BE DROPPED. 8. THE CONTRACTOR MUST SUBMIT HIS PLAN FOR TESTING TO THE ENGINEER FOR
VALVES FOR WATER SUPPLY SHALL BE BRONZE BODY WITH THREADED ENDS RATED 21.0 1. ALL PIPES PRIOR TO DELIVERY SHALL BE PROVIDED WITH PLASTIC CAPS ON BOTH ENDS. THIS IS ALL PIPE OR FITTING SHALL BE EXAMINED BEFORE INSTALLATION, AND NO REVIEW AT LEAST 10 DAYS BEFORE STARTING THE TEST AND SHALL NOTIFY THE
kgf/cm. SQUARE. ALL VALVES SHALL BE GATE VALVES UNLESS OTHERWISE SPECIFIED. TO PREVENT DIRT AND RODENTS FROM ENTERING THE PIPES DURING SHIPMENTS OR PIECE SHALL BE INSTALLED WHICH IS FOUND TO BE DEFECTIVE. ANY DAMAGE INSPECTOR A MINIMUM OF 48 HOURS PRIOR TO TEST.
GATE VALVES SHALL HAVE SOLID WEDGE BODY AND DISCS CONFORMING TO TEMPORARY STORAGE IN PORTS AND HARBORS, THIS WILL ALSO SERVE AS PERMANENT TO THE PIPE SHALL BE REPAIRED AS DIRECTED BY THE ENGINEER. IF ANY
SPECIFICATION REQUIREMENTS DEFINED IN ASTM 8-26. GLOBE VALVES SHALL HAVE PLUG COVERING OF ALL ENTRIES OF FOREIGN MATERIALS UNTIL THESE PIPES WILL BE INSTALLED DEFECTIVE PIPE IS DISCOVERED AFTER IT HAS BEEN INSTALLED, IT SHALL BE
TYPE DISCS WITH FERRULE THREADED ENDS AND BRONZE BODY. WHERE IT IS INTENDED TO BE. REMOVED AND REPLACED WITH A SOUND PIPE IN A SATISFACTORY MANNER
BY THE CONTRACTOR, AT HIS OWN EXPENSE
3. UNIONS G. INSTALLATION
V. HYDRAULIC DESIGN DATA
UNIONS ON FERROUS PIPE 50mm IN DIAMETER AND SMALLER SHALL BE MALLEABLE IRON. 4. ROPES, FABRIC, OR RUBBER PROTECTED SLINGS AND STRAPS SHALL BE USED
1. BURIED HDPE PIPE SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321 OR ASTM D2774 FOR WHEN HANDLING PIPES. CHAINS, CABLES OR HOOKS INSERTED INTO THE PIPE 1. THE MAXIMUM AND MINIMUM FLOW IN THE PIPE NETWORK ARE 83.07 L/S AND 0.03 L/S,
4. WATER METER PRESSURE SYSTEMS AND AWWA MANUAL OF PRACTICE M55 CHAPTER 7. ENDS SHALL NOT BE USED. TWO SLINGS SPREAD APART SHALL BE USED FOR RESPECTIVELY
WATER METER WHERE REQUIRED TO BE FURNISHED BY THE CONTRACTOR SHALL BE OF LIFTING EACH LENGTH OF PIPE.
THE TYPE TESTED AND APPROVED BY MWSS. 2. COMPACT BACKFILL PER ASTM D698 AND ASSHTO T-99 AS MODIFIED BY NCDOT TO 95% MAXIMUM 2. THE MAXIMUM VELOCITY IN THE PIPELINE IS 1.81 M/S.
DENSITY WITHIN A ROAD RIGHT-OF-WAY. 5. PIPES SHALL BE STORED ON LEVEL GROUND, PREFERABLY TURF OR SAND,
D. APPURTENANCES FREE OF SHARP OBJECTS, WHICH COULD DAMAGE THE PIPE. STACKING OF 3. THE HIGHEST AND LOWEST PRESSURE HEADS ARE 45.32 M AND 5.21 M.
3. PIPE SHALL BE JOINED WITH BUTT, HEAT FUSION JOINTS AS OUTLINED IN ASTM D2657 AND THE POLYETHYLENE PIPE SHALL BE LIMITED TO A HEIGHT THAT WILL NOT RESPECTIVELY.
1. GATE VALVES SHALL CONFORM TO THE RESILIENT SEATED GATE VALVES IN ACCORDANCE CONFORM TO THE BUTT FUSION JOINING PROCEDURE FOR FIELD JOINING OF POLYETHYLENE CAUSE EXCESSIVE DEFORMATION OF BOTTOM LAYERS OF PIPES UNDER
WITH DIN 3352 PART 4. FLANGES AND DRILLING ACCORDING TO ISO 7005-2 (EN 1092-2, 1997, PIPE ANTICIPATED TEMPERATURE CONDITIONS. WHERE NECESSARY DUE TO 4. THE HIGHEST AND LOWEST HYDRAULIC GRADE LINES RECORDED AT 60.32 M AND
DIN 2501) UNLESS OTHERWISE SPECIFIED IN THE PURCHASE ORDER. OTHER GROUND CONDITIONS, THE PIPE SHALL BE STORED ON WOODEN SLEEPERS, 12.58M, RESPECTIVELY.
SPECIFICATIONS ARE AS FOLLOWS. 4. MECHANICAL JOINT SHALL CONFORM TO ANSI/AWWA C111-95. SPACED SUITABLY AND OF SUCH WIDTH AS NOT TO ALLOW DEFORMATION OF
THE PIPE AT THE POINT OF CONTACT WITH THE SLEEPER OR BETWEEN
a. DUCTILE IRON SHALL CONFORM TO GGG-50, TO DIN 1693 (BS 2789 GRADE 500-7) SUPPORTS.

b. STAINLESS STEEL SHALL CONFORM DINX 20 Cr 13 FOR STEM AND A2 FOR BONNET BOLTS
SEALED WITH HOT MELT PROCESS.

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 6
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
GENERAL NOTES (2) PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
G E N E R A L N O T E S
A. CONCRETE RESERVOIR
V. NOTES ON REINFORCEMENT VI. NOTES ON FOOTING
I. GENERAL REQUIREMENTS III. LIST OF REFERENCES
1. ALL REINFORCEMENT BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR 1. SOIL BEARING CAPACITY WAS BASED ON ASSUMED PRELIMINARY SOIL ANALYSIS ARE
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE 1. THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE DIAMETER 10MM AND SMALLER BARS AND GRADE 60 FOR DIAMETER 12MM AND AS FOLLOWS:
AND SHALL NOTIFY THE ENGINEER OF DISCREPANCIES BETWEEN ACTUAL PROJECT: LARGER BARS.
CONDITIONS AND INFORMATION SHOWN ON THE DRAWINGS BEFORE PROCEEDING STRUCTURE ASSUMED NET BEARING CAPACITY OF SUBSOIL
WITH THE WORK. THIS SHALL INCLUDE THE LOCATION AND DIMENSIONS OF a. AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS ACI 315-63 2. STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER ASTM A
GROOVES, REGLETS, SLEEVES, CURBS, OPENINGS, EMBEDDED, OR ATTACHED MANUAL OF STANDARDS PRACTICE FOR THE DETAILS AND 706 . BARS SMALLER THAN 10MM MAY BE PLAIN. CONCRETE RESERVOIR 96 KPa
ITEMS ETC. DETAILING OF CONCRETE REINFORCEMENT ACI - 350 R - 63
SANITARY ENGINEERING STRUCTURES 3. ALL REINFORCING BARS SHALL BE CLEAN OF RUST, GREASE OR OTHER 2. BOTTOM OF FOOTING SHALL BE AT LEAST 1.5m BELOW NATURAL GRADE LINE.
2. ALL INDICATED DIMENSIONS UNLESS OTHERWISE INDICATED SHALL TAKE MATERIALS THAT IMPAIR BOND.
PRECEDENCE OVER SCALED DIMENSIONS FROM PLANS, SECTIONS AND DETAILS. b. STRUCTURAL DESIGN MANUAL SPECIFICATIONS LATEST EDITION 3. SOIL BEARING CAPACITY SHALL BE IN CREASED BY 33% WHEN IN COMBINATION WITH
NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL 4. ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED SEISMIC OR WIND LOAD.
NOTES AND TYPICAL DETAILS. c. NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP), VOL.1, BEFORE POURING CONCRETE OR APPLYING MORTAR OR GROUT
(3RD EDITION, 1998 AND 4TH EDITION, 2001) 4. BACKFILL SHALL BE PLACED IN 0.20 LAYERS AND EACH LAYER SHALL BE COMPACTED
3. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE 5. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE TO 95% MAXIMUM DRY DENSITY.
FINISH STRUCTURE. THEY DO NOT INDICATE THE METHODS OF CONSTRUCTIONS, d. PHILIPPINE NATIONAL STANDARDS (PNS). MEMBERS CONNECTED.
UNLESS SO STATED. THE CONTRACTOR SHALL SHALL PROVIDE ALL NECESSARY 5. ALL ELEVATION BACKFILLING AND COMPACTION SHALL BE INSPECTED BY THE
MEASURES TO PROTECT THE STRUCTURES, ADJACENT PROPERTY, WORKMEN AND e. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC). 6. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. ENGINEERS.
OTHER PERSONS DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONDITION WHICH IN HIS 7. LAPPED SPLICES SHALL BE STAGGERED WHERE POSSIBLE. 6. WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF EMBEDMENT
OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE IV. NOTES ON CONCRETE MIXES AND PLACING INDICATED, EXCAVATE TO FIRM LAYER AND REPLACE LOOSE/SOFT MATERIALS
DISTRESS IN THE STRUCTURE 8. UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN UNDERNEATH THE FOOTING WITHIN THE FOOTING AREA PLUS 21 DEPTH OF SOFT
1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF ACCORDANCE WITH ACI - 318 - 97, EXCEPT THAT THE MINIMUM LAP SPLICE MATERIALS ON ALL SIDES WITH SELECTED GRANULAR BACKFILL COMPACT SELECTED
4. CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED SLABS. IT IS THE TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS SHALL BE 40 BAR DIAMETER BUT NOT LESS THAN 600mm. GRANULAR BACKFILL TO 95% OF MAXIMUM DRY DENSITY.
GENERAL CONTRACTOR'S RESPONSIBILITY TO ENDURE THAT SUBCONTRACTOR'S AS FOLLOWS:
ARE INFORMED AND DO NOT VIOLATE THIS IMPORTANT REQUIREMENT. 9. UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS: 7. COLUMN FOOTINGS AND BASE SLABS SHALL REST ON 0.50m. THK. LEAN CONCRETE AND
LOCATION 28 DAYS MAX. SIZE OF MAX 0.10m THK. WELL COMPACTED GRAVEL BASE COURSE.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND SHORING STRENGTH AGGREGATE SLUMP A. INTERMEDIATE BEAMS: TOP BARS SHALL BE SPLICED AT MIDSPAN AND BOTTOM
FOR ALL STRUCTURAL MEMBERS AS REQUIRED FOR STRUCTURE STABILITY DURING BARS AT THE SUPPORT. 8. NO FOUNDATIONS OR MAT FOUNDATION WILL LAND ON BACKFILL AREAS.
ALL PHASES OF CONSTRUCTION. SUSPENDED SLABS 4000 PSI(28 MPa) 20 mm 100 mm B. BEAMS FRAMING TO COLUMNS: TOP AND BOTTOM BARS SHALL NOT BE SPLICED
PEDESTAL 4000 PSI(28 MPa) 20 mm 100 mm WITHIN THE COLUMNS OR WITHIN A DISTANCE OF TWICE THE MEMBER 9. THE CONTRACTOR SHALL VERIFY THE ACTUAL SOIL BEARING CAPACITY FOR ALL
6. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO ENSURE PROPER SLAB ON GRADE 4000 PSI(28 MPa) 20 mm 100 mm DEPTH FROM THE FACE OF THE COLUMN. THE SPLICE LENGTH SHALL NOT STRUCTURES. ANY DISCREPANCIES SHALL BE SUBJECTED FOR SHOP DRAWINGS AND
ALIGNMENT OF THE STRUCTURE AFTER THE INSTALLATION OF ALL STRUCTURAL BE LESS THAN 1.4 TIMES THE DEVELOPMENT LENGTH (LD) IN 4.2.9 BELOW REVISIONS BY THE CONTRACTOR AND TO SUBMITTED FOR NOTIFICATION, AND
AND FINISH MATERIALS. 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: NOT LESS THAN 600mm. APPROVAL OF THE CONSULTANT.

7. TYPICAL DETAILS AND GENERAL NOTES IN THIS SHEET SHALL APPLY TO ALL PARTS SUSPENDED SLABS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 25 mm C. COLUMNS: LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN
HEIGHT AND THE SPLICE SHALL NOT BE LESS THAN 30 BAR DIAMETER.
OF THE JOB UNLESS OTHERWISE SHOWN ON DRAWINGS. SLAB ON GRADE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 40 mm
WELDING OR THE USE OF APPROVED MECHANICAL DEVICES MAY BE
VII. NOTES ON CONCRETE SLAB
WALLS ABOVE GRADE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 25 mm
8. GEOTECHNICAL INVESTIGATIONS SHALL BE CARRIED OUT BY THE CONTRACTOR IN COLUMN TIES - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 40 mm PERMITTED PROVIDED NOT MORE THAN ALTERNATE BARS ARE WELDED OR
SPLICE AT ANY LEVEL AND THE MINIMUM VERTICAL DISTANCE BETWEEN 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND
SITES WHERE GROUND CONDITION IS UNCERTAIN, SUCH AS RIVER CROSSING WHERE CONCRETE IS EXPOSED FROM THE TOP OF SLAB.
ABUTMENT AND RELOCATED SITES OF PROPOSED FACILITIES. TO EARTH BUT POURED AGAINST - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 50 mm TWO ADJACENT BAR SPLICES SHALL BE 600mm
FORMS
9. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH THE ACI.318 95 WHERE CONCRETE IS DEPOSITED - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 75 mm 10. UNLESS INDICATED OTHERWISE, ALL THE BEAMS TERMINATING AT A COLUMN
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL DIRECTLY AGAINST EARTH SHALL HAVE TOP AND BOTTOM BARS EXTENDING TO THE FAR FACE OF THE VIII. TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLAB
STRUCTURAL STEEL WORK ACCORDING WITH ASCI SPECIFICATION (9TH EDITION) IN COLUMN. TERMINATING IN A STANDARD 90° HOOK LENGTH OF ANCHORAGE
SO FAR AS THEY DO NOT CONFLICT WITH LOCAL BUILDING CODE REQUIREMENT. 3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION, SHALL NOT BE LESS THAN 600mm. 1. IF SLABS ARE REINFORCED BOTH WAYS, BARS ALONG THE SHORTER SPAN SHALL BE
RE-HANDLING OR FLOWING PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, PLACED BELOW THOSE ALONG SPAN AT THE CENTER AND OVER THE LONGER SPAN
10. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, ASCI TO AMERICAN INSTITUTE OF BUCKETS OR WHEELBARROWS. NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER 11. SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE
STEEL CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS. CONCRETE FROM HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE ENGINEER PRIOR TO FABRICATION AND INSTALLATION. COLUMN STRIPS SHALL BE APPROXIMATELY ONE AND A HALF (121) SLAB THICKNESS O4
THEY SHALL NOT EXCEED SIX (6) METERS IN AGGREGATE LENGTH. 45 CENTIMETERS.
11. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS, & 12. DEVELOPMENT LENGTH (LD) OF REINFORCING BARS SHALL BE AS FOLLOWS:
STRUCTURAL STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER. 4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS 2. UNLESS OTHERWISE NOTED IN THE PLANS, CONSTRUCTION JOINTS FOR ALL BEDDED
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL SIZE OF BARS (mm) DEVELOPMENT LENGTH SLABS SHALL NOT BE LESS THAN 3.65 METER APART.
II. GENERAL REQUIREMENTS CONDITIONS WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
10 170 3. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mmØ
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & 12 200 STEEL CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER
1. DEAD LOAD (DL) 16 270
SECURED IN PLACE PRIOR TO PLACING CONCRETE. BOTHWAYS.
20 380
CONCRETE -------------------------- 23.5 KN/m3 (150 pcf) 25 600
6. ALL CONCRETE SHALL BE KEPT MOIST FOR MINIMUM OF SEVEN (7) CONSECUTIVE DAYS
STEEL -------------------------- 77 KN/m3 (490 pcf)
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING
SOIL -------------------------- 17.6 KN/m3 (11.2 pcf) 13. PROVIDE EXTRA SETS OF TIES AT 100mm O.C. FOR TIED COLUMN
COMPOUNDS OR OTHER APPROVED METHODS.
WATER -------------------------- 9.81 KN/m3 (62.4 pcf) REINFORCEMENT ABOVE AND BELOW BEAM-COLUMN CONNECTIONS FOR A
7. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: DISTANCE FROM FACE OF CONNECTION EQUAL TO THE GREATER OF THE
2. LIVE LOAD (LL) OVERALL THICKNESS OF COLUMN, 61 THE CLEAR HEIGHT OF COLUMN OR 450mm.
FOUNDATION - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 24 HRS
DECK ROOF - - - - - - - - - - - - - - - - - - - - - - - - - - 1.92 KN/m3 (40 pcf) 14. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF
SUSPENDED SLAB EXCEPT WHEN
STAIRS - - - - - - - - - - - - - - - - - - - - - - - - - - 4.78 KN/m3 (100 pcf) CONCRETE CAST MONOLITHICALLY WITH THE CORE WITH THE MAXIMUM
ADDITIONAL LOADS ARE IMPOSED - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 DAYS
WALLS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 21 DAYS THICKNESS OF 40mm AND NOT LESS THAN 40 TIMES THE MAXIMUM SIZE OF
3. WIND LOAD (WL) COARSE AGGREGATE IN MILLIMETERS.
COLUMN - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 21 DAYS
p = CaCq 1 qs 15. WHERE COLUMNS CHANGE IN SIZE, VERTICAL REINFORCEMENTS SHALL BE
ch = HEIGHT CORRECTION FACTOR OFFSET AT A SLOPE OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF
q = WIND VELOCITY PRESSURE SHALL BE PROVIDED THRU OUT THE OFFSET REGION.
THE CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST FOUR (4) DAYS
c = SHAPE COEFFICIENT (AS PER NSCP)
PRIOR TO THE POURING FOR APPROVAL.
V = VELOCITY OF WIND 16. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR COLUMN
9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS SHORINGS UNTIL REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN
4. SEISMIC LOAD (FOR BUILDING STRUCTURES) HEIGHT, AND THE SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR DIAMETERS.
THE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH.
BASE SHEAR: V=ZIC ; C = 1.25S WELDING OR APPROVED MECHANICAL DEVICES MAY BE USED PROVIDED THAT
RW W (T) 34 10. BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER NOT MORE THAN ALTERNATE BARS ARE WELDED OR MECHANICALLY SPLICED
Z = 0.40 PLACEMENT OF ALL OPENING, SLEEVES, CURBS, CONDUITS ETC. RELATING TO THE WORK. AT ANY LEVELS AND THE VERTICAL DISTANCES BETWEEN THESE WELDS OR
R = 10 (SPECIAL MOMENT RESISTING FRAME) SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.
S = 1.0

BASE SHEAR: V = 0.7 CW

A. BASIC ALLOWABLE STRESSES ARE INCREASED BY 33% FOR COMBINED

(DL+LL+EL) OR (DL+LL+WL)

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 7
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
GENERAL NOTES (3) PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
G E N E R A L N O T E S
1. GENERAL MINIMUM REINFORCING LAP SPLICE AND BEND V. ELECTRICAL NOTES
1. THESE NOTES SHALL APPLY UNLESS SPECIFICALLY OTHERWISE INDICATED IN
THE PLANS, IN CASE OF CONFLICT BETWEEN PLANS AND SPECIFICATION, A OR G 4. THE ELECTRICAL SYSTEM SHALL HAVE A GROUND RESISTANCE NOT EXCEEDING 5
BAR LAP BEND Ø OHMS.
SPECIFICATION SHALL GOVERN. SIZE (cm) (mm)
2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE NOTED IN THE PLANS, 180° 90° 5. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER
3. ALL ELEVATION ARE IN METERS UNLESS OTHERWISE NOTED IN THE PLANS. APPURTENANCES FOR THE ENTIRE ELECTRICAL INSTALLATION SHALL BE USED.
DETAILING HOOK 6. ALL MATERIALS USED AND INSTALLED SHALL BE BRAND NEW AND OF THE
4. ALL DIMENSIONS AND ELEVATION SHOWN IN THE PLANS SHALL BE VERIFIED D10 30 57 13 13 DIMENSIONS A OR G APPROVED TYPE FOR THE LOCATION AND PURPOSE.
BEFORE COMMENCEMENT OF THE WORKS.
5. ALL DIMENSIONS, ELEVATIONS AND LOCATION OF OPENING RELATED TO THE 180° 7. SOLAR CONTRACTOR SHALL PROVIDE FINAL QUANTITY AND RATING OF SOLAR
D12 45 76 15 18
EQUIPMENT ARE TENTATIVE AND SUBJECT TO CHANGE AFTER THE EQUIPMENT BEND PANEL (PHOTOVOLTAIC PANEL), SOLAR CHARGE CONTROLLERS, BATTERIES, AND
DIMENSIONS HAVE BEEN ESTABLISHED. D INVERTERS BASED ON ACTUAL ROOF AND SITE ORIENTATION AND SPACES
D16 53 95 18 23
1.8. SOLAR CONTRACTOR SHALL PROVIDE FINAL DRAWINGS, SHOP SPECIFICATIONS
AND OTHER RELATED DOCUMENTS FOR SOLAR POWER SYSTEM
D20 61 114 20 25
II. DESIGN CRITERIA AND SPECIFICATIONS 1.9. DESIGN OF DISTRIBUTION SYSTEM IS NOT INCLUDED IN THIS STANDARD PLAN AS IT
VARIES DEPENDING ON THE SITE LOCATION.
D25 76 152 25 36 1.10. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE
1. DPWH DESIGN GUIDELINES, CRITERIA, AND STANDARDS (DGCS)-VOLUME 3
DETAILING SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
2015 EDITION DIMENSIONS A OR G
D28 91 229 31 41
2. DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES, AND AIRPORTS-
90°
VOLUME II, LATEST EDITION
3. DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES
D32 99 260 33 46 BEND VI. SOLAR PANELS
D
(BUILDINGS, PORTS AND HARBORS, FLOOD CONTROL AND DRAINAGE
D36 1. BASIC WIND VELOCITY IN THE DESIGN V=250 kph
STRUCTURES AND WATER SUPPLY SYSTEMS)-VOLUME III, 2019 EDITION 114 285 36 51
2. SOLAR PANEL ORIENTATION SHALL GENERALLY BE FACING SOUTH FOR MAXIMUM
4. RURAL WATER SUPPLY VOLUME I DESIGN MANUAL.
OUTPUT OF POWER BUT OPTIMUM RADIATION EXPOSURE SHALL BE CONSIDERED
5. PHILIPPINE SOCIETY OF MECHANICAL ENGINEERING CODE.
AT ALL TIMES BASED ON PROJECT LOCATION.
6. PHILIPPINE ELECTRICAL CODE. 3. STRUCTURAL STEEL 3. SOLAR PANEL MODULES SHALL BE OF MONO CRYSTALLINE OR
7. NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, VOLUME I (BUILDING,
POLY-CRYSTALLINE TYPE.
TOWERS AND OTHER VERTICAL STRUCTURES) 7TH EDITION 2015.(NSCP)
3.1 ALL STRUCTURAL MILL SECTIONS AND BUILT UP PLATE SECTIONS SHALL BE 4. ALL ROOF PENETRATIONS SHALL BE SEALED WITH A HIGH PERFORMANCE ROOF
DESIGNED IN ACCORDING WITH AISC'S LATEST SPECIFICATION FOR THE DESIGN, SEALANT.
FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS. 5. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING,
3.2 DESIGN LOADS SHALL MEET THE REQUIRED STRUCTURAL DESIGN CRITERIA. MECHANICAL, OR BUILDING ROOF VENTILATION.
III. CIVIL AND STRUCTURAL DESIGN 3.3 STEEL PLATES, SHAPES, BARS, AND METAL FABRICATIONS: ASTM A-36, ASTM 6. APPROPRIATE CAUTION AND WARNING ELECTRICAL SIGNS AND SIGNAGES SHALL
A-325, GALVANIZED. 7 8Ø AND BELOW. BE POSTED AT CONSPICUOUS LOCATION AT THE SITE.
1. REINFORCED CONCRETE

SCHEDULE OF STRUCTURAL CONCRETE


IV. MECHANICAL NOTES VII. AQUIFER/ PUMP WELL
28-DAY 1. ALL MECHANICAL WORKS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF 1. THE LOCATION AND DEPTH OF WELL SHALL BE BASED ON GEO-RESISTIVITY SURVEY.
STRUCTURAL COMPRESSIVE DENSITY MAX SLUMP THE PHILIPPINE MECHANICAL ENGINEERING CODE. 2. THE DESIGNER SHALL CONDUCT A PUMPING (''SAFE YIELD'') TEST AT LEAST EQUAL
LOCATION
ELEMENTS STRENGTH 2. THE TOTAL SCOPE OF WORKS SHALL INCLUDE ALL WORKS DESCRIBED IN PLANS AND TO THE SYSTEM PEAK DEMAND AND OPERATE IT FOR 24-48 HOURS.
LISTED IN TECHNICAL SPECIFICATIONS FOR MECHANICAL WORKS. 3. WELL DRILLING WILL COMMENCE UPON SECURING OF DRILLING PERMIT FROM THE
3. THE WORK SHALL BE EXECUTED IN CLOSE COORDINATION WITH OTHER TRADES. NWRB AND MUST BE CONTRACTED TO AN EXPERIENCED AND COMPETENT WELL
FOOTINGS,
FOUNDATION 4. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, TECHNICAL DATA/SPECIFICATION DRILLING COMPANY DULY ACCREDITED BY THE NWRB.
WALL 3000 PSI= 21 MPg 24 KPo 4"(100 mm)
(BROCHURESACATALOGUE) SUBJCT FOR FURTHER TECHNICAL EVALUATION OF THE 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WELL HEAD PROTECTION TO
FOOTINGS
CONCERNED AUTHORITY PRIOR TO PROCUREMENT/INSTALLATION OF THE PROVIDE SEAL FROM LEAKAGE AND RUNOFF ENTERING THE WELL HEAD.
SLAB, BEAMS EQUIPMENT/UNIT.
5. PROVIDE SEISMIC RESTRAINTS FOR ALL RIGIDLY & RESIUENTLY SUPP0RTED
GROUND COLUMNS, RAMPS 3000 PSI= 21 MPg 24 KPo 4"(100 mm) EQUIPMENT FOR APPLICABLE CODE & AS SPECIFIED DESIGN & PROVIDE RESTRAINTS
TO ROOF R.C. WALLS
FOR PUMPS, FANS, TANKS, ALL PIPING WORKS, GENERATORS ENGINE EXHAUST PIPES VIII. ABBREVIATIONS
RETAINING WALLS
ETC. RESTRAINTS SHALL BE DESIGNED TO PREVENT PERMANENT DISPLACEMENT IN
ANY DIRECTION CAUSE BY LATERAL MOTION. BOTT. BARS BOTTOM BARS m METERS
SLAB ON GRADE 2500 PSI= 17.24 MPg 24 KPo 4"(100 mm)
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING AND COMMISSIONING C COLUMN mm MILLIMETER
OF ALL EQUIPMENT INSTALLED.
C.H.B. CONCRETE HOLLOW BLOCK ND NOMINAL DIAMETER
7. PROVIDE PIPE SLEEVES FOR ALL PIPING PASSING THROUGH BUILDING STRUCTURES.
1.1 LOCATION OF ALL CONSTRUCTION OR COLD JOINTS MUST BE APPROVED 8. PROVIDE GUIDES, HANGER AND SUPPLEMENTAL SUPPORT STEEL FOR ALL PIPING. cm CENTIMETER N NORTH
BY THE ENGINEER. 9. ALL STEEL PIPE SUPPORTS SHALL BE PHOSPHATED PRIOR TO APPLICATION OF TWO DWG DRAWING NGL NATURAL GRADE LEVEL
1.2 REINFORCING BARS, ANCHOR BOLTS, AND OTHER INSERTS SHALL BE COATS OF RED LEAD AND A COAT OF ENAMEL PAINT FOR FINISHING. D DOOR NTS NOT TO SCALE
SECURE IN PLACE BEFORE POURING CONCRETE, BAR PLACEMENT AND 10. THE QUANTITY OF EACH EQUIPMENT INDICATED IN THE SCHEDULE IS FOR GUIDANCE
SUPPORTS SHALL BE IN ACCORDANCE WITH THE RECOMMENDED ACL ONLY, FOR QUANTITY TAKE OFF COUNT THE NUMBER OF UNITS IN THE PLANS. DS DOWNSPOUT PV PHOTOVOLTAIC
PRACTICE 11. ALL MECHANICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE EA EACH R.C. REINFORCE CONCRETE
SUPERVISION OF A DULY REGISTERED MECHANICAL ENGINEER. E.F EACH FACE STD STANDARD
2. REINFORCED CONCRETE E.W EACH WAY STL STEEL
SCHEDULE OF STRUCTURAL CONCRETE V. ELECTRICAL NOTES EL. ELEV ELEVATION t. THK THICKNESS
FLR FLOOR TDH TOTAL DYNAMIC HEAD
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE AND IN STRICT COMPLIANCE F.T.G. FOOTING TIE BEAM TYP TYPICAL
DIAMETER OF BARS GRADE (Y) ASTM WITH THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE G.I. GALVANIZED IRON T.B. TOP BAR
(PEC) EXISTING APPLICABLE LAWS, ORDINANCES, REQUIREMENTS, RULES, AND
GRD, GRND GROUND VERT VERTICAL
REGULATIONS OF THE LOCAL GOVERNMENT AND LOCAL POWER COMPANY.
Ø 12 AND SMALLER A615/A615M W/ WITH
GRADE 40 (40,000psi) 2. WHEREVER REQUIRED AND NECESSARY JUNCTION BOXES OR PULL BOXES SHALL BE
DEFORMED HOR HORIZONTAL W/O WITHOUT
INSTALLED AT INCONSPICUOUS LOCATIONS ALTHOUGH SUCH BOXES ARE NOT SHOWN
ON THE PLANS NOR NOR MENTIONED IN THE SPECIFICATIONS. L LENGTH W.P WATER PROOFING
A615/A615M 3. ALL NON-CURRENT CARRYING METAL PARTS/ENCLOSURES OF ELECTRICAL EQUIPMENT
Ø 16 AND LARGER GRADE 40 (40,000psi)
DEFORMED AND OVER CURRENT PROTECTIVE DEVICES SHALL BE PROPERLY GROUNDED IN
ACCORDANCE WITH ARTICLE 2.50 OF THE ELECTRICAL CODE PART 1.2000 EDITION

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 8
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
STRUCTURAL NOTES PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
S T R U C T U R A L N O T E S

D
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 9
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
STRUCTURAL NOTES (2) PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
0.20

SEE SPOT DETAILS


S1
PLAN

ELEVATION

5 OFFSET PIPE CLAMP


10
4.00
2.00

0.20
0.20 4.00 0.20

6 VENT PIPE DETAILS


10

3 64 cu.m CAPACITY SQUARE TANK


10

65 mm Ø G.I. PIPE AIR VENT


4 WATER LEVEL INDICATOR DEETAIL
0.20 4.00 0.20
10 PLAN
12mm Ø SPACED @ .20 BOTHWAYS

0.20
MH
7 OVERFLOW PIPE DETAILS
0.45
10
CT-BL CT-BL
SEE TOP BLOW-UP DETAIL

2-16mm Ø VERT. BARS SPACED @ .30M O.C.

CEMENTITIOUS WATER PROOFING (APPLIED)

65 mmØ G.I. PIPE


INLET PIPE
12mm Ø HOR. BARS STAGGERED
SPACED @ .20M O.C. AT BOTH FACE
4.00
NGL. 65 mm Ø G.I. PIPE OVERFLOW

150mm RIB TYPE PVC


WATERSTOP

2.00
75 mm Ø G.I. PIPE DISTRIBUTION LINE

1.50
16mm Ø HOR. BAR
12mm Ø HOR. BAR SPACED @ .20M O.C.
SPACED @ .20 O.C.
0.20

75 mm Ø G.I. PIPE DRAIN PIPE


0.45
15O mm Ø PVC SUPPORT

0.30 75 mm Ø DRAIN PIPE


0.80 0.80
SEE DRAIN BOX BLOW-UP DETAIL S1
50mm LEAN CONCRETE
SEE TANK FOUNDATION
S
BLOW-UP DETAIL 2
COMPACTED SOIL

ELEVATION

2 CYLINDRICAL TANK ELEVATION VIEW 1 TANK ISOMETRIC VIEW 8 OVERFLOW/DRAIN PIPE DETAILS
10 10 10
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII
C.Y. 2023 PROJECT CYLINDRICAL TANK ELEVATION VIEW, ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /
ISOMETRIC VIEW, WATER LEVEL 10
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON,
INDICATOR DETAILS ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU AND OVERFLOW PIPE DETAILS CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
4.00

4.00
12mm Ø SPACED @
.20M BOTHWAYS

2 SLAB MAIN BAR REINFORCEMENT DETAIL


11
0.20
4.00 0.20

2-16mm Ø MAIN 65 mmØ G.I. PIPE 12mm Ø HOR. BAR STAGGERED


INLET PIPE SPACING @ .20 O.C.
BARS @ 0.30m W/ AT BOTH FACE
12mm Ø HOR. BARS NGL.
SPACED @ 0.20m.
2-16mm Ø VERT. BAR
SPACED @ .30M O.C.

0.30
4.00
12mm Ø SPACED @ .20 BOTHWAYS
12mm Ø HOR. BAR
SPACED @ .20 O.C.
50mm LEAN CONCRETE
FOOTING
0.30
4 -16mm Ø DEFORMED BAR
0.075 0.075
0.80 0.25

3 TANK FOUNDATION BLOW-UP DETAIL S2


11
1 FOUNDATION PLAN
11

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII SLAB MAIN BAR REINFORCEMENT DETAIL ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 11
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
FOUNDATION PLAN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, TANK FOUNDATION BLOW-UP DETAIL ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
65 mm Ø G.I. PIPE OVERFLOW

100mmØ C.I. GATE VALVE,


FLANGE TYPE, NON-RISING

2.00
75 mm Ø G.I. PIPE DISTRIBUTION LINE

1.50

75mmØ C.I. GATE VALVE,


FLANGE TYPE,
NON-RISING

75 mm Ø G.I. PIPE DRAIN PIPE


0.45
15O mm Ø PVC SUPPORT

75 mm Ø REINFORCED
CONCRETE DRAIN PIPE
0.80
CT-BL 65mmØ FABRICATED ELBOW

50mm LEAN CONCRETE


COMPACTED SOIL

2 DRAIN BOX BLOW-UP DETAIL


12

65 mm Ø G.I. PIPE OVERFLOW

100mmØ C.I. GATE VALVE,


FLANGE TYPE, NON-RISING

2.00
0.20 0.20
75 mm Ø G.I. PIPE DISTRIBUTION LINE

1.50
1.60

75mmØ C.I. GATE VALVE,


FLANGE TYPE, NON-RISING

75 mm Ø G.I. PIPE DRAIN PIPE


15O mm Ø PVC SUPPORT
0.30

75 mm Ø REINFORCED 0.20
0.25 0.80 CONCRETE DRAIN PIPE 12mm Ø SPACED @ .20 BOTHWAYS
(SLAB AND WALL)
50mm LEAN CONCRETE
COMPACTED SOIL
3 DRAIN BOX ELEVATION DETAIL
12
1 DRAIN BOX SPOT DETAIL S1
12

REPUBLIC OF THE PHILIPPINES


PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED:
DRAIN BOX ELEVATION
SUBMITTED:
DETAIL
RECOMMENDED: APPROVED: SET NO. SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII DRAIN BOX SPOT DETAIL, ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 12
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
DRAIN BOX BLOW-UP DETAIL PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, DRAIN BOX ELEVATION DETAIL ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
1 WALL REINFORCEMENT DETAILS
13

2 EXTERIOR LADDER RUNG DETAILS 4 MANHOLE DETAILS


13 13

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / EXTERIOR LADDER RUNG DETAILS 13
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
MANHOLE DETAILS PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, WALL REINFORCEMENT DETAILS ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
3.00

3.00
3.00
2.50

3.00

STANDARD ARRAY PV
1 MODULE SUPPORT LAYOUT
14 3.00

STANDARD ARRAY PV SIDE


2 VIEW DOUBLE ROW VERTICAL
14

EDGE PRESSING MEDIUM PRESSURE


BLOCK BLOCK

PV MODULE PV MODULE PV MODULE

0.70 PURLIN PURLIN

EDGE PRESSING BLOCK MEDIUM PRESSURE BLOCK


SOLAR PANEL CONCRETE
3 PEDESTAL DETAILS
14

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII STANDARD ARRAY PV MODULE SUPPORT LAYOUT ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /
STANDARD ARRAY PV SIDE VIEW DOUBLE ROW VERTICAL 14
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER SOLAR PANEL CONCRETE PEDESTAL DETAILS
PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, PRESSING / PRESSURE BLOCK ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
1 2 1 2

1 2

0.50

B B B

0.90

0.30

A A A

0.90

1 FLOOR PLAN 2 FOUNDATION PLAN 3 ROOF FRAMING PLAN 0.90 0.25

15 15 15
0.25

9 COLUMN & FOOTING DETAILS


15
1 2 A B B A
3.50

0.10

0.40

0.25

4 FRONT ELEVATION 5 RIGHTH SIDE ELEVATION 6 LEFT SIDE ELEVATION


15 15 15 0.45

2 1 10 WALL FOOTING DETAILS


0.80
15
0.40

3.00
2.10
varies

7 REAR ELEVATION 8 DOOR & WINDOWS SCHEDULE 11 BEAM DETAILS


15 15 15

REPUBLIC OF THE PHILIPPINES


PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED:
SCHEDULE OF BEAM:
RECOMMENDED: APPROVED: SET NO. SHEET NO.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARA MAE KATRINA Z. SAYAWAN


REGIONAL OFFICE NO. VII
C.Y. 2023 PROJECT FLOOR PLAN, FOUNDATION PLAN, ROOF ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / FRAMING PLAN, ELEVATION VIEW, 15
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON,
COLUMN & FOOTING DETAIL, WALL ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
POBLACION, DALAGUETE, CEBU
PROVINCE OF CEBU FOOTING DETAIL, BEAM DETAIL CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
3.00 PV MODULE

MODULE RAIL

MOUNTING BRACKET

3.00

STEEL C-PURLINS

Ga. 24 CORR. G.I SHEET

2 ON ROOF PV SOLAR PANEL PLAN RAFTER


3.00 16

1 ON ROOF PV SOLAR PANEL PLAN


16

PV MODULE PV MODULE PV MODULE PV MODULE PV MODULE

END CLAMP DETAIL


MID CLAMP DETAIL

PV MODULE ROOF
CONNECTION DETAIL

3 MOUNTING BRACKET DETAILS


16

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ON ROOF PV SOLAR PANEL PLAN ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 16
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
CONNECTION DETAIL PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, MOUNTING BRACKET DETAILS ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
LEGEND: 1 2
-AUTOMATIC AC CIRCUIT BREAKER 20AF, 2P, 240 AUTOMATIC TRANSFER SWITCH
VOLTS,15 AT, IN NEMA 1 ENCLOSURE
ATS
X
-AUTOMATIC DC CIRCUIT BREAKER 20AF, 2P, 240 EXISTING: 3HP,1Ø ,230V,
VOLTS,175 AT, IN NEMA 1 ENCLOSURE 60Hz, AC, SUBMERSIBLE
A MOTOR PUMP
-AUTOMATIC AC CIRCUIT BREAKER 20AF, 2P, 240 LED BULB 18 WATTS
VOLTS,150 AT, IN NEMA 1 ENCLOSURE B
X
B
Sa-b 2-Gang Switch , 10Amps,250 Volts
- 16kw SOLAR HYBRID INVERTER 60Hz
+ -
TAPPED TO SOLAR HYBRID INVERTER
1 PHASE
BATTERY -LiFEPO4 Battery 10.24Kw ,200AH,51.2V A
AC AC
PV BATT IN OUT
+ - + - L N G L N

-AUTOMATIC DC CIRCUIT BREAKER 200AF, 2P,


240 VOLTS,175 AT, IN NEMA 1 ENCLOSURE
C
B

SCHEDULE OF WIRES IN CONDUIT: Sa-b


A
j0- Inverter - Battery (35mm2 Battery Cable)
j1- Solar Panels - Inverter (8mm Solar PV Cable)
j2- Inverter-ATS - Loads (Motor Pumps, etc. (2-22mm2 THW WIRES STRANDED )
2 POWER HOUSE LIGHTING LAYOUT
13
28 PCS OF 600 Watts Solar Monocrystalline Panels 16Kw Solar Hybrid Inverter (Single Phase Loads)

PROVISION FOR NORMAL SUPPLY, GENERATING


SET OR OTHER RENEWABLE ENERGY SOURCE
DC BREAKER AC BREAKER AC BREAKER
j1 j1 PV BATT IN
AC AC
OUT
j2 j2 j2 j2
+ - + - L N G L N

B B
A
ATS

j0 PROVISION ENCLOSED
AUTOMATIC TRANSFER
SWITCH: BREAKER TYPE, PROPOSED: 3HP,1Ø ,230V,
DC BREAKER 60Hz, AC, SUBMERSIBLE
C 200 AMPS,2 POLE, 230V,
10kAIC, NEMA 1 MOTOR PUMP
+ - + - + - + -

BATTERY BATTERY BATTERY BATTERY


1 SINGLE LINE DIAGRAM LiFEPO4 Battery 10.24Kw ,200AH,51.2V
13 BATTERY BANK
(ALL PARALLEL)
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII (SET UP 1) SINGLE LINE DIAGRAM ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 17
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
POWER HOUSE LIGHTING LAYOUT PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, SCHEDULE OF WIRES IN CONDUIT ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
LEGEND: 1 2
-AUTOMATIC AC CIRCUIT BREAKER 20AF, 2P, 240 AUTOMATIC TRANSFER SWITCH
VOLTS,15 AT, IN NEMA 1 ENCLOSURE
ATS
X
-AUTOMATIC DC CIRCUIT BREAKER 20AF, 2P, 240 EXISTING: 3HP,1Ø ,230V,
VOLTS,125 AT, IN NEMA 1 ENCLOSURE 60Hz, AC, SUBMERSIBLE
A MOTOR PUMP
-AUTOMATIC AC CIRCUIT BREAKER 20AF, 2P, 240 LED BULB 18 WATTS
VOLTS,150 AT, IN NEMA 1 ENCLOSURE
B
B
Sa-b 2-Gang Switch , 10Amps,250 Volts
X

- 16kw SOLAR HYBRID INVERTER 60Hz


+ -
1 PHASE
BATTERY -LiFEPO4 Battery 10.24Kw ,200AH,51.2V TAPPED TO SOLAR HYBRID INVERTER
AC AC
PV BATT IN
+ - + - L N G L
OUT
N
A

-AUTOMATIC DC CIRCUIT BREAKER 200AF, 2P,


240 VOLTS,175 AT, IN NEMA 1 ENCLOSURE
C
B

SCHEDULE OF WIRES IN CONDUIT: Sa-b


A
j0- Inverter - Battery (35mm2 Battery Cable)
j1- Solar Panels - Inverter (8mm Solar PV Cable)
j2- Inverter-ATS - Loads (Motor Pumps, etc. (2-22mm2 THW WIRES STRANDED )
2 POWER HOUSE LIGHTING LAYOUT
13
28 PCS OF 600 Watts Solar Monocrystalline Panels 16Kw Solar Hybrid Inverter (1-Phase)

PROVISION FOR NORMAL SUPPLY, GENERATING


SET OR OTHER RENEWABLE ENERGY SOURCE
DC BREAKER AC BREAKER AC BREAKER
j1 j1 AC AC
j2 j2 j2 j2
PV BATT IN OUT
+ - + - L N G L N

B B
A
ATS

j0 PROVISION ENCLOSED
AUTOMATIC TRANSFER
DC BREAKER SWITCH: BREAKER TYPE, EXISTING: 3HP,1Ø ,230V,
C 200 AMPS,2 POLE, 230V, 60Hz, AC, SUBMERSIBLE
10kAIC, NEMA 1 MOTOR PUMP
+ - + - + - + -

BATTERY BATTERY BATTERY BATTERY

1 SINGLE LINE DIAGRAM LiFEPO4 Battery 10.24Kw ,200AH,51.2V


13 BATTERY BANK
(ALL PARALLEL)
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII (SET UP 2) SINGLE LINE DIAGRAM ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 18
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
POWER HOUSE LIGHTING LAYOUT PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, SCHEDULE OF WIRES IN CONDUIT ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
BACK - UP & QUANTITY CAL C ULATION

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / 19
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
BACK - UP AND QUANTITY CALCULATION PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON, ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
BILL OF MATERIALS
DESCRIPTION UNIT QTY
CONCRETE m³ 1.75
Ø10mm REINFORCED STEEL BAR kg 75.00
GAUGE 26 CORRUGATED ROOFING GAUGE 26 CORRUGATED ROOFING 4" X 4" LUMBER bd.ft 10.67
WITH ROOF INSULATION WITH ROOF INSULATION
4-2" X 2" GOOD LUMBER SPACED @ 2" X 2" GOOD LUMBER bd.ft 2.67
8 - 2" X 2" GOOD LUMBER PURLINS
EVERY 1.20M O.C.
SPACED @ EVERY 500MM O.C. 4'x8'x21" ORDINARY PLYWOOD pcs. 24
2" X 2" GOOD LUMBER GA 26 CORRUGATED G.I. SHEET m² 9
ORDINARY FLASHING GA. 24 (0.701MM) X 2.44 MM lm 27
300

300
INSULATION FOAM lm 4
UMBRELLA NAILS/ TEK SCREW/ J-BOLT kg 1.05
2" x 2" GOOD LUMBER
CONCRETE NAILS #4 kg 1
2" x 2" GOOD
LUMBER COMMON NAILS #3 kg 0.25
2400

2400

2400
1"
ORDINARY
3300

3300
PLYWOOD 2 BOTH SIDE COMMON NAILS #4 kg 1

3000
2" X 2" GOOD LUMBER FRAME
JALOUSIE WINDOW 500X1200 m² 1.20
DOOR LOCKSET set 1
F.G.L. F.G.L.
N.G.L.
600

600

600
150

FRONT VIEW RIGHT SIDE VIEW

3600 4" X 4" GOOD


1600
100MM X 100MM LUMBER POST
2" x 2" GOOD LUMBER 800
GOOD LUMBER
POST
100MM THK.
FLOORING

37.6533
800
2" x 2" GOOD LUMBER
2400

150
1600 1 -10MM Ø RSB
4-10MM Ø VERTICAL BAsmS
3-10MM Ø STIRRUPS
N.G.L. W1 W1 D1
600
600

PLAN SECTION
150

10MM Ø AT 600MM O.C.

BACK VIEW FLOOR PLAN


BOTH WAYS DETAIL OF POST

DEMOUNTABLE PROJECT ENGINEER'S FIELD OFFICE


SCALE: NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /
DEMOUNTABLE PROJECT ENGINEER'S 20
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON,
FIELD OFFICE ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE:
2440

210
80 210 210 80
50 50

50
DISPLAY AREA
210

50 X 50 HORIZONTAL
COCO LUMBER
DISPLAY AREA

1220
50

(1200 X 2400 X 12 MARINE


20

THIS IS WHERE YOUR TAXES GO


60

FLYWOOD)
50

NAME OF PROJECT: 50 X 50 WOODEN STAKE


50 60

50 X 75 VERTICAL
COCO LUMBER
50

1000
LOCATION:
1220

30 30 30 30 30 30 30

E.G.L.
50

NAME OF CONTRACTOR:

500
50

DATE STARTED:
50

CONTRACT COMPLETION DATE: 1000 2440


50 50 50

CONTRACT COST:
IMPLEMENTING OFFICE : TYPICAL FRAME ELEVATION FRONT ELEVATION

SOURCES OF FUND:
20

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


20
20

TEXT 2920 or call (02)165-02 for any concern on this project


20
20

www,dpwh.gov.ph
10

1 STANDARD DPWH PROJECT BILLBOARD


SCALE: NTS

2400

BILLBOARD
2400
COMMISSION ON AUDIT (PROVINCE AND CITY)

DISPLAY AREA
45° Project: Cost: (TARPAULIN ON 2400 X
2400 X 5 MARINE
EDGE OF ROAD Fund Source: PLYWOOD)
Location:

2400
WHITE BACKGROUND
BLACK TEXT 50 X 50 HORIZONTAL
TRAFFIC DIRECTION COCO LUMBER
Implementing Agency:
ROAD
HELVETICA 3"
Development Partner:
BILLBOARD ORIENTATION

2400
Contractor/Supplier:
Brief Description of Project: 50 X 50

1000
WOODEN STAKE 50 X 75 VERTICAL
COCO LUMBER
Project Details:
E.G.L.
Project Date Project Status

500
Target Date of Percentage of As of Cost Incurred Date Remarks
Duration Started Completion Completion to Date
(Date) Completed
HELVETICA 1"
1000 2400

For Particulars or complaints about this project, please contact the Regional Office or Cluster which has audit jurisdiction on this project.
TYPICAL FRAME ELEVATION FRONT ELEVATION
HELVETICA 1" COA Regional Office No./Cluster: _______________________________
Address: ___________________________________________________
Contact No.: _____________________ or Text COA Citizen's Desk at 0915-539-1957

2 STANDARD COA PROJECT BILLBOARD


SCALE: NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT ARA MAE KATRINA Z. SAYAWAN
REGIONAL OFFICE NO. VII ENGINEER II
DETAILED ENGINEERING PLAN FOR
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /
STANDARD DPWH PROJECT BILLBOARD 21
CEBU 4TH DISTRICT ENG'G OFFICE REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN PREPARED: KEVIN JOSHUA A. TAMANAHA LENARD A. PANUGALINOG NORLANDO P. MANALO MA. CHYMBELIN D. IBAL
POBLACION, DALAGUETE, CEBU
WATER COLLECTORS SYSTEMS, CONSTRUCTION OF SOLAR WATER
SYSTEM, BARANGAY EL PARDO, MUNICIPALITY OF BOLJOON,
STANDARD COA PROJECT BILLBOARD ENGINEER II OIC - CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 21
PROVINCE OF CEBU CHRISTIAN JAHWEH S. SABADO
ENGINEER II DATE: DATE: DATE: DATE: