PROYEK :
FINISH GOOD & IPAL
DUA KELINCI - PATI
MEP OUTLINE
I. MECHANICAL WORK
1. VAC
2. PLUMBING
3. FIRE PROTECTION
III. IPAL
PLUMBING
ESKE - ME Page |2
MEP OUTLINE
I. MECHANICAL WORK
1. VAC (Ventilation and Air Conditioning)
a. Ventilation
- Mechanical Fan (Fresh Air & Exhaust)
b. Air Conditioning
- Split air conditioning
- Piping & Drain
2. PLUMBING
a. Clean water distribution
- Piping distribution
b. Waste water
- STP
- Piping distribution
3. FIRE PROTECTION
a. FIRE HYDRANT
- Pump & Accessories (By Existing)
- Piping distribution
b. FIRE SPRINKLER
- Tapping from hydrant line
- Piping distribution
- Control cable to JB-FA
c. FIRE EXTINGUISHER
ESKE - ME Page |3
MEP OUTLINE
2. FIRE ALARM
- Main Control
- Fire alarm detector installation
- JB-FA
III. IPAL
1. PLUMBING
ESKE - ME Page |4
MEP OUTLINE
I. MECHANICAL WORK
1. VAC : 0%
2. PLUMBING : 0%
3. FIRE PROTECTION : 0%
III. IPAL
1. PLUMBING
- Pompa : 50%
- Fan : 0%
2. VERTICAL TRANSPORTATION
1. LIFT BARANG : 0%
ESKE - ME Page |5