SULUT -1 (2x50 MW)

CFSPP Project
MANUFACTURE DATA RECORD
UNINTERRUPTIBLE POWER SYSTEM (UPS)
SECTION CONTENT LIST
COVER MDR UPS
I. Content List
II. ITP UPS
III. Manufacture Certificate
A. Certificate of Manufacture
B. Certificate of Origin
C. Certificate of Warranty

1. Document Review
1.1 UPS Drawing
1.2 Installation Procedure

Incoming Material Inspection


2.
2.1 Material Receiving

Assembling Check
3.
3.1 Visual Inspection
4. Electrical Test
4.1 Applied Voltage Test
4.2 Simulation Function Test
4.3 Light Load Test
4.4 Parallel System Test (if any)
4.5 Alarm Test

5. Documentation During FAT

6. Data Sheet UPS

7. Installation & Manual Use

8. Certificate & Calibaration Tools


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK - A

SECTION 1. DOCUMENT & PROCEDURE


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK - A

1.a. Design and Drawing


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK - A

1.b. WPS and PQR


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.c. Welding Repair Procedure


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.d. Welder Certificate


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.e. NDE Procedure & NDE Personnel Qualification


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.f. Welding Map & NDE Plan


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.g. Fabrication Procedure For Storage Tank


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.h. Dimensional Procedure


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.i. Surface Preparation & Painting Procedure


SULUT -1 (2x50 MW)
CFSPP Project

DEMIN WATER TANK -A

1.j. Inspection and Test Plan (ITP)