You are on page 1of 5

Doc Name: protection of

Excavation& Confined space


NRC 05 Report
Issued Date: 23/10/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Electrical (DB) Inspection and Protection Report

Prepared by: Gohar Ali: HSE Administrator Date Reported: 25/10/2023

Date Conducted: 22/10/2023

MR
Doc Name: protection of
Excavation& Confined space
NRC 05 Report
Issued Date: 23/10/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

PHASE-ONE
SI No. LOCATION Discerption PHOTO

Electrical DB inspection were


carried out in phase one Zone-B by
1 PHASE-1 competent electrical Forman and
provide hard barricade around the
Distribution board.

PHASE-1 Electrical DB inspection were


carried out in phase one Zone-B by
competent electrical Forman and
provide hard barricade around the
Distribution board.

Electrical DB inspection were


carried out in phase one Zone-B by
2 PHASE-1 competent electrical Forman and
provide hard barricade around the
Distribution board

Electrical DB inspection were


carried out in phase one Zone-B
kitchen area by competent
3 PHASE-1
electrical Forman and provide hard
barricade around the Distribution
board

MR
Doc Name: protection of
Excavation& Confined space
NRC 05 Report
Issued Date: 23/10/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Hard barricade has been provide for


4 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provided


5 PHASE-1 for electrical DB to avoid
unauthorized entry

Hard barricade has been provided


6 PHASE-1 for electrical DB to avoid
unauthorized entry

Hard barricade has been provided


7 PHASE-1 for electrical DB to avoid
unauthorized entry

MR
Doc Name: protection of
Excavation& Confined space
NRC 05 Report
Issued Date: 23/10/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Hard barricade has been provided


8 PHASE-1 for electrical DB to avoid
unauthorized entry

Hard barricade has been provide for


9 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provide for


10 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provide for


11 PHASE-1 electrical DB to avoid unauthorized
entry

MR
Doc Name: protection of
Excavation& Confined space
NRC 05 Report
Issued Date: 23/10/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Hard barricade has been provide for


12 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provide for


13 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provide for


14 PHASE-1 electrical DB to avoid unauthorized
entry

Hard barricade has been provide for


15 PHASE-2 electrical DB to avoid unauthorized
entry

MR