You are on page 1of 8

Doc Name: Subcontractor:

NRC 05 Issued Date: 01/12/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

CRANE INSPECTION REPORT

Prepared by: FARUQ AZAM: HSE SUPERVISOR Date Reported: 01/12/2023


Date Conducted: 01/12/2023

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

SI No. LOCATION Description PHOTO

Crane hook inspection carried out


Phase-1
1 in phase-1 by competent rigger
Near Mani store
along with safety officer

Phase-1 Verification of Crane third-party


2
Near Mani store certification

Phase-1 Verification of Rigger third-party


3
Near Mani store certificate

Phase-1 Verification of Rigger third-party


5
Near Mani store certificate

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Phase-2 near Verification of Crane check list by


6
Generator area competent rigging supervisor

Phase-2 near Crane visual inspection conduct by


7
Generator area rigging supervisor

Phase-2 near Ensure crane checklist by safety


8
Generator area officer

Phase-2 near Safety officer ensure mag monthly


9
Generator area color-coding system

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Ensuring of chain sling cuts, cracks,


10 QUARATINE AREA
corrosion, gouges

Safety officer ensuring the ground


11 Phase-3
stability

Verification of web sling total


12 Phase-3
capacity

Verification of web sling total


13 Phase-3 capacity

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Phase- 3 Verification of Crane


14 documentation by competent
rigging supervisor

Verification of Crane lifting gear


Phase-4 certification by competent rigging
15 supervisor

Ensure PTW of crane operation by


16 Phase-4 site HSE lead

Phase-4
Lifting gear inspection were
17
carried out in phase three by
competent rigger

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Visual inspection was carried


Phase-4
out in phase three by
18
competent rigger

Lifting gear inspection were


carried out in phase three by
19 Phase-5D
competent rigger

Visual inspection of crane


20 Phase-5D boom was carried out in phase
three by competent rigger

Phase-5D
Visual inspection of crane
21 boom was carried out in phase
three by competent rigger

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

Lifting supervisor Ensure hydraulic


22 Phase- 5D
system of mobile crane

Phase-5D Lifting supervisor Ensure wire rope


23 of mobile crane

Visual inspection of crane was


Phase-5D
24
carried out in phase three by
competent rigger

MR
Doc Name: Subcontractor:

NRC 05 Issued Date: 22/11/2023

Rev.: 0
HSES DEPARTMENT DOC NO: TR7

MR