HEAVY EQUIPMENT INSPECTION REPORT MONTH OF DECEMBER “2023”

Prepared by: Gohar Ali: HSE Administrator Date Reported: 01/12/2023

Date Conducted: 01/12/2023

MR
Doc Name: Subcontractor:
Heavy equipment inspection
NRC 05 Issued Date: 01/12/2023

Rev.: 0
HSES DEPARTMENT
DOC NO: IR-12

SI No. LOCATION Discerption PHOTO

Excavator inspection carried out in


1 Phase-2
phase phase-2 Laundry area

Grader inspection carried out in


2 Phase-2
phase-2 by area HSE officer

Man lift inspection carried out in


3 Phase-2 phase-2 by area HSE officer along
with supervisor

Man lift inspection carried out in


5 Phase-2 phase-2 by area HSE officer along
with supervisor

MR
Doc Name: Subcontractor:
Heavy equipment inspection
NRC 05 Issued Date: 01/12/2023

Rev.: 0
HSES DEPARTMENT
DOC NO: IR-12

Man lift inspection carried out in


6 Phase-2
phase-2

Skid Loader inspection carried out


7 Phase-2
in phase-2 by area HSE officer

Man lift inspection carried out in


8 Phase-2
phase-2 in Laundry area

Telehandler inspection carried out


9 Phase-2
in phase-2 by area HSE officer

MR
Doc Name: Subcontractor:
Heavy equipment inspection
NRC 05 Issued Date: 01/12/2023

Rev.: 0
HSES DEPARTMENT
DOC NO: IR-12

Wheel loader inspection carried out


10 Phase-3
in phase-3 by area HSE officer

Roller compactor inspection carried


11 Phase-3
out in phase-3 by area HSE officer

Excavator inspection carried out in


12 Phase-3
phase-3 by area HSE officer

Man lift inspection carried out in


13 Phase-2
phase-2 by area HSE officer

MR
Doc Name: Subcontractor:
Heavy equipment inspection
NRC 05 Issued Date: 01/12/2023

Rev.: 0
HSES DEPARTMENT
DOC NO: IR-12

Grader inspection carried out in


14 Phase-2
phase-2 by area HSE officer

Boom truck inspection carried out


15 Phase-4
in phase- by area HSE officer

Mini excavator inspection carried


16 Phase-4
out in phase- by area HSE officer

Loader inspection carried out in


17 Phase-5
phase- by area HSE officer