You are on page 1of 4

Emerson Process Management

Fire and gas detection system layout – LER for Pig


Launcher

[GAS1-4512133037-E10-0006]

Document Revision: 05
Security Classification: Restricted

Vendor shall ensure that


documents have been Created: T. Barisec Checked: V. Brzic Approved I. Vukoja
fully checked and
approved prior to Date: 24-Nov-14 Date: 24-Nov-14 Date: 24-Nov-14
submittal

PROJECT TITLE: SIPD MAJNOON


CLIENT NAME: SHELL IRAQ PETROLEUM
SUPPLIER NAME: EMERSON FZE
PROJECT NO: 1-14-59000/999 PROJECT LOCATION: READING / DUBAI
PO NO: 59001/CUK014 CLIENT ORDER NO:
REQ NO: 59002-1617A/01
TAG NOS:

SUPPDOCNO: FDETEC01-SIPDEB-LER1
CLDOCNO: GAS1-4512133037-E10-0006
DOC TYPE: D69 SUPPLIER REV: 05
DSN: 1093 FW REV: 5
Status: Code 4
Signed: David Smith (H9865)
Dept: 0153-Engineering (General)
Date: 02/Dec/2014
COMMENT STATUS CODE: 1-Rejected; 2-Comments as Noted;
3-Minor Comments Acceptable; 4-No Comments; 5-Info Only
Fire and gas detection system layout –
LER for Pig Launcher 2 (3)
Pripremio (ili za predmet odgovoran) - Prepared (also subject responsible if other) Document name

ENP/HR T. Barisec FDETEC01-SIPDEB-LER1


Odgovoran/Odobrio - Doc Kontrolirao - Checked Datum – Date Rev File
respons/Approved
ENP/HR (V. Brzic) ENP/HR (I. Vukoja) 2014-11-24 PA5 GAS1-4512133037-E10-0006

Customer: Shell Iraq Petroleum Development

Building: Local Equipment Room for Pig Launcher


Project: Majnoon FCP Gas Project
Location: Iraq

Fire and gas detection system layout – LER for Pig Launcher

AUTHORISATIONS NAME FUNCTION SIGNATURE

Developed by: Tomislav Barišec Electrical Engineer

Reviewed by: Vedran Brzić Lead Project Engineer

Released by: Ivan Vukoja Project Manager

Created by: Emerson, d.o.o.

Zagreb, 24.11.2014.
Fire and gas detection system layout –
LER for Pig Launcher 3 (3)
Pripremio (ili za predmet odgovoran) - Prepared (also subject responsible if other) Document name

ENP/HR T. Barisec FDETEC01-SIPDEB-LER1


Odgovoran/Odobrio - Doc Kontrolirao - Checked Datum – Date Rev File
respons/Approved
ENP/HR (V. Brzic) ENP/HR (I. Vukoja) 2014-11-24 PA5 GAS1-4512133037-E10-0006

REVISION HISTORY
DEVELOPED REVIEWED
REV STATUS DESCRIPTION DATE
BY BY
Issued for
01 New document issued 23.07.2014 Ivan Nedić Vedran Brzić
review
Reissued Tags changed according to Shell
02 14.08.2014 Ivan Nedić Vedran Brzić
for review numbering specification
Equipment tag names changed in
Reissued Tomislav
03 accordance with customer comments on 30.10.2014 Vedran Brzić
for review Barišec
Block diagram
FLASHING BEACONS amber & blue
Tomislav
04 AS BUILT not installed but they are delivered 18.11.2014 Vedran Brzić
Barišec
(as spare)

H2 changed position in Battery room Tomislav


05 AS BUILT 24.11.2014 Vedran Brzić
Barišec
Reproduction, distribution or unauthorized use of this document or any parts within this document are forbidden without the written consent of Emerson.

20123-MCP-604 20123-MCP-603

20123-TGD-631 Ex
This document and the contents herein are confidential and the sole property of Emerson.

20123-GD-633

H2

IS IS

IS IS

20123-GD-634
20123-TGD-632 20123-SD-611 20123-SD-613 20123-SD-612 20123-SD-614

Ex Ex Ex

20123-AHA-625 20123-VHA-621

20123-VHA-626

20123-AHA-624

2012

Notes: * FLASHING BEACON amber & blue Title


not installed but they are delivered Ven
(as spare)
Proj

Clie
References: *GAS1-4512133037-C15-0002
Block Diagram F&G End