Professional Documents
Culture Documents
Balance to
Area Structure Name / Equipment name Scope (MT) Drawing released qty Material Procured Balance to procure Fabricated Dispatched
Sl.no fabricate
1 Main Steel SR-01 1.26 1.26 1.26
2 Main Steel SR-03 0.67 0.67 0.67
3 Main Steel PR -01 (LOT-01) 11 11 11 Fabrication ongoing
4 Main Steel PR -01 (LOT-02) Drawings released Drawings released
5 Main Steel South Pump 004A/B 0.5 0.5 0.5
6 Main Steel Compressor Shelter 7.29 7.3
Remarks
40 MT in
fitup, 35
MT not
started.
( payment
IRN DONE CLEAR FOR Dispatch issue)
Remarks
P.O NO
TOYO TYPE I
TOYO TYPE I
PO . SR.
NO. Area UOM
BOM-421-C-001-
CIRCULAR SQM
532_CIRCULAR
VALVE PIT FOR 421-V-032
AND 421-V-033 (CHEQURED CIRCULAR SQM
PLATE)
421-DR-026A SQM
421-V-011 SQM
(4214-421-V-011 SQM
4213-421-V-003 SQM
4213-421-E-007A/B SQM
4215-421-P-001A SQM
4213-421-V-007 SQM
4215-421-V-031 SQM
4214-421-V-003 SQM
4215-421-V-002 SQM
V-029,P-07AB,Lubricants
shed,k-01421-kt-001,BA-003
(CHQ PLATE)
421-DR-026B SQM
BOM-E-002ABC_623 SQM
4213-421-CH SQM
421-P-004A/B SQM
421-V-004_544 SQM
421-V037_568 SQM
421-V-029 CIRCULAR
SQM
PLATFORM
STRIPPER &
STABLIZATION AREA (421- SQM
V-038) CIRCULAR
STRIPPER &
STABLIZATION AREA (421- SQM
V-040) CIRCULAR
TOTAL
356420-PO-059150-001-01 EPCC-05
6100
1005 DRAWING
7105
Type1(SQ
Type-I Wt. TOE PLATE TOE PLATE
M) PO SR
No of Panels PO SR NO (RM) PO SR Wt. PO. SR.
NO 1.1 &
1.1 & 2.1 NO. 3.1 NO. 3.1
2.1
19
46 57.20 2,692.40
90 59.21 2,787.01
11 6.93 181.01
14 11.06 288.89
35 33.76 881.81
12 5.10 133.21
3 2.28 107.32
7 4.13 194.40
49 29.21 1,374.91
18 15.71 739.47
25 22.15 1,042.60
5 4.59 216.05
5 8.94 420.81
32 21.67 1,020.20
9 7.42 349.07
24 17.84 839.73
14 4.77
36 20.15 526.32
2 5.57
116 81.36 3,829.62
15 12.91 607.67
61 63.13 2,971.53
65 44.47 1,161.56
31 30.40 794.05
40 28.35 740.50
48 48.74 1,273.09
31 19.44 507.77
19 10.55 275.57
Material in
Material
Ready for Final Material under Material
TOTAL given for
Inspection Dispatch Dispatched
Production
Upto
113.52
307.28
14.02.2023
28.55
23.03.2023 1,663.52
18.05.2023 1,222.32
18.05.2023 1,744.50
18.05.2023 119.32
18.05.2023 35.01
18.05.2023 8.66
18.05.2023 3.59
18.05.2023 43.38
18.05.2023 57.20
137.07 25.09.2023
17.84 22.09.2023
565.46
81.36
25.09.2023
25.09.2023
EPCC05-MDR-421-STR-DWG-STRC-0615-01
EPCC05-MDR-421-STR-DWG-STRC-0617-01
EPCC05-MDR-421-STR-DWG-STRC-0619-01
EPCC05-MDR-421-STR-DWG-STRC-0623-01
EPCC05-MDR-421-STR-DWG-STRC-0625-01
EPCC05-MDR-421-STR-DWG-STRC-0627-01
EPCC05-MDR-421-STR-DWG-STRC-0629-01
EPCC05-MDR-421-STR-DWG-STRC-0631-01
EPCC05-MDR-421-STR-DWG-STRC-0633-01
EPCC05-MDR-421-STR-DWG-STRC-0637-01
EPCC05-MDR-421-STR-DWG-STRC-0643-01
EPCC05-MDR-421-STR-DWG-STRC-0645-01
EPCC05-MDR-421-STR-DWG-STRC-0649-01
EPCC05-MDR-421-STR-DWG-STRC-0647-01
EPCC05-MDR-421-STR-DWG-STRC-0657-01