INTERSCHALT steinsohn VDR G4[e]

VDR System – Hardware installation

19/02/16
‐2‐
Summary of yesterday’s training
Regulation, VDR Types & Modules, Installation hints and requierments

19/02/16
‐3‐
Summery Day 1:

Actual VDR requirements:

IEC 61996‐2 & A.163(78) for Simplified VDR

IEC 61996‐2 Ed. 2013 & MSC.333(90) for VDR systems

G4 Generation:
Used until 2014 July 1st as VDR and S‐VDR

Yearly inspection and repair services only

19/02/16
‐4‐
Summery Day 1:

G4[e] Generation:
Used since 2014 July 1st as VDR for refi & installation

Fulfills actual requirements of MSC.333(90) and IEC


61996‐2 Ed. 2 (2013)

Also used as S‐VDR in smaller HW configuration

Most significant changes in regulations:

 Main & Second Radar must be captured


 Primary ECDIS must be captured
 Sensors & Interfaces were added as requirement
(e.g. AIS)
Operator Performance Test

19/02/16
‐5‐
The procedure of installation & service
From order to Certificate

19/02/16
‐6‐
VDR Installation Procedure:

Service order for


installation / service

19/02/16
‐7‐
Service Order for Service / Installation

 Crew or service technician face a problem


with a VDR system

 Costumer contacts either you as local


certified partner or INTERSCHALT as VDR
manufacture

 Decision by costumer for repair or retrofit, if


competitor system or INTERSCHALT VDR
which is obsolete

19/02/16
‐8‐
VDR Installation Procedure:

Job preparation by
INTERSCHALT

Service order for


installation / service

19/02/16
‐9‐
Job preparation by INTERSCHALT

 INTERSCHALT will get in touch with crew for


service preparation / fault finding

 INTERSCHALT provides Guidelines /


Instructions, Service Files (Last configuration
etc.) to you

 INTERSCHALT offers you 24/7 telephone


support by our Support department

19/02/16
‐ 10 ‐
VDR Installation Procedure:

Attendance preparation

Job preparation by
INTERSCHALT

Service order for


installation / service

19/02/16
‐ 11 ‐
Preparation for attendance

Check the service order carefully

Check if all your documents, forms &


software are up to date

Download service related files from


INTERSCHALT FTP (credentials are provided)

Check that all tools are in working order and


good condition

Check that may needed installation material


is available

19/02/16
‐ 12 ‐
VDR Installation Procedure:

Installation / Service

Attendance preparation

Job preparation by
INTERSCHALT

Service order for


installation / service

19/02/16
‐ 13 ‐
Installation / Service

 Carry out VDR installation / service acc.


INTERSCHALT guidelines & instructions

 Take pictures of defective / burned or


damaged parts prior dismantling

 Always check VDR data availability in FRM(s)

 Download configuration sample data and


log files acc. Files to be returned instruction

 Fill out Service Reports carefully:


Unexplained waiting time and labour
without signature will not be paid by
INTERSCHALT

19/02/16
‐ 14 ‐
VDR Installation Procedure:

Installation / Service

Job review by
Attendance preparation
INTERSCHALT

Job preparation by
INTERSCHALT

Service order for


installation / service

19/02/16
‐ 15 ‐
Job review by INTERSCHALT

 Support department will analyse your


uploaded data

 They will store all data in our VDR file


database

 Support will get in touch with you in case of


any detected missing

19/02/16
‐ 16 ‐
VDR Installation Procedure:

Installation / Service

Job review by
Attendance preparation
INTERSCHALT

Job preparation by
Certification
INTERSCHALT

Service order for


installation / service

19/02/16
‐ 17 ‐
VDR Certificate of Compliance

 Support Team will issue CoC if your service


has been reviewed successfully

 Certificate will be valid from date of


commissioning / APT for one year

 Certificate is valid with Acceptance Test /


Survey Report only

19/02/16
‐ 18 ‐
VDR Installation Procedure:

Installation / Service

Job review by
Attendance preparation
INTERSCHALT

Job preparation by
Certification
INTERSCHALT

Service order for Service feedback


installation / service to you

19/02/16
‐ 19 ‐
Service feedback to you:

 VDR support team will give you a feedback


to your performance to improve our quality

 This feedback is used for improvements only


and will be given to you personally

19/02/16
‐ 20 ‐
VDR Installation Procedure:

Installation / Service

Job review by
Attendance preparation
INTERSCHALT

Job preparation by
Certification
INTERSCHALT

Service order for Service feedback


installation / service to you

19/02/16
‐ 21 ‐
Pre Survey for an Installation / Retrofit
Needed information to create project specific documents and delivery

19/02/16
‐ 22 ‐
Pre Survey for an Installation / Retrofit

You may face the situation that you need to


carry out a pre survey.

INTERSCHALT published following


questionnaire to ensure all available
information are available

Actual version is available on USB


Latest version is available on IS FTP

19/02/16
‐ 23 ‐
Standard Documentation for Installation / Retrofit
INTERSCHALT standard documentation

19/02/16
‐ 24 ‐
VDR G4[e]: Project Block View

25
VDR G4[e]: Electrical Drawings

Electrical drawings with terminal list and drawings:

INTERSCHALT will provide preliminary drawings for


installation / retrofit

Technician modifies drawings acc. final VDR


situation

INTERSCHALT will use this modifications to create


final electrical drawings

19/02/16
‐ 26 ‐
VDR G4[e]: Assembly Drawings

Assembly Drawing for main and decentral cabinet:

Preliminary assembly drawings if module mounting


is required aboard.

Technician needs take pictures if assembly situation


need to changed during installation

INTERSCHALT will create final assembly drawing

19/02/16
‐ 27 ‐
VDR G4[e]: Interface list

Interface list with terminal board and detailed signal


information:

Preliminary Interface list based on information


collected by INTERSCHALT project management
department

Changes aboard need to be added by technician

Final Interface list will be provided by INTERSCHALT

19/02/16
‐ 28 ‐
VDR G4[e] System
Installation example – Ferry Peter Pan, January 2015 – Dry Dock Landskrona

19/02/16
‐ 29 ‐
19/02/16
‐ 30 ‐
19/02/16
‐ 31 ‐
19/02/16
‐ 32 ‐
19/02/16
‐ 33 ‐
19/02/16
‐ 34 ‐
19/02/16
‐ 35 ‐
19/02/16
‐ 36 ‐
19/02/16
‐ 37 ‐
19/02/16
‐ 38 ‐
19/02/16
‐ 39 ‐
19/02/16
- 40 -