• https://cptechcenter.org/geotextiles/
• http://www.acpa.org/wp-content/uploads/2018/10/ACPAGeotextileGuideSpec-v1-5.pdf
7 8
4/23/2020
10
AASHTO 93
(software as Can Design: • Utilizes AASHTO 93/86 design
ACPA WinPAS) FREE Industry equations with modifications
Unbonded on Change in Serviceability
Developed Asphalt Overall
Standard Thickness
Method Standard Deviation
Normal Deviate PSI
Log 4.5 1.5
Log ( ESAL) Z R * so 7.35 * Log ( D 1) 0.06
1.624 *10
7
Unbonded on
1
Concrete “Traffic”
( D 1)8.46
11
Modulus of
Rupture Drainage
AASHTOWare Terminal Coefficient
Pavement ME Bonded on Serviceability
Concrete S c' * Cd * ( D 0.75 1.132)
(previously known as (4.22 0.32 * pt ) * Log
0.75 18.42
215.63 * J * D
( Ec / k ) 0.25
DARWin-ME and FREE – FHWA Pooled
MEPDG) Fund TPF-5(165)
Google “BCOA ME” Load Modulus Modulus of
Transfer of Elasticity Subgrade Reaction
4/23/2020
AASHTO 93 AASHTO 93
Bonded on
Concrete
• Bonded Concrete on Concrete (BCOC)
• ܶை ൌ ܶ௨ௗ െ ܶ௧௩
PavementDesigner PavementDesigner
PavementDesigner.org PavementDesigner.org
PavementDesigner.org
BCOA – ME
Can Design:
• FREE Mechanistic – Empirical design tool
Bonded on specifically for Concrete Overlays of Asphalt
Asphalt
• Assumes a partially bonded condition
• Developed at University of Pittsburgh under
FHWA Pooled Fund TPF-5(165)
• Incorporates climatic distresses
• Joint spacing is featured as an input
• Allows for design with synthetic macrofibers
directly
https://www.engineering.pitt.edu/Sub-Sites/Faculty-Subsites/J_Vandenbossche/BCOA-ME/BCOA-ME/
Or google “BCOA ME”
Can Design:
10 x 12 ft
5 to 7 ft 12 x 12 ft
< 4.5 ft 12 x 15 ft
Corner Break Long. & Diag Crack
Trans. Crack
Bonded on
Asphalt
Positive ΔT
Negative ΔT Positive ΔT
4/23/2020
Pavement ME
A.K.A. MEPDG AASHTO 93 vs. ME
Unbonded on
• Failure mechanisms include IRI, Faulting, 1 climate/2 years 1 set of materials
Concrete and Cracking
• SJPCP only includes longitudinal cracking
All climates over 20-50 years New and diverse materials
Bonded on
Concrete • https://me-design.com/MEDesign/
4/23/2020
• Transitions
mixtures
• Focus on project sequencing to • Consider Additional Design Features
accommodate maintenance of • Consider Construction Process
traffic
• Optimized gradation – Tarantula • Create Construction Documents
Curve / Shilstone Chart
• Reduced paste content –
durability and shrinkage Sieve Size
32
4/23/2020
•Cross slope
needs correction EXISTING PAVEMENT
Slope Varies
4/23/2020
38
• https://cptechcenter.org/concrete-overlays/
• https://intrans.iastate.edu/app/uploads/2018/09/overlay_construction_doc_dev_guide_w_cvr.pdf
39
Harmony Road near Fort Collins, CO - 1990
1st Thin Whitetopping Test Section in CO
Concrete Overlays in
Colorado & Wyoming
Angela Folkestad, PE
CO/WY Chapter - ACPA
• 3.5” & 5” thick sections • 18,200 AADT
• Paved Saturday & open Monday • 4% Truck Traffic
• 3,750 psi compressive strength • 105,000 ESALs per year
Condition in 1995
(5 years old)
Project
Location
I-70 West of Grand Junction, CO (near UT) I-70 West of Grand Junction, CO (near UT)
• 12 years RDL – High (in 2019)
• 11,000 ADT
Project
Location
• 4.4 miles long • Built in 2012
• 20-year design life • 6” Concrete overlay
• Mill existing asphalt 0.5” – 4” • 6’ x 6’ Joint spacing
Pikes Peak Parking Lot • 4.5” - 5” overlay Parker Road Corridor • 5” – 6” thickness
at Denver International Airport • 6’ x 6’ joint spacing SE Denver • 6’ x 6’ joint spacing
• 146,000 SY
• Constructed in 2019
US 287 Corridor • Full depth overlays 9” – 12”
• 12’ x 15’ joint spacing US 287 Corridor – SE Colorado
SE Colorado • More than 150 miles of OLs