Berth Scour Protection

Using Concrete Mattress proserve


MARINE CONSTRUCTION ENGINEERS

Sequence of Work

1) Scour Protection Design (by Proserve or others)


(Permanent Works Design)
Visit port, appraise conditions & agree
design parameters.
Design package.
Risk analysis.
Calculations.
General Arrangement and Detail drawings.
Pumping and Mattress Filling Trial
2) Construction System Engineering
(Temporary Works Development)
Agree mattress installation system.
Construction risk analysis.
G.A. and Fabrication drawings.
Installation guide, accessories list.
Temporary works design, filling plan.
Marine quality control system.

3) Submit & Obtain Approval

4) Fabrication
Mattress weaving. Mattress Preparation in Rolls
Fabrication (From stock).
Fabrication (From woven).
Mattress deliveries to site.

5) Site Preparation
Dredging and Toe trench excavation.
Fine bed preparation and level monitoring.
Sonar and diver inspection of prepared bed.
Proserve engineer visits.
Preparation and mix development.
Pumping and mattress filling trial.
Mattress Installation
Site training and induction.
Mattress preparation in rolls.

6) Installation
Wall/ bed preparation and fixings.
Mattress roll out and filling.
Form & check quay wall seal.
Toe trench stone laying and monitoring.
Daily quality control record system.

7) Final Surveys & As Built Record Drawing

Mattress Filling

www.proserveltd.co.uk B124d