Cape Breton University

Laboratory Report

Course #: ELEC-2365L

Process Controls 2
Jessica Dufour
0259164

Date Preformed: March 14, 2023


Lab Period: TUES AM
Partner: Sreedevi Krishnakuar
Wiring

• We wired the Power (left side) by supplying 24V to K1.


• We used a jumper wire over the button.
• We wired the Start/Stop on the (right side)
• We supplied 24V to K2.
Steps we took:

1. Do default configuration on controller.


2. Configure AIM to match transmitter.
3. Do manual Tuning
4. Do auto Tuning

Manual Tunning Results


1 Drain

#1 = PB 30.2%
Ti 7 sec

#2 = PB 28.2%
Ti 6 sec

Manual = PB 30%
Ti 15 sec

Auto Tunning Results


2 Drains
PB 25.5%
Ti 7 sec

( More aggressive )