You are on page 1of 6

DOCUMENT NO REV

BLA-PBP-M-DS-00-001 1

Contract No. 3510005633 Page 1 of 27

DATA SHEET WATER TANK

OFFSITE BUILDING PHASE 1 WORK FOR ACEH BLOCK-A PROJECT

APPROVED FOR CONSTRUCTION

Class 1 X Class 2 Class 3


CONTRACTOR COMPANY
REV DATE PURPOSE
PREP’D CHK’D APP’D APPD’D
1 10 JAN 20 APPROVED FOR CONSTRUCTION JEF JEF AAB
0 28 JUNI 19 ISSUED FOR CONSTRUCTION DED TGR FTR
A 01 MAY 19 ISSUED FOR REVIEW DED TGR FTR

DOCUMENT NO.
PT. PIRIMBILO PERMAI BLA-PBP-M-DS-00-001
DOCUMENT NO :
OFFSITE BUILDING PHASE 1 WORK
FOR ACEH BLOCK-A PROJECT BLA-PBP-M-DS-00-001

Rev. Page 2 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019

REVISION REVISION
PAGE PAGE ATTACHMENT
A B C 0 1 A B C 0 1 A B C 0 1
1 X X - X
2 X X - X
3 X X - X
4 X X - X X
5 X X - X
6 X X - X X
7 - X X

PT. PIRIMBILO PERMAI


DOCUMENT NO :
OFFSITE BUILDING PHASE 1 WORK
FOR ACEH BLOCK-A PROJECT BLA-PBP-M-DS-00-001

Rev. Page 3 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019

RECORD OF REVISION
The revisions listed below have been incorporated in this copy of the document

REV. NO. SECTION PAGE NO. DESCRIPTION OF CHANGES

0 2 8 DELETED ROOF TANK

1 4 ERROR BOOKMARK DEFINED


1 3 6 REPLACE TYPO WORD

1 3 7 DELETE BLANK PAGE

1 3 7 HYDROTEST FULL WATER

PT. PIRIMBILO PERMAI


DOCUMENT NO :
OFFSITE BUILDING PHASE 1 WORK
FOR ACEH BLOCK-A PROJECT BLA-PBP-M-DS-00-001

Rev. Page 4 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019

1. INTRODCUTION
1.1 General
PT. Medco E&P Malaka, henceforth referred as Company, intends to develop Block-A gas
reserves for sales gas supplying to PT Pertamina. The fields of Alur Siwah, Alur Rambong
and Julu Rayeu are to be developed in Block-A. All fields are located in East Aceh Region,
Aceh Province, Indonesia. The project plans to build Alur Siwah Central Processing Plant
to monetize gases from Alur Siwah and Alur Rambong fields. Julu Rayeu gas will be used
for fuel gas supply to Alur Siwah Central Processing Plant and produced water will be
injected to produced water injection wells in Julu Rayeu.

Alur Siwah Central Processing Station (AS CPP) will be designed with capacity to produce
sales gas in the amount of 63.25 BBTUD with associated condensate and produced water.
Gas processing at AS CPP will consist of sweetening (removal of CO2 and H2S),
dehydration and dew point control with the associated utilities and supporting systems. AS
CPP will transport sales gas to PT Pertamina via Pertagas pipeline. The sales gas will be
transported using 10 km pipeline to tie-in point near Jambo Balee Metering Station where
custody meter is to be located. Tie-in point is provided by Pertagas. Condensate production
from AS CPP is to be transported to Point B by trucking.

PT. Pirimbilo Permai (PBP) is awarded for EPC to design and develop utility buildings at
CPP under contract #3510005983 with the project‟s name: „OFFSITE BUILDING PHASE
1 WORK FOR BLOCK-A ACEH‟.

1.2 Scope
This document provides mechanical data sheet for water tank use in the project “Offsite
Building Phase 1 Work For Project Block-A Aceh”.

1.3 Definition

PT. PIRIMBILO PERMAI


DOCUMENT NO :
OFFSITE BUILDING PHASE 1 WORK
FOR ACEH BLOCK-A PROJECT BLA-PBP-M-DS-00-001

Rev. Page 5 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019

The definitions contained in this document are as follows:

PROJECT : Offsite Building Phase 1 Work For Project Block-A Aceh.

COMPANY : PT. MEDCO E&P MALAKA as owner of the PROJECT.

CONTRACTOR : PT. PIRIMBILO PERMAI which is responsible execute the


PROJECT as specified in contract.

SUB CONTRACTOR : The Party (s) that carry out all or part of the design, procurement,
installation and testing of the systems as specified by
CONTRACTOR.

VENDOR/ SUPPLIER : A company providing specific materials or services required for


the construction of the facility.

MIGAS : Representative from Indonesian Goverments which is responsible


for issuing licenses and permits for Oil & Gas facilities.

2. APPLICABLE SPECIFICATION CODES & REFERENCES

References Drawing:
ARS-PBP-M-PI-10-002 P&ID Clean Water Sysem

PT. PIRIMBILO PERMAI


OFFSITE BUILDING PHASE 1 WORK FOR ACEH Doc. No:
BLOCK-A PROJECT BLA-PBP-M-DS-00-001
Rev.0
DATA SHEET WATER TANK
Date: 28 June 2019

3. DATA SHEET WATER TANK


MAIN TANK
1 APPLICABLE SPECIFICATION MANUFACTURER STANDARD
2 SERVICE CLEAN WATER
3 TAG. NO. T-01A/ T-01B
4 REQUIRED 2
DESIGN DATA
5 CAPACITY (L) 12000
6 TANK LENGTH (MM) 5000
7 TANK WIDE (MM) 3000
8 TANK HEIGHT (MM) 2000
9 ROOF THICK. (MM) 6 - 12
10 SHELL THICK. (MM) 6 - 12
11 BOTTOM THICK. (MM) 6 - 12
12 CORROTION ALLOWANCE -
13 HYDROTEST PRESS FULL OF WATER
14 CORROTION ALLOWANCE -
15 CONSTRUCTION KNOCK DOWN (BOLT ON)
MATERIAL
16 ROOF FIBERGLASS PANEL 1M X 1M
17 SHELL FIBERGLASS PANEL 1M X 1M
18 BOTTOM FIBERGLASS PANEL 1M X 1M
19 INTERNAL TANK
SUPPORT BEAM N/A
SKIRT CARBON STEEL (GALVANIZED)
LADDER CARBON STEEL (GALVANIZED)
PLATFORM N/A
LIFTING LUG/ PAD EYES REINFORCED FIBERGLASS
BOLTING CARBON STEEL (GALVANIZED)
20 MANHOLE FIBERGLASS
21 NOZZLE POLYPROPYLENE RANDOM
ESTIMATED WEIGHT
22 EMPTY VTA 300 Kg
23 OPERATING VTA 13000 Kg
24 TEST WEIGHT VTA 13000 Kg

MARK SERVICE SIZE (INCH) RATING SCHEDULE QTY


N1 INLET 2 150 VTA 1
N2 OUTLET 2 150 VTA 1
N3 OVER FLOW 2 150 VTA 1
N4 LEVEL INDICATOR 2 150 VTA 1
MH MANHOLE 24 N/A N/A 1