BLA-PBP-M-DS-00-001 1
DOCUMENT NO.
PT. PIRIMBILO PERMAI BLA-PBP-M-DS-00-001
DOCUMENT NO :
OFFSITE BUILDING PHASE 1 WORK
FOR ACEH BLOCK-A PROJECT BLA-PBP-M-DS-00-001
Rev. Page 2 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019
REVISION REVISION
PAGE PAGE ATTACHMENT
A B C 0 1 A B C 0 1 A B C 0 1
1 X X - X
2 X X - X
3 X X - X
4 X X - X X
5 X X - X
6 X X - X X
7 - X X
Rev. Page 3 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019
RECORD OF REVISION
The revisions listed below have been incorporated in this copy of the document
Rev. Page 4 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019
1. INTRODCUTION
1.1 General
PT. Medco E&P Malaka, henceforth referred as Company, intends to develop Block-A gas
reserves for sales gas supplying to PT Pertamina. The fields of Alur Siwah, Alur Rambong
and Julu Rayeu are to be developed in Block-A. All fields are located in East Aceh Region,
Aceh Province, Indonesia. The project plans to build Alur Siwah Central Processing Plant
to monetize gases from Alur Siwah and Alur Rambong fields. Julu Rayeu gas will be used
for fuel gas supply to Alur Siwah Central Processing Plant and produced water will be
injected to produced water injection wells in Julu Rayeu.
Alur Siwah Central Processing Station (AS CPP) will be designed with capacity to produce
sales gas in the amount of 63.25 BBTUD with associated condensate and produced water.
Gas processing at AS CPP will consist of sweetening (removal of CO2 and H2S),
dehydration and dew point control with the associated utilities and supporting systems. AS
CPP will transport sales gas to PT Pertamina via Pertagas pipeline. The sales gas will be
transported using 10 km pipeline to tie-in point near Jambo Balee Metering Station where
custody meter is to be located. Tie-in point is provided by Pertagas. Condensate production
from AS CPP is to be transported to Point B by trucking.
PT. Pirimbilo Permai (PBP) is awarded for EPC to design and develop utility buildings at
CPP under contract #3510005983 with the project‟s name: „OFFSITE BUILDING PHASE
1 WORK FOR BLOCK-A ACEH‟.
1.2 Scope
This document provides mechanical data sheet for water tank use in the project “Offsite
Building Phase 1 Work For Project Block-A Aceh”.
1.3 Definition
Rev. Page 5 of 5
DATA SHEET WATER TANK 1
DATE : 20 JUNI 2019
SUB CONTRACTOR : The Party (s) that carry out all or part of the design, procurement,
installation and testing of the systems as specified by
CONTRACTOR.
References Drawing:
ARS-PBP-M-PI-10-002 P&ID Clean Water Sysem