You are on page 1of 3

Work Instruction

Department Maintenance
Job WL1 Preventive Maintenance 250h
Date 15\10
Description of Works
Task Change Engine Oil & Oil Filter
Change Fuel Filters (Fuel-Water Separator)
-Equipment Full inspection
Tools Required -torque ratchet wrench
-wrench set
-Hex-Head Screwdriver Bit
-OIL FILTER WRENCH TOOL STRAP BELT WRENCH
Job Sequence
-apply machine isolation use LOTO
-Wear all PPE
-use Oil spill pan
-Unscrew Oil Sump Drain Plug
-
-
-
-
-
-
-
-
-
Risk assessment
Department; Maintenance
Task; Wheel Loader WL1 Preventive maintenance 250h
PM1
Assessment carried out by; Ali Gamil
Date assessment was carried out: 15\10

What are Who What are What Who When is Don


the might you further needs to the action e
hazards? be already action do carry needed
harmed doing to you need to out the by?
and control take to action?
how? the risks? control the
risks?
Oil Leakage All Use a spent Use spill kit All Oil leakage
Technici oil spill pan to control oil Technicia Detected
ans contaminatio ns
n

Risk of Who Use thermal Use oil Maintenan Till finish


burning due changes gloves couplers ce team the process
to hot oil the oil

Starting Anyone Use LOTO Use Separate Maintenan Till finish


machine under the LOTO for all ce team the process
during the WL technician
Job

Signature: Ali Gamil