Professional Documents
Culture Documents
Comments The VLF electrical testing analysis on the cable M75 on phase L2 indicates
thatwith an injection voltage of 24 kVrms (34 kV peak) for 15 minutes,
according to the IEC 60502-2 (2014) standards, there was no arc discharge,
passing thetest. The cable can be energized.