You are on page 1of 1

ELECT.

SIGN D:Galante C:Alecci A1:Santolini A2:Capotos A3:Pesce (30/03/2017)

RELEASED FOR INFORMATION


Checked and released for OE review with
regard to the system requirements and/or main
dimensions and/or the overall arrangement. The
Contractor is responsible for design calculation,
detail dimensions and operability.

AF-Consult Switzerland Ltd

Name/Date: Signature:
For Construction.

Kost, Andreas
2017/09/25 17:19
+0330

MAZ-AEN-01-MBA-PR-PID-003-B.pdf
Approved.

You might also like