Product name Specifications and project unit quantity unit price Total (BDT) Remark
features
electrical works
1 Lighting part
1. Name: LED double tube bracket
Lighting fixtures lamp
1.01 (Lee old) 2. Power: 2*18W Pcs 54.00 -
3. Installation method: wall-
mounted installation
Emergency lighting
(with nickel-
1.02 chromium battery, 2X3W,
LED (with battery, more than
Pcs 11.00 -
safety protection 30min)
cover)
Safety exit
indicator (with 1X3W, LED (with battery, more than
1.03 nickel-chromium 30min) Pcs 2.00 -
battery, safety
protection cover)
Evacuation
indicator (with 1X3W, LED (with battery, more than
1.04 nickel-chromium 30min) Pcs 9.00 -
battery, safety
protection cover)
2. Electric 第 1 页,共 14 页
1. Model and specification: paint
wire slot 300×100×1.2
2. Material: galvanized steel
sheet
3. Type: trough type with cover
3.01 Lacquered
wire 4. Support and hanger: steel
duct 5. Support and hanger rust m 39.00 -
removal: manual removal of light
rust
6. Paint support and hanger: red
lead anti-rust paint twice,
blending paint twice
Plastic coated
3.08 metal hose φ50 m 15.00 -
(including lock)
2. Electric 第 2 页,共 14 页
1. Name: Power Cable
2. Specification: YJV-4*25+1*16mm²
3. Laying method: cable tray
laying 4. Wire rope 25rm NYY
erection (installation of four core +
4.04 power cable tensioning device) m 185.00 - 16rm NYY
5. Installation of support body single core
(clamp, insulator, slot plate,
etc.)
6. Cable terminal head production
7. Signboard production
Electrostatic
5 grounding part
Sum total -
2. Electric 第 3 页,共 14 页
Specifications and project unit price
No. Product name features unit quantity Total (BDT) Remark
Sum total -
3. Internet 第 4 页,共 14 页
No. Product name Specifications and project features unit quantity unit price
HVAC engineering
一 GF HVAC Engineering
(一) HVAC equipment installation works
[Project Features]
1. Name: surround airflow built-in indoor unit
2. Equipment parameters:
Cooling capacity: 14KW
Input power: 190W refrigerant: environmentally
friendly refrigerant, such as R410A, etc.
Circumferenti 3. Other: in line with the design and related
al airflow specifications
1 built-in [Project content] Nos 12.00
indoor unit 1. The body supply and transportation,
installation, commissioning
2. Including the supply and installation of
support hanger
3. Including aerial work costs
4. Including full of snow
5. Including wall opening and repair
[Item Characteristics]
1. Name: Outdoor unit
2. Equipment parameters: Rated cooling
capacity: 168Kw
Rated heating capacity: 168Kw
Power supply: three-phase/380V/50Hz
Refrigerant: R410A
Others: in line with the design and related
The outdoor
2 unit specifications Job 1.00
[Project content]
1. supply and transportation of the main body,
installation and commissioning
2. Including the supply and installation of
support hangers
3. Including aerial work fee
4. Including full of snow
5. Including wall opening and repairing
Subtotal of segments
(二) Air conditioning pipe installation project
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 44.45 (insulation
32mm+tie)
4. Connection method: gas welding
1 Copper tube 5. Others: meet the design and relevant m 28.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 34.93 (insulation
19mm+tie)
4. Connection method: gas welding
2 Copper tube 5. Others: meet the design and relevant m 19.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 28.58 (insulation
19mm+tie)
4. Connection method: gas welding
3 Copper tube 5. Others: meet the design and relevant m 41.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 22.23 (insulation
19mm+tie)
4. Connection method: gas welding
4 Copper tube 5. Others: meet the design and relevant m 29.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 19.05 (insulation
19mm+tie)
4. Connection method: gas welding
5 Copper tube 5. Others: meet the design and relevant m 19.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 15.9 (insulation 19mm+tie)
4. Connection method: gas welding
6 Copper tube 5. Others: meet the design and relevant m 69.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 12.7 (insulation 19mm+tie)
4. Connection method: gas welding
5. Others: meet the design and relevant
7 Copper tube specifications. m 16.00
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: phosphate deoxidized seamless copper
pipe
2. Medium: refrigerant
3. Specification: ∅ 9.5 (insulation 19mm+tie)
4. Connection method: gas welding
5. Others: meet the design and relevant
8 Copper tube m 52.00
specifications.
[inject content]
1. Pipeline supply and installation
2. Fabrication and installation of pipe
fittings 3. Supply and installation of supports
and hangers 4. Pressure test
5. Purging and flushing
[Project characteristics]
1. Name: UPVC condensate pipe
2. Medium: condensate
3. Specification: DN40
4. Connection method: adhesive connection
8. Others: meet the requirements of design and
relevant specifications
[Project content]
UPVC 1. Pipe installation
9 condensate m 33.00
2. Installation of pipe fittings and pipe
pipe clamps 3. Supply and installation of supports
and hangers 4. Water filling and ball passing
test
5. Casing plugging
6. Floor punching
7.13mm rubber insulation
8. Complete all work contents according to
drawings and design specific ations
[Project characteristics]
1. Name: UPVC condensate pipe
2. Medium: condensate
3. Specification: DN32
4. Connection method: adhesive connection
8. Others: meet the requirements of design and
relevant specifications
[Project content]
UPVC
1. Pipe installation
10 condensate m 65.00
pipe 2. Installation of pipe fittings and pipe
clamps 3. Supply and installation of supports
and hangers 4. Water filling and ball passing
test
5. Casing plugging
6. Floor punching
7.13mm rubber insulation
8. Complete all work contents according to
drawings and design specific ations
[Project characteristics]
1. Name: UPVC condensate pipe
2. Medium: condensate
3. Specification: DN25
4. Connection method: adhesive connection
8. Others: meet the requirements of design and
relevant specifications
UPVC [Project content]
11 condensate 1. Pipe installation m 54.00
pipe 2. Installation of pipe fittings and pipe
clamps 3. Supply and installation of supports
and hangers 4. Water filling and ball passing
test
5. Casing plugging
6. Floor punching
7.13mm rubber insulation
8. Complete all work contents according to
drawings and design specific ations
[Item Characteristics]
1. Name: Diverter tube
UPVC 2. Connection method: welding
12 condensate 5. Other: meet the design and specification Nos 11.00
pipe requirements
[Project content]
1. Material supply and installation
[Item Characteristics]
1. Name: R410A Refrigerant
UPVC 5. Other: meet the design and specification
13 condensate KG 90.00
pipe requirements
[Project content]
1. Material supply and installation
[Project Features]
1. Name: Aluminum skin protective layer
2. Material: Aluminum sheet coil material
Aluminum 3. Plate thickness: 0.5mm
14 protective 4. Connection method: bite connection ㎡ 18.00
layer 5. Others: Meet design and specification
requirements
[Project Content]
1. Material supply and installation
Subtotal of segments
Total of HVAC works
Total (BDT) Remark