NAMES WORKDONE QUANTITY

PASTOR 1.block work and hoIl0W filling s.c only 95.31


casting of column base and footing for both
canteen and clinic 27

ALPHA STAFF LOCKER ONLY casting of column base and footing 19


form work@staff locker for column base and
TAIWO footing 51

form work@staff clinic for column base and


footing 23

DAMILARE rebars @ staff locker 0.5


rebars @ staff clinic 0.3

TOTAL
RATE AMOUNT OUTSTANDING BALANCE MONEY GIVEN

700 66,717

2,500 67,500

134,217 -23,500 110,700 30,000

2,500 47,500 -4,000 43,500 30,000

600 30,600

600 13,800
91,900 44,400 15,000
24,000 12,000
24,000 7,200
19,200 19,200
245,317
REMAINING BALANCE

80,700

13,500

29,400

19,200
142,800
NAMES WORK DONE QUANTITY RATE
block wrk and hollow filling
ALFA @staff of
casting locker
short 99.48 600
columns@staff canteen and
staff locker 2.73 2,500
blinding @staff canteen 9.56 2,500
Levelling laterite @staff
canteen and staff locker 372 150

TOTAL
form work for all short
TAIWO columns @staff canteen 10.32 600
form work for all short
columns @staff locker 13.36 600
form work for all short
columns @staFF CLINIC 7 600

TOTAL
Block work and hoilow
KINGSLEY filling n@staff clinic 42.9 600
casting of short columns@
staff clinic 0.8 2,500

TOTAL
DAMILARE last week work
PASTOR PREVIOUS WORKS MONEY

TOTAL MONEY
AMOUNT PREVIOUS BAL TOTAL BALANCE MONEY COLLECTED BALANCE
59,688

6,825
23,900

55,800

146,213 13,500 169,600 20,500 149,100


6,192

8,016

4,200

18,408 29,400 47,700 10,000 37,700


25,740

2,000

27,740 32,500 16,500 16,000


19,200 19,200 5,000 14,200
80,700 80,700 5,000 75,700

292,261 42,900 349,700 57,000 292,700


MONEY GIVEN BALANCE

149,100 PAID OFF

37,700 PAID OFF

16,000 PAID OFF


14,200 PAID OFF
75,700 PAID OFF

292,700
NAME ACTIVITIES
blinding @ staff QUANTITY UNIT RATE AMOUNT
ALFA locker 10.05 m3 2500 25125
casting of floor slab
@ staff canteen 29.5 m3 2500 73750
superstructure(block
wall)@staff
canteen(25% OF the
total sqr meter (230mm
and 150mm) 95.93 m2 600 57558
Mobilization fee Batch B 8000
TOTAL 164433
KINGSLEY blinding@staff clinic 4.8 m3 2500 12000
casting of floor slab
@ staff clinic
Levelling @ staff 13.56 m3 2500 33900
clinic 78.67 m2 150 11800.5
Mobilization fee 6,000
TOTAL 63,701

Form work for slab @


TAIWO staff canteen 9.85 m2 600 5910

Form work for slab @


staff clinic 5.7 m2 600 3420
form work for slab @
staff locker 11.34 m2 600 6804
TOTAL 16134
Reinforcement(matt)
For slab @ staff
DAMILARE canteen
Reinforcement(matt) 1.47 tonne 24000 35280
for slab @ staff
clinic 0.78 tonne 24000 18720
TOTAL 54000

BLOCKS;loading and
EXTRA MANPOWER offloading 5,000
CUMM.TOTAL 303,268
MONEY COLLECTED BALANCE MONEY GIVEN BALANCE MONEY GIVEN BAL/RMK

164433 64,000 100433 100433 Paid off

2,000 61,701 61701 61701 paid off

2,000 14134 10,000 4134 4134 paid off

54,000 54000 38000 16000

5,000 3500 1500 1500 paid off


4,000 299,268 77,500 221768 205768

z
NAMES ACTIVITIES QUANTITY UNIT RATE
Casting of floor slab @
ALFA staff
block locker
work @ staff 32.14 m3 2500
canteen (45% of the total
wall ) 172.67 m2 600
block work @ staff locker
(20% of the total wall ) 89.184 m2 600
TOTAL Block work @ staff
clinic(70% of the total
KINGSLEY wall) 149.14 m2 600
TOTAL

Form work for all lintel@


TAIWO staff canteen 35.9 m2 600
TOTAL
Reinforcement (matt) @
DAMILARE staff locker 1.4 tonne 24000
reinforcement for lintels
only @ staff canteen 0.37 tonne 24000
TOTAL
CUMM.BAL
AMOUNT PREVIOUS BAL TOTAL MONEY GIVEN BALANCE

80350

103602

53510.4
237462.4 237462.4 133860.4 103602

89484
89484 89484 89484 paid off

21540
21540 21540 21540 paid off

33600

8880
42480 16,000 58,480 42480 16,000
390966.4 16,000 406,966 287364.4 119,602
NAMES ACTIVITIES QUANTITY UNIT RATE AMOUNT
Casting of lintels@
ALFA staff canteen 3 m3 2500 7500
casting of columns @
staff
block canteen
work @ staff 3 m3 2500 7500
locker ( 50% of the
total
block workwall )
@ staff 222.96 m2 600 133776
canteen ( 20% of the
total wall ) 76.75 m2 600 46050
TOTAL 194826
Casting of lintels @
KINGLEY staff clinic 1.84 m3 2500 4600
casting of columns @
staff clinic(70% of the
total columns 2.1 m3 2500 5250

TOTAL Form work for all 9850


columns @ staff canteen
66% of the total
TAIWO column) 32.41 m2 600 19446
form work for all
lintels @ staff
form work forclinic
all 21.93 m2 600 13158
columns @ staff clinic
66% of the total
column) 20.46 m2 600 12276
TOTAL 44880
Reinforcement for all
DAMILARE columns @ staff canteen 0.53 tonne 24000 12720
Reinforcement for all
columns @ staff clinic 0.42 tonne 24,000 10080
Reinforcement for
lintel @ staff clinic 0.21 tonne 24,000 5040
TOTAL 27840
LABOUR ( RINGS) 4 days 2000 8000
OTHERS ACCOMODATION 2 rooms 130,000

CUMM.TOTAL 415,396
PREV.BAL TOTAL.BAL MONEY GIVEN REMAINIG BAL

103,600 298,426 194826 103,600

9850 9850

31

44,880 44,880 PAID OFF

16,000 43,840 16,000 27,840


8,000 4000 4000
130,000 75,000 55,000

119,600 534,996 334,706 200,290


NAMES blockWORK
workDONE
@ staff QUANTITY UNIT RATE AMOUNT
locker 20% of the total
ALFA wall 89.184 m2 600 53510.4
casting of columns @
staff locker 5.2 m3 2500 13000
casting of lintels @
staff locker 3.06 m3 2500 7650

block work @ staff


canteen remaining 10%
of the total wall 38.37 m2 600 23022

TOTAL Block work @ staff 97182.4


clinic 20% of the total
KINGSLEY wall 42.61 m2 600 25566

TOTAL Form work for all 25566


columns @ staff locker
(65% of the total
TAIWO column) 29.47 m2 600 17682
Form work for all lintel
@ staff locker 40.12 m2 600 24072
formwork for the roof
beam(70%(38.65m2) of the
total f0rm work) @ staff
canteen with addition of
34%(16.69m2) remaining
for the columns 55.34 m2 600 33204
TOTAL 74958
Reinforcement for all
DAMILARE columns @ staff locker 0.52 tonne 24000 12480
Reinforcement for all
lintels @ stafffor
Reinforcement locker
the 0.42 tonne 24000 10080
roof beam @ staff
canteen 0.79 tonne 24000 18960
TOTAL 41520
EXTRA LABOUR 4 days 2500 10000
ACCOMODATION
OTHERS 16000
CUMM. TOTAL 265226.4
PREV.BAL TOTAL.BAL MONEY GIVEN REMAINING BAL MONEY GIVEN BAL/RMK

445.92

103,600 200,782 70000 130,782 130,782 PAID OFF

9850 35416 35416 35416 PAID OFF

74958 30,000 44,958 19764 PAID OFF

27,840 69,360 30,000 39,360 39360 PAID OFF


4000 14000 14000 14000 PAID OFF
55,000 55,000 55,000 55,000
16000 10,000 6000 6000 PAID OFF
200,290 465,516 140,000 325,516 245,322 55,000
465,516
NAMES WORK DONE QUANTITY UNIT RATE AMOUNT

Form work for the roof beam


@ staff canteen 20% of the
total beam
TAIWO 11.04 m2 600 6624

Reinforcement for the roof


DAMILARE beam @ staff Clinic 0.3 tonne 24000 7200

Reinforcement for the roof


beam @ staff locker(100% of
the total) 0.51 tonne 24000 12240

TOTAL 19440

Miscellenous;nails,petrol,s
and paper and scraper
OTHERS 6000
EXTRA LABOURS site clearance 1 day 2500 2500
OTHERS 10,000

CUMM.TOTAL 44,564
MONEY GIVEN RMK/BAL

1600 5024 not yet paid

19440 not yet paid

6000 PAID OFF


2500 PAID OFF
10,000 PAID OFF

18500 24464
NAMES WORK DONE QUANTITY UNIT RATE AMOUNT
Form work for the roof beam
CARPENTER @ staff cLinic 23.76 m2 600 14256
form work for all columns @
staff clinic 34% of the
total column) 10.54 m2 600 6324
20580
less retention (15%) 3087

Total 17493

previous balance from the


DAMILARE previous valuation 19440

previous balance from the


TAIWO CARPENTER previous valuation 5024

CUMM.TOTAL 41,957
MONEY GIVEBAL
NAMES WORK DONE QUANTITY UNIT RATE AMOUNT

ABASS MANSON Casting of beam @ staff clinic 4.93 m3 2500 12325

casting of columns @ staff


clinic(30% of the total columns 1 m3 2500 2500

Total 14825

previous balance from the


DAMILARE previous valuation 19440

previous balance from the


TAIWO CARPENTER previous valuation 5024

CUMM.TOTAL 39,289
NAMES WORK DONE QUANTITY

30/05/2023 TUE Casting of beam and columns @ staff locker 1 manson,3 labour

ditto but with 1


31/05/2023 WED ditto-contd carpenter&labour
01/06/2023 THUR ditto-contd ditto
1 manson,2 labour
completion of beam and columns @ staff locker
with 1
and casting of chambers for the concrete pipes carpenter&labour
02/06/2023 FRI
1 manson,1 labour
with 1
03/06/2023 SAT Casting of chambers carpenter&labour

Total

DAMILARE previous balance from the previous valuation

TAIWO CARPENTER previous balance from the previous valuation

CUMM.TOTAL
UNIT RATE AMOUNT

manson;4000 ,la
4 manpower bour;2500 11500
manson;4000 ,la
bour;2500,carpe
6 manpower nter ;4000 18000
ditto ditto 18000

5 manpower ditto 15500

4 manpower ditto 13000

76000 SUB TOTAL

19440

5024 Annuled

95,440
NAMES WORK DONE QUANTITY

Form work for the roof beam @ staff locker


(45.66m2) with the additional 35% of columns
remaining to board(22.75m2) which makes a
total of (68.41m2-but only 80% of this total as
been archived till date)
CARPENTER 54.728

Less 10% retention


Total

previous balance from the previous


DAMILARE valuation

CUMM.TOTAL
UNIT RATE AMOUNT

m2 600 32836.8

3283.68
29553.12 SUB TOTAL C

19440

48,993
DATE CARPENTER AHMED NEW MANSON LABOURS RATE
12/06/2023 MON
13/06/2023 TUE 4,000.00 3,000.00 4,000.00 3 2,500.00
14/06/2023 WED 4,000.00 3,000.00 4,000.00 2 2,500.00
15/06/2023 THUR 2,500.00 2,500.00 2,500.00 3 1,500.00
16/06/2023 FRI 3,000.00 4,000.00 2 2,500.00
17/06/2023 SAT 4,000.00 1 2,500.00
TOTAL 14,500.00 11,500.00 14,500.00

Sub-Total
Previous Balance

NET BALANCE

NOTE;

THIS COMPRISES THE


CASTING OF
CHAMBERS,CLEANING OF
REMOVED
RINGS,FORMWORK FOR
BOTH CHAMBER AND
BEAM ,CASTING OF
BEAMS E.T.C
AMOUNT

7,500.00
5,000.00
4,500.00
5,000.00
2,500.00
24,500.00

65,000.00
11,000.00

76,000.00
DATE CARPENTER MICHEAL LABOURS RATE AMOUNT
18/06/2023 SUN 4,000.00 1 2,500.00 2,500.00
19/06/2023 MON 4,000.00 4,000.00 2 2,500.00 5,000.00
20/06/2023 TUE 4,000.00 4,000.00 2 2,500.00 5,000.00
21/06/2023 WED 4,000.00 4,000.00 3 2,500.00 7,500.00
22/06/2023 THUR 4,000.00 4,000.00 4 2,500.00 10,000.00
23/06/2023 FRI 4,000.00 4,000.00 4 2,500.00 10,000.00
24/06/2023 SAT 1 2,500.00 2,500.00
TOTAL 24,000.00 20,000.00 42,500.00
Sub-Total 86,500.00
Previous Balance

SUB-TOTAL B 86,500.00

NOTE;

THIS COMPRISES THE


CASTING OF
BBEAMS,FORMWORK FOR
BEAM,TYROLIN ,CHISELLIN
G OF MANHOLE TO RECEIVE
WATER FROM
ROAD ,CASTING OF
CHAMBERS AND FORM WORK
FOR CHAMBERS E.T.C
NAMES WORK DONE QUANTITY UNIT
ABASS MANSON Wall plastering at staff canteen 185.6325 m2
Block work @ staff locker remaing 5% of the
total wall 44.592 m2

Total

CARPENTER 1 day job

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
RATE AMOUNT MONEY GIVEN BALANCE
520 96528.9 Dinning area 100.089 40000 56528.9

600 26755.2 Dish wash 13.3245


Store 26.607
123284.1 Kitchen 45.612

4000 4000

19440

127,284 60,529
NAMES WORK DONE QUANTITY UNIT RATE
ABASS MANSON Wall plastering at staff canteen 260.805 m2 520

Total

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
AMOUNT
135618.6

locker 46.836
t1 44.136
135618.6 PAID Terrace 28.413
store 30.879

19440 prep A 32.454

Terrace 30.87
locker 47.217
155,059

s
NAMES WORK DONE QUANTITY UNIT
Wall plastering at staff
ABASS MANSON canteen(Remaining quantity) 195.512 m2
Wall plastering at staff locker 161.772 m2
Block work (additional works) 3.78 m2

Total

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
RATE AMOUNT

520 101666.24
520 84121.44
600 2268
locker
188055.68
Male locker

19440

207,496
NAMES WORK DONE QUANTITY UNIT RATE

ABASS MANSON Wall plastering at staff locker 415.9303 m2 520

Total

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
AMOUNT

216283.756

216283.756

19440

235,724
NAMES WORK DONE QUANTITY
ABASS MANSON Wall plastering at staff locker 259.8855

Erecting new walls to cover openings at 3 entries,female toilet


and as well building another walls internally to replace the
previous wall at male lockers .and erecting new wallst to cover
the previous entrace at staff clinic 27.9195
Erecting blocks for the Counter slab (2 days job)
Total

Demolition of walls,packing broken blocks and


2 extra labour loading/offlloading of blocks 4

Carpenter Formwork for all new lintels (8nrs)


Iron bender Reinforcement for all new lintels(8nrs)
SUB TOTAL

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
UNIT RATE AMOUNT
m2 520 135140.46 Female locker&entry 57.567
Female shower 41.256

m2 600 16751.7 Female toilet 26.88


13000 Laundry renovated part 41.292
164892.16 Senior shower 32.379
The two service duct 32.13

Entry at the male


Days 5000 20000 locker (replaced) 28.3815

8000
6000
198892.2

19440

218,332
NAMES WORK DONE QUANTITY

ABASS MANSON Wall plastering at staff locker 57.0525

Wall plastering at clinic 44.787


Erecting new walls to cover window openings and as
well building another walls internally to replace the
previous wall at male lockers . 22.3935
Ground floor screeding at laundry 42.3099
Dressing of windows,and slab top
Total
Demolition of walls,packing broken blocks and
loading/offlloading of blocks ,casting of
2 extra labour slab etc. 4

Carpenter Formwork for laundry slab


Iron bender Reinforcement for laundry slab

SUB TOTAL

DAMILARE previous balance from the previous valuation

CUMM.TOTAL
UNIT RATE AMOUNT

m2 520 29667.3

m2 520 23289.24 Entry at the male locker (re

m2 600 16436.1 Wall replaced at senior lock


m2 350 14,808.47 Window covered
9000 Walls below counter slab
93201.105 Office room

Days 5000 20000

12000
3000

128201.105
19440

147,641
28.3815

3.591
11.4
13.68
44.787
NAMES WORK DONE QUANTITY UNIT RATE
Wall plastering at staff
ABASS MANSON locker(externally) 42.4 m2 520

Ground floor screeding at laundry 21.40 m2 350.00


Wall plastering at staff clinic 23.21 m2 520.00
Dressing of 3 windows and edge of
counter slab
TOTAL
Extra labour for wall
robus packing and wall
breaking 2 days job 2 Days 2500

SUB TOTAL

DAMILARE previous balance from the previous valuation

CUMMULATIVE TOTAL
AMOUNT

22048 Observation
room just two
sides of the
7,490.00 room 23.21
12071.28

3000
44609.28

5000

49609.28

19440

69049.28
NAMES WORK DONE QUANTITY UNIT RATE

Wall plastering at staff


ABASS MANSON clinic(internally ) 283.3671 m2 520

Wall plastering at staff


clinic(externally) 59.86 m2 520.00

TOTAL

DAMILARE previous balance from the previous valuation

CUMMULATIVE TOTAL
AMOUNT

147350.892 Reception or awaiting are 73.6224

### Treatment room 35.91

178476.948 Toilet 25.8084


Lobby 16.5672
Store 24.2586

Office toilet 24.2586


Consulting room 37.6569
19440 Observation room 19.5564
Observation room toilet 25.7238
19440
West elevation (externall 59.8578
NAMES WORK DONE QUANTITY UNIT

Wall plastering at staff


ABASS MANSON locker(externally ) 106.38 m2

Door dressing,patching of already


plastered wall that was destroyed
by those MEP

TOTAL

DAMILARE previous balance from the previous valuation

CUMMULATIVE TOTAL
RATE AMOUNT

520 55317.6

3,000.00 >Cost approved by engr david STAFF LOCKER

58317.6 STAFF CANTEEN

STAFF CLINIC

19440

77757.6
EXTERNAL WALL PLASTERING Actual
Total Actual quantity of
This weeks Previous quantity quantity of Percentage the whole job
quantity quantity obtained the whole job of plastered in the bill
obtained (m2) obtained(m2) (m2) (m2) archive (%) (m2)

106.38 42.4 148.78 341.3 43.59 348.3

0 0 0 - 402

0 59.86 59.86 154.85 38.66 182.6


NAMES WORK DONE QUANTITY UNIT RATE AMOUNT

Wall plastering at staff


ABASS MANSON locker(externally ) 187.628 m2 520 97566.56

TOTAL 97566.56

DAMILARE previous balance from the previous valuation 19440

CUMMULATIVE TOTAL 117006.56


EXTERNAL WALL PLASTERING

This weeks
quantity Previous
obtained quantity Total quantity
(m2) obtained(m2) obtained (m2)

STAFF LOCKER 187.628 148.78 336.408

STAFF CANTEEN 0 0 0

STAFF CLINIC 0 59.86 59.86


Actual Percentag Actual
quantity e of quantity of
of the plastered the whole job
whole job archive in the bill
(m2) (%) (m2)

341.3 100% 348.3

- 402

154.85 38.66 182.6


NAMES WORK DONE QUANTITY UNIT RATE
Wall plastering at
staff clinic
ABASS MANSON (externally ) 115.314 m2 520
Wall plastering at
staff canteen
(externally ) 78.924 m2 520
Staff locker block
work
(10%retention )

TOTAL

DAMILARE previous balance from the previous valuation


AMOUNT EXTERNAL WALL PLASTERING
This weeks
quantity obtained Previous quantity
59963.28 (m2) obtained(m2)

41040.48 STAFF LOCKER 187.628 148.78

29750
STAFF CANTEEN 78.924 0

130753.76 STAFF CLINIC 115.314 59.86

19440
L WALL PLASTERING Actual quantity of
quantity of Percentage of the whole job
Total quantity the whole job plastered in the bill
obtained (m2) (m2) archive (%) (m2)

336.408 341.3 100% 348.3

78.924 - 402

175.174 175.174 100% 182.6


NAMES WORK DONE QUANTITY UNIT RATE AMOUNT

Wall plastering at
staff canteen
ABASS MANSON (externally ) 160.578 m2 520 83500.56

TOTAL 83500.56

DAMILARE previous balance from the previous valuation 19440


EXTERNAL WALL PLASTERING

Total
This weeks Previous quantity Actual quantity
quantity obtained quantity obtained of the whole
(m2) obtained(m2) (m2) job (m2)
STAFF LOCKER 187.628 148.78 336.408 341.3

STAFF CANTEEN 160.578 78.92 239.498 302.94

STAFF CLINIC 115.314 59.86 175.174 175.174


Actual
quantity of
Percentage of the whole job
plastered in the bill
archive (%) (m2)
100% 348.3

79.06 348

100% 182.6
NAMES WORK DONE QUANTITY UNIT RATE AMOUNT

Wall plastering at
staff canteen
ABASS MANSON (externally ) 40.54 m2 520 21080.8

TOTAL 21080.8

DAMILARE previous balance from the previous valuation 19440


EXTERNAL WALL PLASTERING

This weeks Previous


quantity quantity Total quantity
obtained (m2) obtained(m2) obtained (m2)
STAFF LOCKER 187.628 148.78 336.408

STAFF CANTEEN 40.54 239.498 280.038

STAFF CLINIC 115.314 59.86 175.174


Actual
quantity of
Actual quantity Percentage the whole
of the whole of plastered job in the
job (m2) archive (%) bill (m2)
341.3 100% 348.3

302.94 92.44 348

175.174 100% 182.6

589978.08
NAMES WORK DONE QUANTITY UNIT

Wall plastering at staff


ABASS MANSON canteen (externally ) 22.878 m2

TOTAL

DAMILARE previous balance from the previous valuation


RATE AMOUNT
This weeks
quantity
520 11896.56 obtained (m2)
STAFF LOCKER 187.628

11896.56 STAFF CANTEEN 22.878

STAFF CLINIC 115.314

19440
EXTERNAL WALL PLASTERING Actual quantity
Actual quantity Percentage of of the whole
Previous quantity Total quantity of the whole plastered job in the bill
obtained(m2) obtained (m2) job (m2) archive (%) (m2)
148.78 336.408 341.3 100% 348.3

280.038 302.916 302.94 100% 348

59.86 175.174 175.174 100% 182.6


242213.76

218099.52

126125.28

586438.56
NAMES WORK DONE QUANTITY UNIT RATE

Floor screeding not


exceeding 50mm-100mm
ABASS MANSON @ staff clinic 99.4436 m2 350

Floor screeding not


exceeding 50mm-100mm
@ staff canteen 145.62 m2 350

TOTAL

DAMILARE previous balance from the previous valuation


AMOUNT

34805.26 Staff clinic 99.4436

50967 Staff canteen 145.6287

85772.26

19440
NAMES WORK DONE QUANTITY

Floor screeding not exceeding


ABASS MANSON 50mm-100mm @ staff canteen 106.47

TOTAL

DAMILARE previous balance from the previous valuation


UNIT RATE AMOUNT

m2 350 37264.5
Staff canteen(REM) 116.4504

37264.5

19440
NAMES WORK DONE QUANTITY UNIT RATE AMOUNT
Floor screeding not
exceeding 50mm-
100mm @ staff
ABASS MANSON locker 178.789 m2 350 62576.15

TOTAL 62576.15

DAMILARE previous balance from the previous valuation 19440


Staff locker rem 178.789
Laundry 47.3661

Total 226.1551
NAMES WORK DONE QUANTITY UNIT RATE
Floor screeding not
exceeding 50mm-100mm
ABASS MANSON @ Admin block 245 m2 350

Cleaning @ admin
block half payment

TOTAL

DAMILARE previous balance from the previous valuation


AMOUNT Informal
meeting/open
office/head
85750 it 71.2402
Meeting
room/private
room/corridor 29.9054

20000 Passage 3.933


Toilets 16.8924
Jotted part(Re 99.4363 20.8254
105750 Doorways 1.863

Total 223.2703

19440
NAMES WORK DONE QUANTITY UNIT
Floor screeding not
exceeding 50mm-100mm
ABASS MANSON @ Admin block 129.475075 m2

TOTAL

DAMILARE previous balance from the previous valuation


RATE AMOUNT

350 45,316.25 Entry foyer 30.644925


Room
Office 23.6439
reception and
waiting room 45.35577
Passage 8.91
Under staircas 13.28448
45,316.25 Destroyed part 6.394
Door ways 1.242
Total 129.475075

19,440.00
NAMES WORK DONE QUANTITY UNIT

Floor screeding not exceeding


ABASS MANSON 50mm-100mm @ Admin block 69.84 m2

TOTAL

DAMILARE previous balance from the previous valuation

100.8239
RATE AMOUNT

350 24,442.71 Jotted


part
(entry/st
aircase) 69.836313386

24,442.71

19,440.00
NAMES WORK DONE QUANTITY UNIT RATE

Floor screeding not exceeding


ABASS MANSON 50mm-100mm @ Admin block 30.99 m2 350

TOTAL
AMOUNT

11,930.22
Jotted
part
(entry/s
taircase
) 30.987586614

11,930.22