FIELD PAINTING REPORT

INSPECTION CHECK LIST


DOC#: AF-PK-FPR-001
REPORT No.: DISCIPLINE: EQP No: VCM Tank TK 5102A
Bottom Plate
VCM Tank TK 5102A Bottom LOCATION:
Plate Blasting (Soil Side) at ARABIAN FAL YARD
Arabian Fal Yard
DATE:

ITEM
NO. ACTIVITY SIGNATURE DATE
1 Handling and storage of materials are as per relevant specification

2 Abrasive and coating material certifications are as per specification or


approved by OWNER.
3 Daily activities weather conditions are record and all information are as
per paint specification
4 Degree of surface preparation/blasting is as per paint manufacture’s
specification and project specification.
5 Time lapse between blasting and coating is as relevant specification
6 Mixing of paint is as per paint manufacture’s specification
7 Application of paint is in accordance with specification
8 Coating overlap has been applied as specified
9 Coating curing is as per paint manufacture’s recommendation
10 Rejected area have been repaired and released prior to the next coating
11 Over-coating interval Min/Max are as per paint manufacturer data sheets
12 Final inspection all W.F.T/D.F.T checks for each coat have been
performed as per specification
APPROVALS ARABIAN PETROKEMYA REMARKS
FAL

NAME REHANUL HAQUE

SIGNATURE

DATE
FIELD PAINTING RECORD
DOC: AF-PK-FPR-002
REPORT No: DISCIPLINE: EQP No: VCM Tank TK 5102A
Bottom Plate
VCM Tank TK 5102A Bottom Plate
Blasting (Soil Side) at Arabian Fal LOCATION:
DATE: Yard ARABIAN FAL YARD

DAILY HUMIDITY READING’S


TIME 8:00 10:00 13:00 15:00 17.00 WEATHER
AIR TEMP (C)
HUMIDITY (%)
CONDITIONS:
SURFACE TEMP (C)
DEW POINT (C)

SURFACE PREPARATION
LOCATION: SURFACE PREP: SURFACE PREPARATION BY:
St2  St3  BLASTING  POWER TOOL 
ABRASIVE: Garnet 30/60 Sa3  Sa2½  Sa2  Sa1  HAND-TOOL  SOLVENT 
mesh
COATING APPLICATION
LOCATION: APPLICATION METHOD: A/S  C/S  BRUSH  ROLLER  OTHERS 
PAINT DFT (µm) PAINT MATERIAL BATCH No. DEFECT
SCHEME MIN MAX AVE. MANUFAC SPEC BASE CATALYST CODE
TURER
1ST COAT

DEFECT CODE :
1. PREPARATION INADEQUATE. 4. HOLIDAYS 7. SAGS 9.OTHER
2. OVER/DOWN RE-COAT INTERVAL 5. BRUSH MARKS 8. RUNS
3. INSUFFICIENT D.F.T 6. OVERSPRAY

Salt Value:

COMMENTS:

APPROVALS ARABIAN FAL REMARKS


PETROKEMYA
NAME REHANUL HAQUE

SIGNATURE

DATE