BR No 50451562
Site Address SPOC S24 - TUNGKU
Audit Date Start Date 30 January, 2023 End Date 2 February, 2023
Page 1 of 156
Table of Contents
Page 2 of 156
SECTION 1.0 PUBLIC SUMMARY REPORT
Name of Certification
Date of Certification: Click or tap to enter a date.
Valid Until: Click or tap to enter a date.
Page 4 of 156
2.2 Location Map
Map showing geographical location, with close -up of the certified entity (estates) with geographical
coordinate
Page 5 of 156
939C5_AUDIT REPORT_MS2530 PART 2_VER 11_27052022 SPOC S24 AA4 2022-05-27
All aspects of the audit are considered confidential
Page 6 of 156
939C5_AUDIT REPORT_MS2530 PART 2_VER 11_27052022 SPOC S24 AA4 2022-05-27
All aspects of the audit are considered confidential
Page 7 of 156
939C5_AUDIT REPORT_MS2530 PART 2_VER 11_27052022 SPOC S24 AA4 2022-05-27
All aspects of the audit are considered confidential
Page 8 of 156
939C5_AUDIT REPORT_MS2530 PART 2_VER 11_27052022 SPOC S24 AA4 2022-05-27
All aspects of the audit are considered confidential
Page 9 of 156
939C5_AUDIT REPORT_MS2530 PART 2_VER 11_27052022 SPOC S24 AA4 2022-05-27
All aspects of the audit are considered confidential
Page 10 of 156
3.0 Assessment Process
Page 11 of 156
4.0 Audit Agenda
BR Number 50451562
Company Name & Address SPOC S24 (TUNGKU)
Stesen Penyelidikan MPOB Lahad Datu, Kilometer 10,
Jalan Tengah Nipah, Beg Berkunci No. 4, 91109 Lahad
Datu, Sabah, Malaysia
Site (s) SPOC S24 - (TUNGKU)
Standard MS2530-2 :2013 (Part 2): General Principles for Independent
Smallholders.
Type of Audit Surveillance Audit 4
Audit Method On site audit
Surveillance audit
1. Changes to the certified client and its management system
2. Verification continuous management system implementation
3. Review of effectiveness of measures arising from the previous audit (if applicable)
4. Confirmation of fulfillment of certification requirements
5. Enquiries on aspects of certification (Complaints)
6. Review of any client's statements with respect to its certified operations (e.g. promotional
material, website, use of DQS logos and marks, use of the certificate)
7. Customer specific requirements
8. Others:
Page 12 of 156
Opening meeting items
Introduction of the participants, including an outline of their roles
Confirmation that the audit team leader and audit team representing the certification body is responsible
for the audit and shall be in control of executing the audit plan including audit activities and audit trails
Confirmation of the audit plan (including audit type, audit scope, audit objectives and audit criteria), any
changes, and other relevant arrangements with the client, such as the date and time for the closing
meeting, interim meetings between the audit tea
Confirmation of formal communication channels between the audit team and the company
Confirmation that the resources and facilities needed by the audit team are available
Confirmation of the availability, roles and identities of any guides and observers
Confirmation of relevant work safety, emergency and security procedures for the audit team
The method of reporting (action plan, audit report), including any grading of audit findings (conformity,
nonconformity major and minor)
Information about the conditions under which the audit may be prematurely terminated
Confirmation that, during the audit, the company will be kept informed of audit progress and any concerns
certification body
The method and timeframe of reporting, including any grading of audit findings
the certification body's process for handling nonconformities including any consequences relating to the
The timeframe for the client to present a plan for correction and corrective action for any nonconformities
identified during the audit
Page 13 of 156
- correction, root cause and corrective action: 5 business days
- evidence of implementation of corrective actions for major nonconformities: 90 days
Page 14 of 156
Time Subject; process Refere Unit; Participants Auditor(s)
nce depart
ment
Date: Day 1 30/01/2023 MON
0800 - Central Management JO/SAR/SAH
Opening Meeting Office Representative/GM
0830 Criterion 4.1.1: MSPO
Policy MS2530:2 Management JO
Criterion 4.1.2: Continual Principle 1 Central Representative/GM
Improvement Office
0830
MS2530:2 Management SAR
Criterion 4.2.1: Traceability
Principle 2 Central Representative/GM
Office
Page 15 of 156
resources
Criterion 4.5.5: Status of
rare, threatened, or
endangered species and high
biodiversity value area
Criterion 4.5.6: Zero
burning
Practices
1000 Criterion 4.6.1: Site
Management
Criterion 4.6.2: Economic MS2530:2 Central Management
and financial viability plan Principle 6 Office JO
Representative/GM
Criterion 4.6.3: Transparent
and fair price dealing
Page 16 of 156
Time Subject; Reference Unit; Participants Auditor(s)
process department
Date: Day 2- 31/01/2023 TUE
0800 Site Visit GM/
SPOC S24
assessment MS2530:2 Management
(Tungku) JO/SAR/SAH
Site 11 - 18 Representative
1200 Lunch Break
JO/SAR/SAH
1700 to Stakeholder
1800 Selected JO
Consultation by
Stakeholder:
phone Call
Page 17 of 156
Time Subject; process Reference Unit; Participants Auditor(s)
department
Date: Day 4- 02/02/2023 THU
Page 18 of 156
5.0 Summary of Audit Results
5.1 Audit Summary and Recommendation for Certification
This report details the audit results including strengths, opportunities, and weaknesses. These results were presented to your
management at the closing meeting of the audit. You can use these results to improve the effectiveness of your management
system. We look forward to continuing our partnership towards sustainable business success.
Please remember to notify DQS about any significant change to your management system at your earliest convenience. Together we will then
coordinate appropriate measures to maintain your current certification.
Page 19 of 156
Issue raised during Yes Not Applicable
Stakeholder Consultation? Acknowledge
Page 20 of 156